OWEMES 2009. OWEMES 2009: Brindisi (21 – 23 May, 2009) Structure of the presentation:  Part One: Introduction on TPWind  Part Two:SRA / MDS  Part Three:

Slides:



Advertisements
Similar presentations
Strengthening innovation in chemical clusters
Advertisements

Support for the coordination of activities TECHNOLOGY PLATFORMS Context, Rationale and State of Play Presentation by Julie Sors European Commission Rotterdam,
The EU Adaptation Strategy
New EU Forest Strategy and Update on Forest Information and Monitoring
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Parallel session for topics: EE-05 Deep renovation of buildings EE-06 Demand response in blocks of buildings EE-02 Design of new high performance buildings.
Cyprus Project Management Society
A 2030 framework for climate and energy policies Energy.
Europe 2020: Resource-efficient Europe flagship initiative
Main Developments in EU Environment Policy. 1.The 7 th Environmental Action Plan 2.Waste Electrical and Electronic Equipment Updated Directive 3.Timber.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
The EU Emissions Trading System (ETS) Rationale and Lessons learnt Artur Runge-Metzger Head of International Climate Negotiations, European Commission.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
1 Justin Wilkes Public Affairs Advisor European Wind Energy Association RESTMAC workshop Warsaw 11 October 2007 Achieving the 180 GW of wind power in Europe.
LEADER -The acronym ‘LEADER' derives from the French words "Liaison Entre Actions de Développement de l'Économique Rurale“ which means, ‘Links between.
CAP Second Pillar: From structural policies to rural development Lecture 15. Economics of Food Markets Alan Matthews.
22 Feb 2007EU-Russia Co-operation1 Dr. Stephan Pascall Advisor to the Director Directorate G: Components and Systems DG Information Society and Media European.
Capacity building for public authorities – EE7 Veronika Czako Project Adviser, EASME.
EU Energy Strategy
The European offshore wind industry key trends and statistics 2010 Athanasia Arapogianni Research officer The European Wind Energy Association 16/03/2011.
Energy Tom Howes DG Energy European Commission Europe's renewable energy strategy.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
1 European Investment Bank II. The EIB and Africa.
REGIONAL POLICY EUROPEAN COMMISSION The EU Recovery Plan and the proposal amending the European Regional Development Fund Regulation.
Energy EU future strategies and policies Andreea Strachinescu, European Commission Directorate-General for Energy Head of "New energy technologies, innovaton.
Euei1. 2 Facilitation Workshop and Policy Dialogue Maputo April 2005 Enrico Strampelli European Commission DG Development.
Animal Welfare EU Strategy Introduction Community Action Plan The Commission's commitment to EU citizens, stakeholders, the EP and.
1 1 CURRENT ENERGY POLICY CHALLENGES. THE 2030 ENERGY AND CLIMATE FRAMEWORK DG Energy, European Commission.
A new start for the Lisbon Strategy Executive summary Increase and improve investment in Research and Development Facilitate innovation,
Transport Henrik Drake "Ports and Inland Navigation" European Commission, DG Mobility and Transport (DG MOVE ) Common Issues Meeting on RIS Zagreb, 13.
A new start for the Lisbon Strategy Knowledge and innovation for growth.
European Commission Environmental cooperation in the Mediterranean June 2009.
1 European Union Regional Policy – Employment, Social Affairs and Inclusion The new architecture for cohesion policy post-2013 High-Level Meeting on the.
Green Paper on National Strategic Planning The Presidency November 2009.
Josefina Lindblom European Commission DG Research - Unit T4: SMEs SMEs in the.
Future European issues on off-shore wind power deployment Steffen Nielsen Head of Section Danish Energy Authority Ministry of Transport and Energy European.
