WRRDA and WRDA: How are they different, and does it make any difference? Inland Rivers, Ports and Terminals, Inc. Tuesday, April 29, 2014 James A. Kearns.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
Advertisements

US Army Corps of Engineers Budgeting Process
AASHTO Freight Update WRDA, PRIIA and MAP-21 Chris Smith Intermodal Policy and Program Manager American Association of State Highway and Transportation.
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
Tribal Consultations. Topics FY12 Extensions and IRR Program Funding MAP-21 Programs and Funding.
1 Ports and Harbors – Transitions and Challenges Ms. Doris J. Bautch Commissioner, U.S. Section of PIANC U.S. Maritime Administration Presented at the.
House Bill 2 and P3 Update Aubrey Layne Secretary of Transportation December 17, 2014.
SENATE BUDGET AND EVALUATION OFFICE Overview of the Georgia State Revenues and Budget Slides are up to date as of 4/29/10. Please note that numbers are.
Washington Port Issues Washington State Freight Advisory Committee Seattle, WA December 9, 2013.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
Developing Navigation Performance Measures Barry Holliday Navigation Program Manager US Army Corps of Engineers Headquarters Washington, DC 14 December.
1 Understanding Revenue Allocation Districts (“RADs”) Prepared for the Jersey City Redevelopment Agency Presented by: Glenn F. Scotland, Esq. & Jennifer.
Ports and Waterways: A State DOT Perspective Secretary Sherri H. LeBas, P.E. April 29, 2015.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Budget Politics PS 426 April 7, Budget categories, 2008.
Module 10 Step 3 Initial Study Funding (incl. Civil Works Budget Process) Civil Works Orientation Course - FY 11.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
Coastal Texas Protection and Restoration Project
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
Regional Policy Major projects approval process in Brendan Smyth DG REGIO.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Federal Energy Management Program Key Provisions of Current Legislation Renewable Working Group September 10, 2002 Nancy Carlisle NREL.
Legislative Opportunities and Impediments - The Virginia Experience Virginia Public Private Partnerships ATRA TECHNIX Program Phil Bomersheim “Activist”
Inland Waterways: The National Perspective Amy Larson Executive Director National Waterways Conference, Inc PNWA Annual Meeting.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
NARFE LEGISLATIVE CONFERENCE March 2011 – Alan Lopatin and Julie Tagen.
“Getting the Funding Right” Kim Koleos Juris Doctor, University of Florida.
Soy Transportation Coalition National Waterways Conference March 28, 2012.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
The Economic Impact of the Inland Rivers and the Vessels That Serve Them 2012 National Homeland Security Conference May 22, 2012 Dennis Wilmsmeyer, Presenter.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
Paul Rohde Water Resources (& Reform) Development Act 113 th Congress.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Budgets and Appropriations: Restoring our Infrastructure Budgets and Appropriations: Restoring.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
Building Strong! May Deep Draft Navigation Cost Sharing Jeremy LaDart Office of Water Project Review HQUSACE.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
North Dakota Water Funding 2013 Legislative Session May 13, 2013 NDACo Legislative Wrap-up Jean Schafer – North Dakota Water Coalition.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Budgets and Appropriations: Restoring our Infrastructure Budgets and Appropriations: Restoring.
Public-Private Partnerships at POEs Spring 2014 Transportation Border Working Group 1.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
THE LEADING ADVOCATE FOR LOCAL GOVERNMENT SINCE 1982 Federal Advocates Annual Report to the Board of Supervisors San Joaquin County California Tuesday,
Time for Public-Private Partnerships for U.S. Navigation Projects Dominic Izzo PE – KBR Director, PIANC Commissioner Karim El Kheiashy PhD, MBA, PE – KBR.
1 Coal Handling & Storage Conference 2015 Paul Rohde, Vice President Waterways Council, Inc.
Mark R. Pointon Operations/Navigation COP U.S. Army Corps of Engineers Mark R. Pointon Operations/Navigation COP U.S. Army Corps of Engineers Presentation.
1 Smart Rivers Conference September 15, 2011 New Orleans, Louisiana “Status of Inland Waterways Infrastructure Funding”
Let’s talk about the Illinois Waiver Proposal. FIRST What is a Waiver? and Why is it important?
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
THE LEADING ADVOCATE FOR LOCAL GOVERNMENT SINCE 1982 Federal Advocates Annual Report to the Board of Supervisors San Joaquin County California Tuesday,
Fiscal Policy= Congress+ President Budget: – A policy document allocating burdens (taxes) and benefits (expenditures). Deficit: – An excess of federal.
US Army Corps of Engineers BUILDING STRONG ® OVERVIEW OF THE CIVIL WORKS PROCESS Planning Principles & Procedures – FY 11.
Budget Presentation 2010/2011 – 2013/2014 All Communities 28 January 2010.
EM-1 Office of Environmental Management SAFEGUARDS AND SECURITY Post September 11 events have required EM to increase the level of protection at DOE sites.
Texas GLO & US Army Corps Join on Texas Upper Coast Storm Barrier Study.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Detroit River International Crossing Project March 31, 2010.
US Army Corps of Engineers BUILDING STRONG ® 1 Inland Marine Transportation System Capital Investment Strategy Jeanine Hoey, PE, PMP Program Manager 15.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
Healthcare Reform: Where do we go from here?
AASHTO Freight Update WRDA, PRIIA and MAP-21
Continuing Authorities Program
Civic Center Sports Field Study Session & Quarterly Update
Established. Informed. Engaged.
Canadian Navigable Waters Act
STF – Adopted Budget October 2017
Presentation transcript:

