S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE BY Awad S. Hanna Associate Professor Department of Civil and Environmental Engineering The University.

Slides:



Advertisements
Similar presentations
Assess start-up Requirements
Advertisements

Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Construction Engineering 221 Cost Estimating and Bidding II.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008.
The Risks and Rewards of Contractor Bids and Proposals.
Understanding Your Financial Requirements
Cost Planning & Scheduling CTC-415. Bid Estimate Becomes the project budget upon signing of contract Can cost load the schedule –Effective means of cost.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
Welcome to Financial Series #1 The Income Statement.
Analyzing an Income & Cash Flow Statement Oğuz Benice Bilkent University School of Tourism & Hotel Management.
Chapter 12 Auditing the Human Resource Management Process McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved.
Setting the Right Price. “Underpricing is one of the most common mistakes home-based businesses make.” SLIDE 1 Setting the Right Price.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
DR. DAWNE MARTIN MKTG 241 MARCH 15, 2011 Pricing, Start-Up Costs and Cash Flows.
Charter Partners Institute eVenture Financial Case Guide Note: This is only a guideline. Presentations should be adapted to bring out the important financial.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Setting the Right Price. Lesson Goals: Learn how to: –Calculate total costs –Calculate a profit margin –Use break-even analysis Identify the difference.
Professional Issues Slide 1 The Structure of Organisations & Finance Costs and Prices.
RONALD S. MARTA, CPA BUSINESS COUNSELOR UNIVERSITY OF HOUSTON PROCUREMENT TECHNICAL ASSISTANCE CENTER April 11, 2013.
SMALL BUSINESS RESOURCE GUIDE CHECKLIST FOR GOING INTO BUSINESS.
Section  Cost of Sales -Product inventory, raw materials, manufacturing equipment, shipping, packaging, shipping insurance, warehousing.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
1 The George Washington University School of Engineering & Applied Science Department of Electrical & Computer Engineering Engineering Economic Analysis.
Budget Cost Justification. What is a Budget Assigning specific amounts of money to specific areas in a fiscal year.
Real Estate Investment Chapter 11 Tools of Analysis © 2011 Cengage Learning.
Technical Manager; Bechtel Oil, Gas & Chemicals.
BOWL. EAT. DRINK. DANCE. PROMOTION Awareness Campaign Affiliation with University Clubs Bowling Leagues Host Beer nights Host local DJs Social Media.
Costs Associated with Owning and Operating a Small Business.
Production, Marketing and Administrative costs Manufacturing companies convert materials into finished goods. There are two type of costs involved here:
Estimating Project Cost The total project cost includes both direct and indirect costs. Materials, supplies, and labor used in a project are called "direct.
1 Woonsocket Education Department Woonsocket Education Department FY14 Budget Presentation Giovanna Donoyan, PHD Superintendent of Schools May 2013.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
E-Business Consultancy Setting Your Fees.  Client wants you to do the work in its entirety just as proposed  You have to be scientific about your fees.
1 CS 501 Spring 2003 CS 501: Software Engineering Lecture 7 Business Aspects of Software Engineering.
Business management is frequently faced with making decisions about price. How will I set prices? What should pricing accomplish? What about “loss-leaders”?
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
TC 842 Budgeting. Producers do it--but have little or no training in it. predict the future world of projections in business, budgets are accepted way.
Budgeting and Cost Estimation Objective: – Introduce some simple concepts regarding developing project budgets and cost projections.
The Decision Maker. Managing a Profitable Company.
1 Business Aspects of Software Engineering SWE 513.
Financial Statements Business Plan.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
E STIMATING : G OALS, O BJECTIVES, AND R ISK I SSUES BY Awad S. Hanna Associate Professor Department of Civil and Environmental Engineering The University.
Markup vs. Margin Margin is the amount of gross profit, net profit, or overhead, compared to volume of work. (Expressed as a percentages) Markup is the.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 4 STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE.
4. Price Labor, Materials, and Equipment Ⓒ. L ABOR C OST Six Components to the Labor Cost: 1. Wages 2.Worker's Compensation Insurance 3.FICA Tax, Federal.
LEARNING AIM A: Understand the costs involved in business and how businesses make a profit.
C. Financing a Small Business 4.00 Explain the fundamentals of financing a small business Identify the start-up costs associated with owning and.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
 The costs of operating a business are often called overhead expenses.
Is There a Proper Accounting for Indirect Costs?
CHANGING PROJECT DELIVERY SYSTEMS
Costs and Economics of Construction
Assess Start-up Requirements
Cost Concepts and Design Economics
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
BUSINESS INCOME COVERAGE EXPENSE CHART
CIVL 493 CONSTRUCTION MANAGEMENT
Assess start-up Requirements
4.00 Explain the fundamentals of financing a small business.
Classification of Cost
Estimating – Overhead, Profit, Margins, & Markups workshop
Budget.
© 2004 Ewing Marion Kauffman Foundation
Presentation transcript:

