INDEPENDENT WATER SCHEMES IN SAMOA

Slides:



Advertisements
Similar presentations
Caribbean Conference on Comprehensive Disaster ManagementCDM: Strengthening Partnerships for Resilience Montego Bay, St. James, Jamaica December 6 10,
Advertisements

KENYA HEALTH SECTOR PARTNERSHIP Third IHP+ Country Health Sector Teams Meeting Brussels, December 2010.
1 Regional Review and Appraisal of the Madrid International Plan of Action on Ageing (MIPAA) Ms. Noeleen Heyzer Under Secretary-General and Executive Secretary.
EuropeAid INTRODUCING STANDARD INDICATORS IN EUROPEAN COMMISSION FUNDED PROJECTS FOR THE AGGREGATION OF AID EFFECTS Guy Doucet Operations Quality Support,
Child Protection Units
ClimDev-Africa Program & African Climate Policy Center (ACPC)
1 MDG Needs Assessment Process in Tajikistan Temur Basilia MDG Team Leader UNDP Tajikistan July 2005.
KYRGYZ REPUBLIC Programmatic Public Expenditure Review Monitoring and Evaluation The MOF/Donor Workshop on PPER Bishkek, September 26, 2005.
Annual Growth Survey What is the AGS? A communication, which sets out the economic and social priorities for the EU in 2013 Launches the next European.
Operational Programme I – Cohesion Policy Event part-financed by the European Union European Regional Development Fund Evaluation Plan for Maltas.
EUROPEAN COMMISSION Community health programmes: first results and future challenges for the EU regions Donata Meroni European Commission - DG Health and.
Options appraisal, the business case & procurement
Water Integrity Forum, Delft June 5th 2013 Community Managed Project (CMP) approach: an opportunity to foster integrity in rural WaSH Experience from Ethiopia.
Unit 1. Introduction TB Infection Control Training for Managers at the National and Subnational Levels.
New Technologies for Tuberculosis Control: Programme Perspective Draft Definitions Retooling Task Force Meeting Geneva, Switzerland January 2008.
Salford Carers Strategy Glyn Meacher – Integrated Commissioning Manager PRESENTATION TO CLUSTER 2 SCRUTINY SELECT COMMITTEE.
COMMUNITY HEALTH FUND AS A COMPLEMENTARY FINANCING OPTION IN TANZANIA Presented at CHF Best Practice Workshop: 31 st Jan – 2 nd Feb Golden Tulip.
How to deploy sustainable telecentres in Rwanda? Rwanda Telecentre Network August 2010 Paul BARERA Juriaan Deumer.
Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
FLEGT VPA Independent Market Monitoring (IMM). IMM Background IMM is a condition of some FLEGT VPAs (e.g. Indonesia) Builds on IMM proposal by EFECA in.
Based on a criteria method. The FWUC capacity to undertake their main tasks:  Operation  Maintenance  Communication and relationship with farmers and.
The Background to Free Health Care Sierra Leone is evolving from the status of one of the least developed countries with the worst set of health indicators,
Build and maintain democratic and decentralized local government institutions that are capable to participate in the development of social and economic.
COMMUNITY SYSTEMS STRENGTHENING Keynote address by PROF MIRIAM K. WERE ON THE OCCASION OF THE AMREF HEALTH AFRICA INTERNATIONAL CONFERENCE, 2014 NAIROBI,
DEMAND MANAGEMENT Customer Metering – the Samoa Experience Apia Urban Supply 1995 – 2002.
“WATER COMMON GOOD FOR ALL” 15th – 16th NOVEMBER 2011, Ouagadougou – Burkina Faso Presented by Eng. Deus Mchele District water Engineer Bahi District Council.
Lessons learned from implementing drinking water safety plans in the Pacific Water Safety Conference (2-4 Nov 2010) Kuching, Malaysia Managing Drinking.
Institutional Arrangements and Planning Approaches for Efficient and Effective Water Management Michael Rouse Past President International Water Association.
Community Participation in Rural Water Supply and Sanitation Project in Kyrgyzstan.
GENDER PROJECT Eliminating Violence – 28 August 2014.
Water Services Trust Fund Social Animators & Field Monitors Training Workshop The Water Services Trust Fund: Functions, Mandate, Urban Window, WSTF Support,