WRRDA and WRDA: How are they different, and does it make any difference? Inland Rivers, Ports and Terminals, Inc. Tuesday, April 29, 2014 James A. Kearns

Water Resources (and Reform) Development Act S. 601—Water Resources Development Act Passed by Senate on May 14, 2013 (83-14) H.R. 3080—Water Resources and Reform Development Act Passed by House on October 23, 2013 (417-3) In conference committee....

Benchmark: Capital Development Plan Issued by Inland Waterways Users Board in 2010 Key elements in Capital Development Plan that are NOT in either Senate or House version: –Dams and major lock rehabilitation projects of less than $100 million not subject to cost sharing from Inland Waterways Trust Fund –Cap on cost sharing from Inland Waterways Trust Fund for project costs in excess of original cost estimate –Increase in fuel tax to provide additional revenue to Inland Waterways Trust Fund Assume that items not in either bill to begin with will not be included in final result from conference committee.

Selected Differences Between Bills Items affecting use of IWTF funds –IWTF cost sharing for Olmsted –Threshold for “major rehabilitation” definition Alternative sources of funding for inland waterways Process for selecting projects Mississippi River port dredging

Items Affecting Use of IWTF Funds IWTF cost sharing for Olmsted –S Retains current cost-sharing arrangement between IWTF and general funds, except no further funds from IWTF to complete Olmsted –H.R – Retains current cost-sharing arrangement, but reduces contribution to Olmsted to 25% of cost “Major rehabilitation” threshold –S. 601 – Raises threshhold to $20 million, at which point IWTF cost- sharing is required –H.R – no provision

Alternative Sources of Funding for Inland Waterways No fuel tax increase in either bill, as noted above. S. 601 § 7005: –“(1) It is the sense of Congress that existing revenue sources for inland waterways construction and rehabilitation activities are insufficient to cover the costs....” –“(2) The issue described in (1) should be addressed.” H.R. 3080, § 214: –Secretary of Army and Secretary of Treasury to conduct 1-year study of feasibility of tax-exempt bonds secured by proceeds in IWTF, plus other revenue options, including user fees. –Secretary to conduct stakeholder roundtable and report to Congress within 6 months after submitting report from feasibility study.

Alternative Sources of Funding for Inland Waterways S. 601, § 2039: Pilot program for 5 years to accept and spend funds contributed by non-federal interests “to increase hours of operation.” –But Committee Report says decisions by the Corps on lock hours of operations “shall remain solely based on commercial traffic.” –Intended to accommodate “requests by local communities for specific and unique activities requiring locks to be operated outside the established levels of service.” H.R. 3080, § 109: Similar to S. 601, but permanent authority and broader scope. –Committee Report: “to ensure traffic is not unduly impacted on the inland navigation system”

Pilot Projects for Public-Private Partnerships S. 601 – Pilot program “to evaluate cost effectiveness and project delivery efficiency of allowing non-Federal interests to carry out flood risk management, hurricane and storm damage reduction, coastal harbor and inland channel navigation, and aquatic ecosystem restoration projects.” H.R. 3080: Pilot program “to evaluate cost effectiveness and project delivery efficiency of allowing non-Federal interests to carry out authorized water resources development projects for coastal harbor improvement, channel improvement, inland navigation, flood damage reduction, aquatic ecosystem restoration, and hurricane and storm damage reduction.

New Soy Transportation Coalition Study Earlier study (January 2013) by Texas Transportation Institute for United Soybean Board: “New Approaches for U.S. Lock and Dam Maintenance and Funding” New study funded by soybean checkoff, conducted by The Horinko Group: “Proposed Public-Private Partnership –Announced by Soy Transportation Coalition on April 28, 2014 (Mike Steenhoek speaking tomorrow morning) –Lease versus ownership –Maintenance and operation versus construction –Initial candidates: Peoria & LaGrange on lower Illinois River and Locks 24, 25, Melvin Price and 27 on Upper Mississippi River

Process for Selecting Projects Issue of extent to which projects require review and approval by Congress CQ Roll Call, February 7, 2014: –“Conference negotiators have agreed on a framework for selecting the flood-control, navigation and ecosystem restoration projects that would be eligible for funding in a water resources authorization.” –“Details of agreement between … [Senator] Barbara Boxer and [Congressman] Bill Shuster were unavailable. –But settling on a framework for project selection signals a breakthrough on what had been the biggest remaining obstacle to a conference agreement reconciling the differences between [S. 601 and H.R. 3080].”

Mississippi River Port Dredging S. 601: $25 million per year authorized for Operations and Maintenance budget of Corps of Engineers to dredge shallow draft port on Mississippi River H.R. 3080: No corresponding provision

What Happens Next?