S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE BY Awad S. Hanna Associate Professor Department of Civil and Environmental Engineering The University of Wisconsin - Madison

1. Develop Work Breakdown Structure (WBS) and Cost Code

2. Planning and Quantity Takeoff vProject should be completely “build on paper” vDivide the project into phases vDecide how each phase will be built and the “resources” required vDetermine quantity takeoff vDecide which phase should be sub- contracted

3. Determination of Direct Costs vDirect Materials vDirect labor vSub-Contract Costs vEquipment rentals or owning and operating costs

4. Determination of Job Overhead Costs Job Overhead Costs A. Job Overhead labor Costs (Indirect Labor Costs) B. Job Overhead  Management Costs

A. Job Overhead Labor Costs (Indirect Labor) vSocial Security Tax vState Unemployment Tax vFederal Unemployment Tax vWorkers’ Compensation Tax vBenefit ^Pension Funds ^Apprenticeship Training ^Vacation Fund ^Other benefits

B. Job Overhead Costs vJob site Salaries of Engineers and supervisors vJob Site Salaries for field office personnel vJob site overhead expenses such as light, heat, telephone, fax, office etc. vJob site office equipment, supplies, and furniture

Overhead Cost for a Contractor Doing a Volume of $1.5 M to 2.5 M Manager/Owner$75,000 Estimator 50,000 Receptionist/Bookkeeper 30,000 Office rent and utilities 16,000 Furniture and fixtures 8,000 Auto expenses 12,000 Computer and Software 4,000 Telephone and fax 6,000 Insurance 6,000 Sales promotions 5,000 Legal and accounting 8,000 Educational seminars 1,500 Office supplies 4,800 Postage and courier 7,200 Association dues and misc. 1,500 TOTAL $235,000

5. Determination of Markup vMarkup is an allowance for: a. Home Office overhead b. Contingency c. Profit vMarkup range from 5% to 20% of the total project costs

a. Office Overhead Costs vHome Office rental, maintenance, utilities and expenses. vHome Office equipment, furniture and supplies. vProperty taxes, business licenses and auto insurance. vDues and subscriptions. vPostage and courier, non-job related.

a. Office Overhead Costs (cont.) vAdvertising and telephone vLegal and accounting fees vSales and marketing vPresident salary and benefits vClerical staff salary and benefits vEstimators salary and benefits

b. Contingency vTo cover unexpected risk, error and omission, and contract risk

c. Profit vProfit varies from 1% to 10% or more vFactors affecting profit ^Need for work ^Contract type ^Total bid value ^Risk ^Competition ^Economic Condition

Determination of Contract Bond Cost vThe contract document usually requires as a minimum a “performance bond” and a “payment bond.” vBond cost ranges from 0.5 % to 1% of the total contract price.

Example of Determining Total Contract Price vAssumptions 1. Sales Tax = 6% of Direct Material Costs 2. Job Overhead Labor Costs = 25% of Direct Labor Costs 3. Job Overhead Management Costs = 10% of Direct Labor Costs 4. Markup = 20% of Total Project Costs Office O.H.= 10% Contingency= 2% Profit= 8% 5. Bond = 0.5% of 1% of Total Project Costs

Example of Determining Total Contract Price (cont.) vEstimated Directed Job Costs 1. Direct Labor Costs$25, Direct Material Costs 15, Direct Equipment Costs 13,000 (Owning & Operating Costs) 4. Subcontract Costs 20, DIRECT COST SUBTOTAL$73,670

Example of Determining Total Contract Price (cont.) vJob Overhead Costs 6. Sales Tax [6% of (2)] $ Job O.H. Labor [25% of (1)] $ 6, Job O.H. Management $ 2,567 [10% of (1)] 9. Total Job Overhead Costs $ 9, Total Estimated Job Costs $ 83,555 [(5) + (9)] 11. Total Cost [(10) x 1.2] $ 100, Bond [0.005 x (11)] TOTAL CONTRACT COST $ 100,767 [(11) + (12)]

14. Markup [(11) - (10)]$16,621 Breakdown of Markup 14a. Office O.H. [0.10 x (10)]$8,356 14b. Contingency [0.02 x (10)] 1,671 14c. Profit[0.08 x (10)] 6,684 Example of Determining Total Contract Price (cont.) Bid Factor = DIRECT COST SUBTOTAL TOTAL CONTRACT COST 73, ,767 ==1.368