Strategies for Public Participation in the Management of Transboundary Waters in Countries in Transition Lake Peipsi/Chudskoe (Estonia/Russia) and Lake.

Slides:



Advertisements
Similar presentations
EURADWASTE 29 March 2004 LOCAL COMMUNITIES IN NUCLEAR WASTE MANAGEMENT THE COWAM EUROPEAN PROJECT EURADWASTE, 29 March 2004.
Advertisements

Promotion of In-country Access Reforms Kiril Ristovski, Center for Environmental Democracy - Florozon.
Stakeholder engagement to deliver river basin plans; just a matter of perceptions? Klaas-jan Douben Regional Water Authority Brabantse Delta Breda, The.
ORGANISED LOCAL GOVERNMENT IN SOUTH AFRICA (SALGA) PRESENTATION TO CNM Scope of the relationships between local governments of IBSA July 2009.
“Building Effective Public Participation in Environmental Impact Assessment in a Transboundary Context” in Bulgaria Institute for Ecological Modernisation.
“Participatory approaches towards water management: transboundary cooperation in the River Lielupe (Latvia/Lithuania) ” 9 June 2005, St. Petersburg,
ACTeon Innovation, policy, environment Madrid – WFD Conference April 2006 How to proceed with the Programme of Measures and the River Basin Management.
Colorado Basin Water Conference Dr. Tim Casey, Professor of Political Science Colorado Mesa University.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Integrated thematic assessments: outlook on water, data and.
Mirna Bojić Ministry of Environmental and Nature Protection, Croatia Budapest, November 2012.
Focus Groups, Citizens’ Juries and Open Space method: Innovative tools of public involvement in water management Kati Kangur Peipsi Center for Transboundary.
Development and Cooperation Financial Instruments supporting civil society cooperation initiatives in the Black Sea region Black Sea NGO Forum, 6th Edition.
Building Capacities for Management of IPRs in Countries in Transition. WIPO Tools. Tbilisi, November 12, 2012 Mr. Michal Svantner, Director, Division for.
Identify the institutions which have a stake in the
Europe & CIS Subregional Workshop: 7-8 March 2007, Istanbul, Turkey Enhancing National GEF Coordination, Communications and Outreach (Session 6): The Bulgarian.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
Implementation of Global Action Plan for Peatlands and Ramsar CC GAP future Wise Use of Peatlands Schiphol February, 2009.
Strategic partnerships Elaine Paterson Fund Development Committee Chair and Monjeya ElGhadamsy Committee Member.
LAKE OHRID MACEDONIA AND ALBANIA Experiences with Nutrient Management and Agricultural Non-point Source Pollution Control.
Government IAM Ministerial Conference Participants Virtual Water Forum Water Voice Sessions interaction Ministerial Declaration Interaction Session Reports,
Contribution of the Territorial Cooperation Programmes to the EU Strategy for the Danube Region Kiril Geratliev, Director General “Territorial Cooperation.
Development of lake Druksiai/Drisviaty Basin Management Program Feasibility study.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes DRAFT CODE OF CONDUCT ECOSYTEMS AND PES FOR WATER MANAGEMENT.
Enhancing Access to Information and Public Participation in Environmental Decision-making UNDP-GEF Danube Regional Project Component 3.4 Magda Toth Nagy,
Project: Participate! Decide! Win! “Improving the Practices of Public Participation: Next Steps in Implementing the Aarhus Convention in Albania, Bosnia.
Espoo Convention on Environmental Impact Assessment in a Transboundary Context Workshop on “Making Aarhus work in international forums” Geneva, 23 February.
ENVIRONMENTAL EDUCATION POLICY Working Group (EEP WG) Environmental Education at the primary schools of Bulgaria - funded by the МАТRА Program c/o The.
Erkki Vedder Cooperation with Russia in the Context of the EU Enlargement.
United Nations Environment Programme Regional Cooperation and Coordination Experiences Marieta Sakalian Programme Management/Liaison Officer Biodiversity.
9 December 2005 Toward Robust European Air Pollution Policies Workshop, Göteborg, October 5-7, 2005.
I m p a c t Euronatur Conference Bonn, Sept 7th, 2005 impact | policy consulting simone lughofer Achieving Sustainable Rural Development through Partnership.
Ministerul Mediului si Gospodaririi Apelor Session 6 - Enhancing National GEF Coordination, Communication and Outreach Developing the National Capacity.
UNDP-GEF Dnipro Basin Environment Programme1. 2 Dnipro basin map.