Enver AKSOY, MSc Head of Strategy Development Board of MoFAL Policy approaches of Ministry of Food, Agriculture and Livestock to pasture management in.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
1 Regional Innovation Strategies RIS. 2 About Regional Innovation Strategies The RIS projects aimed to support regions to develop regional innovation.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
Chryssa Argyriou Directorate B – Security of supply, Energy markets & Networks Unit B2 Electricity and Gas Sofia, Energy Day, 18 June 2010 Energy Infrastructure.
Commission’s Climate change and energy package: ETUC’s viewpoint S. Dupressoir, Adviser European Trade Union Confederation, Conference What energy policy.
Policy Research and Innovation Research and Innovation Enhancing and focusing EU international cooperation in research and innovation: A strategic approach.
THE EU SUSTAINABLE DEVELOPMENT STRATEGY (SDS) Timo Mäkelä Director of Directorate G Sustainable Development and Integration DG Environment European Commission.
An update on TPWind: past and future. TPWind – The road so far  TPWind is an EU network of approximately 150 wind energy experts created in 2005, officially.
1 Strategy for the sustainable competitiveness of the construction sector Communication COM (2012) 433 final Vicente Leoz Argüelles UNIEP POLICY DAY 12th.
1 Cohesion Policy Brussels, 9 June 2009 “ Cohesion policy: response to the economic crisis” European Commission seminar for managing and certifying.
Mr Martin Crouch, ERGEG Electricity Regulatory Forum 2009 Florence, 5 June 2009 Status Review of Sustainable Development in the Energy Sector.
EuropeAid Implementing Development Aid The Water Supply and Sanitation Sector S. Dalamangas EuropeAid Cooperation Office Athens October 2010.
The added value of the Wind Energy Roadmap Christian Nath – TPWind Executive Committee.
Loretta Dormal Marino Deputy Director General DG for Agriculture and Rural Development, European Commission IFAJ Congress 2010 – Brussels, 22 April 2010.
1 EUROPEAN FUNDS IN HALF-TIME NEW CHALLENGES Jack Engwegen Head of the Czech Unit European Commission, Directorate General for Regional Policy Prague,
Fitness Check of environmental monitoring and reporting MIG-P meeting 4 Dec 2015 Joachim D'Eugenio Steve White DG Environment European Commission.
The EU Water Initiative and the EU ACP Facility New Instruments to promote sustainable development of water resources and affordable access Antonio Garcia-Fragio.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
Summary of the State of the Art of Programme Implementation CENTRAL EUROPE PROGRAMME Project development seminar Prague, 1-2 February 2010 Monika.
EU context (networks & initiatives) and expectations EU context (networks & initiatives) and expectations Michel Viaud and/or Ingrid Weiss EPIA, Brussels,
Energy Meeting with the NGOs Taipei, 25 September 2013 Christian Kirchsteiger European Commission, Directorate-General for Energy (DG ENER) EU Policy Context.
Work Package 2 Targeting innovation chain processes to tackle Societal Challenges Task 2.2 Involvement of society in societal challenges.
1 Strategy for Statistical Cooperation in the ENP-East Region High Level Seminar June 2012, Tbilisi, Georgia Session No. 7 Jolanta Szczerbinska,
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
Overview of working draft v. 29 January 2018
27 November 2014 Mantas Sekmokas
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
Post-2020 discussions 1. State of play of discussions 2. On-going work 3. Questions for debate.
New EU Forest Strategy Tamas Szedlak AGRI H4
EC approach towards financing infrastructure projects Dagmar KALJARIKOVÁ Policy Officer for Turkey, Montenegro, REC CEE and NGOs Unit for Enlargement.
Energy efficiency in buildings
Environment in Cohesion Policy framework for
Presentation transcript:

OWEMES 2009

OWEMES 2009: Brindisi (21 – 23 May, 2009) Structure of the presentation:  Part One: Introduction on TPWind  Part Two:SRA / MDS  Part Three: The offshore strategy of TPWind

PART I: Introduction on TPWind

TPWind - Objectives  Scoping sector innovation and R&D needs  R&D SET- Plan, FP7, other EU and National plans  A single, powerful voice for R&D  EU, Member States, industry, other energy sector, R&D institutions and financiers  Maximal sector sensitivity. Better communication  Within the wind sector & externally (other industry sectors & technology platforms)  “Docking station”  Effective Action Plans, for technology and policy  Strategic Research Agenda (SRA) & Market Development Strategy (MDS) – published in July 2008 Monitor ongoing initiatives (EC / other EU & national) Strengthen the ERAAssess and monitor ongoing and new research projects

TPWind - Structure

TPWind - Working Groups Environment Policy Market Wind Energy MW R&D is not the only issue to be considered in the development of wind energy!

TPWind - Activities September 2006: Publication of vision document March 2007: Launch of Windsec project October 2007: Selection of TPWind Members November 2007: First General Assembly February 2008: Second General Assembly July 2008: Publication of SRA / MDS 2009: Completion of SRA/MDS implementation plan & launch of EWI May 2009: Fourth General Assembly October 2008: Third General Assembly October 2006: Official launch of TPWind March 2010: End of Windsec project : Implementation of SRA/MDS The past: planning The future: implementation

TPWind - Main Deliverables  Vision document on wind energy up to 2030 (published in September 2006)  Strategic Research Agenda (SRA) / Market Development Strategy (MDS), to cover technology issues, policy R&D and market development (published in July 2008)  SRA / MDS implementation plan (to be finalized by the end of 2009)  Action plan outlining the future of the Platform (i.e. after the end of the “Windsec” project). The action plan will be finalized by the end of 2009  Development of the “European Wind Initiative” in cooperation with the European Commission (EWI to be launched before the end of 2009)

PART II: SRA / MDS

SRA/MDS - TPWind 2030 Vision: the starting point 57 GW today 180 GW by 2020 (i.e. 12/14% of EU’s electricity consumption) 300 GW by 2030 (i.e. 25% of EU’s electricity consumption) To achieve the proposed objectives, 10 to 15 GW of additional capacity must be installed every year, i.e. 20 3MW turbines per working day

SRA/MDS – Two documents merged into one  The “Strategic Research Agenda” (SRA) and the “Market Deployment Strategy” (MDS) were originally planned as two different documents;  Because of their multiple interconnection, they were eventually merged into a single paper, published in July 2008;  However, the focuses of these two components remain different:  SRA = R&D priorities;  MDS = Market and Policy issues.

SRA/MDS - Structure of the analysis Thematic Priority 1 Internal 2030 vision 2030 global vision Research topic 1Research topic 2… Research priority 1 Short / Medium / Long term Research priority 2 Short / Medium / Long term Research priority 1 Short / Medium / Long term Research priority 2 Short / Medium / Long term Research action 1 Research action 2 Research action 1 Research action 2 Research action 1 Research action 2 Research action 1… Research action 2… Thematic Priority 2 Internal 2030 vision The result is a research implementation plan at short / medium / long term

SRA/MDS – Overview of R&D Thematic Priorities  The SRA is divided into five thematic priorities, which reflect the vision of the sector for 2030 (as expressed in the vision document published in September 2006) as well as the structure of TPWind:  Wind conditions;  Wind turbine technology;  Wind energy integration;  Offshore deployment and operation;  European research infrastructure (transversal action line).

SRA/MDS – The future  The SRA/MDS has been published in July 2008: TPWind is now working on its implementation  The relevant implementation plan will be finalized by the end of 2009: this document, together with the new “European Wind Initiative” (EWI), will drive wind energy R&D in the next decade  The implementation of the SRA/MDS will contribute in meeting the ambitious 2020 targets recently set by the EU and will play a key role in fighting climate change  TPWind has just entered a new and more challenging phase: implementation!

Part III: The offshore strategy of TPWind

Offshore strategy – Main objectives  Focus on deployment  Offshore wind farms to produce more than 10% of EU electricity by 2030 (i.e. 180 GW, which can be generated by approximately offshore wind turbines)