The ENPI/FLEG Program in Azerbaijan. In line with the Country Working Plan an active implementation of the ENPI/FLEG Program in Azerbaijan has been launched.
Naturvårdsverket | Swedish Environmental Protection Agency Swedish Environmental Protection Agency International Cooperation Marianne Tegman International.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Approach to GEF IW SCS Impact Evaluation Aaron Zazueta Reference Group Meeting Bangkok, Thailand September 27, 2010.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Seminar on the role of ecosystems as water suppliers CONCLUSIONS AND RECOMMENDATIONS.
Addressing Water Eutrophication in the Baltic Sea Basin Through Sustainable Watershed Management and Strengthening Institutions for Cross-border Cooperation.
River Basin Management in Southern Africa Barbara Schreiner.
Protocol on Water and Health: added value and challenges for public participation Tsvietkova Anna MAMA-86’s Water and Sanitation Program Workshop on Water.
Kiev + 1 Conference 22 October Tbilisi, Georgia RECs Partnership Regional Environmental Centres: Central Asian REC REC Caucasus REC for Central.
1 The Protocol on Water and Health TASK FORCE ON PUBLIC PARTICIPATION IN DECISION-MAKING October 2010, Geneva, Switzerland Tomasz Juszczak, UNECE.
Global public policy network on water management Water and Climate Change Adaptation – Key Messages for COP-15 gppn.
DEVELOPING THE WORK PLAN
Experience from Russian-Estonian cooperation in Lake Peipsi basin Kristjan Piirimäe Status assessment of lakes ecosystems in the Central and Eastern Europe.
 Learn how to identify and categorise stakeholders.  Consider different stakeholder structures and responsibilities in groundwater management.  Get.
TISZA RIVER BASIN SUSTAINABLE DEVELOPMENT PROGRAM (TRB-SDP) Challenge for Transboundary Cooperation Kálmán MORVAY & Péter VARGA PhD Tisza-Szamos Public.
Workshop and Steering Committee Meeting Globally-important Ingenious Agricultural Heritage Systems (GIAHS) Project Rome, 7-9 June 2004 Components and Processes.
Synergy and Consistency Between Activities of the UNFCCC and Other Relevant Organizations in Supporting Enabling Environments for Technology Transfer.
Ecologic.de Public Participation- Key element of EU Water Policy Nicole Kranz Ecologic - Institute for International and European Environmental Policy.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
1 Legal Frameworks for Public and Stakeholder Engagement by Carl Bruch Asia Regional Workshop on Stakeholder Engagement in International Waters Management.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project and Public Participation in the Transboundary River Basin Management.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Upcoming Work on the Enabling Environment for Civic Engagement Initiative Jeff Thindwa Participation and Civic Engagement Group Social Development Department,
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
MIT University Skopje Ass. Prof. Oliver Andonov, PhD
INTRODUCING INTEGRATED WATER RESOURCE MANAGEMENT IN THE ANDEAN STATES
Participation as a Pivotal Element R. Andreas Kraemer & Nicole Kranz
Ohrid region experiences and lessons learned
Addressing Water Eutrophication in the Baltic Sea Basin Through Sustainable Watershed Management and Strengthening Institutions for Cross-border Cooperation.
The Water Framework Directive: Challenges, Threats and Opportunities
Presentation transcript:

Strategies for Public Participation in the Management of Transboundary Waters in Countries in Transition Lake Peipsi/Chudskoe (Estonia/Russia) and Lake Ohrid (Macedonia/Albania) Project report

The report was prepared within a project implemented by two regional international NGOs – Peipsi Center for Transboundary Cooperation (Estonia/Russia) and Alliance for Lake Cooperation in Ohrid and Prespa (Macedonia/Albania) with the support of the WWF International. The report is available at

Public participation has gained wide recognition as a key principle for water management, but its implementation is problematic. Potential benefits of public participation include better informed and more creative decision-making, more public acceptance, less litigation, fewer delays, and more effective implementation of water policies; public participation can promote social learning, a more open and integrated government, and democracy; and sustainable water management (Mostert, 2002).