Offshore strategy - Priorities

Offshore strategy – Identified projects (I) Standardisation and harmonisation across the EU The purpose of the project is to create the conditions for achieving the standardisation and harmonisation of safety policies across the EU. To this aim, the project partnership will list all the rules and regulations currently in force, while the TPWind Mirror Group will push for the adoption of one single European standard on safety. The most important safety concerns appear to be the following:  Safety of operational personnel (working on WTGs)  Safety of marine operations (required to develop and operate offshore wind farms) Identification of training centres The goal of the project is to list all the relevant EU training facilities and identify their specific competencies. At the same time, project partners will also identify the training needs of the wind energy industry in order to create the conditions for the development of new European centres capable of filling the current gaps. It should be noted that to improve the training of operational personnel, WTG manufacturers should provide more information on their machines, which are currently hard to obtain. Make environmental data public The aim of the project is twofold:  To standardise Environmental Impact Assessments (EIA) and environmental data by coming up with a common format  To make environmental data public This will lead to the implementation of the principle of publicly available environmental data (on soils, waves, winds, currents, birds, seals and so on), which will facilitate the development of new wind farms. Geotechnical data The aim of this project is to improve the acquisition and application of geotechnical data. This data can represent a significant cost at the early stage of the project and so the objective of the study will be to develop a process for acquiring the data in stages, allowing the cost to be minimised but ensuring there is sufficient data to allow the project to continue. Re-engineering offshore substructures The goal of the project is to re-engineer current offshore substructures on the basis of the data collected and experiences gained by offshore wind farms so far. This will lead to improved design methods, upgraded standards and enhanced designs (which will be based on data measured on existing WTGs). Ideally, three “Reengineering offshore substructures” projects should be implemented to make sure that all lessons learned by current offshore wind farms will be identified and used to improve the current situation. This project is expected to have a key impact on the current debate on the use of concrete or steel in the installation of offshore WTGs.

Offshore strategy – Identified projects (II) Manufacturing automation The aim of the project is to automate the manufacturing process of substructures. As a result, the whole production process will be optimised and will lead to cheaper manufacturing and improved logistics. Thanks to this project, the industry should be able to deliver enough structures to reach 10,000 units in Improved vessels The purpose of the project is to create the conditions for the development of new vessels capable of meeting the needs of the offshore wind energy sector (i.e. increasing the installation weather window). To this end, a new funding scheme backed by the “European Investment Bank” (EIB) should be launched. This instrument will provide financial support to manufacturers capable of developing a new generation of vessels, and should be structured in cooperation with the TPWind Mirror Group (which is composed of representatives of EU Member States) and Finance Working Group (which deals with R&D financing). In parallel, project partners should also define the design requirements for new vessels and identify deep water ports with the required infrastructures to service offshore projects. New offshore WTGs The goal of the project is to gather data and lessons learned from existing offshore wind farms in order to identify areas for improvement and the ideal characteristics of future offshore WTGs. The project will focus on the following issues:  Redundancy  Reliability of WTGs (which is particularly important in offshore wind farms, where human intervention should be as limited as possible)  Resistance to corrosion  Condition monitoring systems  Risk-based maintenance  Helihoist option in offshore WTG design  Possibility of designing bigger turbines Better access methods The aim of the project is to define access requirements for offshore WTGs in a consistent way, so as to improve access methods for operational personnel and if possible to increase the weather window for O&M (for example through the use of helicopters). To this end, project partners will gather data on different solutions and will then test them on offshore wind farms for at least 1 – 3 months, also in adverse weather conditions.

Offshore strategy – Gantt chart Offshore sub- section Project titleI half 2009 II half 2009 I half 2010 II half 2010 I half 2011 II half 2011 I half 2012 II half 2012 I half 2013 II half 2013 SafetyStandardisation and harmonisation SafetyIdentification of training centres EnvironmentMake environmental data public EnvironmentGeotechnical data SubstructuresReengineering offshore substructures SubstructuresManufacturing automation Assembly, installation, decommission ing Improved vessels TurbinesNew offshore WTGs Operation & Maintenance Better access methods

Offshore strategy – Implementation  Implementing the proposed strategy represents a key priority for the wind energy sector, which needs to fulfil the potential of offshore  The political conditions for doing it appear to be very favourable, since the European Commission is clearly interested in backing the development of offshore wind – see COM(2008) 768 “Offshore Wind Energy”  The resources for implementing all the identified projects will come from the EWI (the FP7 is not expected to play a key role), the EIB and the EBRD (which will manage a considerable budget dedicated to renewables – see COM(2008) 800 “A European Economic Recovery Plan”)  However, public funds will not cover more than 50% of project costs in any case: the rest will have to be covered by the private sector  For this reason, a clear commitment of the industry will also be needed  TPWind is currently working to create the best possible conditions for a smooth launch of the identified projects

Thank you for your attention! Filippo Gagliardi,