EFFECTIVE APPLICATION OF PUBLIC PARTICIPATION REQUIRES PRACTICAL GUIDANCE!

Available methods of PP 1. INFORMATION – public gets information through mass media, information centers, cultural events, leaflets and brochures; 2. CONSULTATION – public is asked for opinion: interviews, comments in writing, opinion polls, public hearings, internet discussions; 3. DISCUSSION – Real interaction takes place between the public and government: workshops; 4. CO-DESIGNING – public takes an active part in developing policy or designing projects; 5. CO-DECIDING – Negotiations, resulting in a “Volunteer agreement”; 6. DECIDING – Public performs public tasks independently: water users’ associations Available methods of PP 1. INFORMATION – public gets information through mass media, information centers, cultural events, leaflets and brochures; 2. CONSULTATION – public is asked for opinion: interviews, comments in writing, opinion polls, public hearings, internet discussions; 3. DISCUSSION – Real interaction takes place between the public and government: workshops; 4. CO-DESIGNING – public takes an active part in developing policy or designing projects; 5. CO-DECIDING – Negotiations, resulting in a “Volunteer agreement”; 6. DECIDING – Public performs public tasks independently: water users’ associations

Need to develop strategies and specific methods to stakeholder participation within existing LEGAL FRAMEWORK FOR PP - UN ECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes - UN ECE Aarhus Convention - EU Water Framework Directive ON DIFFERENT GEOGRAPHICAL SCALES - International river basin - National level - Local level

Lake Peipsi/ Chudskoe Basin Surface Area 3,558 km 2 Basin Area 44,240 km 2 Shared by Russia (56%) and Estonia (44%) Average Depth 7.1 m Maximum 15.3 m Population about 1,000,000

Lake Ohrid Basin Surface Area km 2 Basin Area 1,129 km 2 Basin is shared by Macedonia (70%) and Albania (30%) Average Depth 163 m Maximum Depth 289 m Population about 150,000.

Stakeholder participation on national level Specific features: public participation on the international river basin level has to be integrated into the existing processes on national level where the widest range of stakeholders is involved in decision- and policy making. Stakeholder groups: businesses, farmer associations, local authorities and NGOs, a wider public. Associations of citizens’ play a crucial role. Role: participate in preparation of new legislative acts; promote effective implementation of the national legislation.

Examples of stakeholder involvement on national level: Estonian Water Clubs under the Global Water Partnership

International basin level Specific feature: involvement of the wider public remains limited to a few large NGOs and well-organized interest groups. Public participation at the basin level can be a valuable supplement to participation at the national level, but it can never replace it. Stakeholder groups involved: major businesses, agricultural associations, other larger interest groups such as fishermen and regional NGOs. Role: promoting trust building between the riparian states on the initial stages of cooperation, enhancing information exchange and communication, promoting effective implementation of international committments.

Peipsi CTC is actively participating in the Commission’s working group

In 2001 Peipsi CTC initiated an list on Peipsi issues for all the interested parties in the region

Local level Stakeholders: local community including youth and women groups, schoolchildren, small businesses Role: addressing local problems - water pollution are to be managed locally; Specific features: diverse ways depending on local specific cultural and economic background. One of the most important stakeholder groups at local level is local government that has a role of a mediator between the decision-makers and interested stakeholders.

Tartu Volunteer Center, which organizes voluntary actions, e.g. lakeside cleanings

Recommendations - There is a very large range of stakeholders with a large spectrum of interests differing from each other ready to participate in the water management issues; - Each of those stakeholder groups at every water management level needs a special approach to reach their needs and interests - different channels and tools of communication, different information packages, different timing; different level of detailed description; but all of them need clarity and transparency in the information;

Recommendations - One of the most important pre-condition for stakeholder involvement is to formulate very clearly the problems and questions in which stakeholders can contribute the most. - The package of programs and activities to enhance public participation should be as diverse as possible and reach the audience wherever possible; - Special attention is needed to the local level: at local municipality and stakeholders’ level often insufficient planning and implementation capacity of local governments takes place due to inadequate resources and limited information and awareness.

Final comments No cookbooks available for PP – for every water basin, a stakeholder analysis (who are the stakeholders and what are their inherent interests) has to be conducted and a stakeholder involvement plan should be developed;No cookbooks available for PP – for every water basin, a stakeholder analysis (who are the stakeholders and what are their inherent interests) has to be conducted and a stakeholder involvement plan should be developed; The stakeholder involvement plan has to be tailor made applying most suitable available methods of PP for EACH level of governance and EACH STEP of preparation and implementation of a basin management plan.The stakeholder involvement plan has to be tailor made applying most suitable available methods of PP for EACH level of governance and EACH STEP of preparation and implementation of a basin management plan.

Final questions How to create awareness among water managers of the importance of working with stakeholders?How to create awareness among water managers of the importance of working with stakeholders? Where to start with developing capacity and adequate competency of river basin authorities for developing and implementing stakeholder involvement plans?Where to start with developing capacity and adequate competency of river basin authorities for developing and implementing stakeholder involvement plans?

PUBLIC PARTICIPATION PRACTICES IN TRANSBUNDARY LAKE OHRID WATERSHED Albania, Greece and Macedonia

LAKE OHRID WATERSHED

OVERVIEW OF THE PRESENTATION  What are the current participation structures and methodologies in Lake Ohrid Watershed?  How do we actually define the Lake Ohrid Watershed?  Why do we need a (new) strategy?

WHY NEW STRATEGY  State- and locally-driven (competing) agendas at the same time  International actors play an important role, but their agendas may differ …in order to promote further and enhance the public participation, the joint bodies in Lake Ohrid watershed would need new (appropriate) strategies  Polycentric watershed management

ONGOING ACTIVITIES  Lake Ohrid Conservation Project: ALB-MKD (NOT GR!); GEF founded SEVERAL PARALEL PROCESSES:  Transboundary Prespa Park: ALB-MKD-GR; GTZ supported  Local Environmental Action Plans : ALB-MKD; financed & coordinated by ISC, US

LOCALY- OR STATE-DRIVEN? The Lake Ohrid Conservation Project is predominantly locally driven; the public in the watershed is intensively involved in the project implementation at national level. At international level, the Lake Ohrid Management Board provides for involvement of the local officials, scientists and NGOs. The role of the local actors in shaping the policy agenda of the Board fluctuated over the last four years. In the case of the Transboundary Prespa Park, the policy agenda is strongly state-driven, influenced by the highest state officials including the prime ministers of Albania, Greece and Macedonia. There are no institutional arrangements that would provide for wide involvement of the stakeholders. The preparation of the Local Environmental Action Plans is entirely locally driven. There is no or there is very weak connection to watershed scale planning. Participatory structures and methodologies

REPRESENTATIVE OR DIRECT PARTICIPATION? The participation methodologies may substantially differ. The Lake Ohrid Conservation Project “ pushes ” towards a more inclusive (direct) participation. The approach of the Coordination Committee of the Transboundary Prespa Park is typical of “ elite participation ”

Do we change the institutions? or… we change the strategy… INSTEAD OF CONCLUSIONS The issue of defining the system boundaries becomes central. It is related to the identification of the stakeholders and ultimately to the question of what type of participation organizations/institutions we need and what participation methodologies should be applied…

Or, put in other words… Participatory structures and methodologies Is polycentric watershed management really bad “thing”…? What are the “system boundaries”

Thank you for your attention