BRIEFING ON NATIONAL SCHOOL NUTRITION PROGRAMME PORTFOLIO COMMITTEE ON EDUCATION 15 MAY 2007.
Developing a Sector Wide Approach in Samoa : A Before and After Snapshot 1.
STANDING COMMITTEE ON APPROPRIATIONS Presentation by Zandile Mathe Deputy Director General: NWRI 11 February Briefing by Department of Water Affairs.
Presentation Somathilaka Kindelpitiya Community Development Specialist 21 st July, 2012.
Wales and Third Sector EU Funding. Government of Wales Act 1998 sets out the National Assembly’s legal obligations to the sector and how it proposes,
Micro Finance Team “Savings and Credit System” Managed and Owned by the Community for Sustainable Development Lao-German Cooperation (Technical Cooperation)
Upscaling Basic Sanitation for the Urban Poor Involvement of Stakeholders in the UBSUP Programme and its SafiSan Projects By the UBSUP Team 26 th - 27.
Innovative funding for infrastructure services: the use of Output Based Aid in the Honduras water sector Cledan Mandri-Perrott Infrastructure, Economics.
Harnessing a multi-stakeholder platform for improved land governance in Malawi Ivy Luhanga – Principal Secretary, Paul Jere – Land Governance Consultant,
Briefing on Progress made with regard to Prevention and Management of Child Abuse and Neglect Especially Child Sexual Abuse Presentation at the Portfolio.
1. 2 Size: 33,700 sq. km Population: 4.7 mln, 54% rural GNP per capita: US$ 410, the poorest country in Europe 55% of population poor.
CARPE Inception Workshop, Yaounde, February 07-09, 2007 The CARPE Small Grants Program: a way to strengthen Civil Society for Biodiversity Conservation.
LELEA’S NEW WATER UPGRADE AND NEW WATER MANAGEMENT.
(FODESA) 1999 – 2009 SAHELIAN AREAS DEVELOPMENT FUND.
HFA Review Sri Lanka. Consultations 42 members of National Platform were consulted. Five groups appointed by members to evaluate the progress.
Changing the way the New Zealand Aid Programme monitors and evaluates its Aid Ingrid van Aalst Principal Evaluation Manager Development Strategy & Effectiveness.
Multi-stakeholder Dialogue on Benchmarking Water Quality and Services Brussels - 9 September 2014 The ECI 'right2water' Commission response.
NATIONAL SOCIETY DEVELOPMENT
1 Overview The Expanded Public Works Programme (EPWP) 17 Aug 2010 EPWP incentive update for Select Committee on Public Services.
ORGANIZATION CAPACITY ASSESSMENT (2013) Produced in April 2013.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
Data, Surveys and Performance Monitoring by Mr Ben Freyer Deputy Director, Regional Support Services, DWSSC 22 November 2012 Ministry of Agriculture, Water.
BIMILACI 2007 THE CHALLENGE OF CAPACITY DEVELOPMENT Washington, May 11, 2007 Bayo Adeola FIDIC Executive Committee.
CHILDREN OF PRISONERS PARTNERSHIP What is the Children of Prisoners (CP) Partnership? The CP Partnership is a funding project between PFI and selected.
1 Swedish Committee for Afghanistan Livelihood Project (Female Economic Empowerment Project) Presenter: Fawad Sultani.
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
Belize Association of Refrigeration and Air Conditioning Technicians (ARACT) Refrigeration and Air Conditioning Servicing Sector Expo Frio Calor, Santiago.
SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING AND RESULTS SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING.
Presentation to the Portfolio Committee on Energy
Sustainable Water Management for Lelea’s Independent Water Scheme
Delivering Water to the People of Tonga
Progressing a Single Water Utility Approach
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
Danube Water Conference, Vienna, May 2017
12. Role of national and international technical and funding partners in the implementation of aDSM Multi-partner training package on active TB drug safety.
Brief background about DAC
Resource Mobilisation Strategy for Slum Upgrading
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Translating ideas into proposals for action programmes
Presentation transcript:

INDEPENDENT WATER SCHEMES IN SAMOA IWSA, SAMOA

Background IWSA was formed in 2007 to represent the interests and support the development of 24 independent water schemes Non-Government Organisation Supported under the EU – financed Water Sector Support Programme (WaSSP) Full-time Programme Officer hired in 2008 & technical officer hired in Feb 2010 Office space provided by the Ministry of Women and Community Development

Who are we? Represent and support 31 independent water schemes covering 53 villages IWS provide water to 32,000 people in Samoa (approx 17% of total population) Water schemes vary in size from between 15 to 400 household connections Self-managed by local personnel selected by their communities

Why did we form an Association? To fight for formal recognition of the role of IWS To work together to solve problems & learn from each other To access support from Government and donors

Constitution of IWSA? Executive Committee has 11 member: President, Vice-President, Secretary, Treasurer and 7 other members. IWSA has 31 paid members and 4 others who would like to join.

IWS Intakes

IWS Present Conditions

What have we achieved? Training Worked with Government and SUNGO to design and deliver a one week training programme to each member IWS Covering committee organisation, planning, communication, fee collection, book keeping, maintenance, water shed management and water safety issues.

2. Data collection on IWS Information collected from a baseline survey and update during training and follow-up visits Information on committee structure, fee collection, number of households, source of water, water quality, problems, etc Set up simple database to monitor progress and facilitated decision-making

3. Water quality monitoring Worked with MoH to introduce regular programme of water quality monitoring for IWS Introduction of H2S testing by MOH to train villagers so they can test their own water Increased awareness of the health risks of poor quality water

4. Recognition of role of IWS Recognition in Government’s draft Water Services Policy of the role of IWS in water service delivery Proposal for future Government funding to support the role of IWSA and to invest in rehabilitation of independent water schemes.

5. Technical design support and funding for rehabilitation Funding from EU/WaSSP for technical review and design of priorities for rehabilitation/ improved water quality of IWS Schemes must demonstrate improved management with set criteria to access support: fee collection, regular meetings, female participation on Water Committee, etc. IWS contribute 10% of cost and unskilled labour + plumbers to work with contractor

Work in Progress

Work in Progress

Current Programme Tender launched for 1st intervention support for 5 IWS. Works undertaken to be completed by June 2010 Signed MoUs with each participating IWS

Future Challenges Production of manual for IWS with all the lessons learnt from the training programme Training for IWS plumbers on maintenance Continue to reinforce training on financial management Strengthening dialogue and developing constructive relationship with SWA Ensuring sustainability of independent IWSA

Future Challenges (cont’d) Development of contract with Government (MWCSD) for funding Providing appropriate technical support for well-managed schemes (design and supervision) Introducing water safety planning Finalise and implement Water Services Policy – MOU with SWA and drafting community water services bill.

Future Challenges (cont’d) CHANGING ATTITUDES - Water is not free!

Comments: Water is free but not from the pipes What is the budget for subsidy from the government? Community contribution is 10%, government (through SBS) 90%. Many schemes are very old, run by the villages themselves Is the budget for rehabilitation or O&M? Only for rehabilitation, O&M costs unknown – budgeting for O&M is something new for the communities, in the past maintenance was done by the villages themselves. The chiefs and oratators encourage contributions for major repairs e.g. after cyclone damage. Now government is stepping in and undertaking more extensive upgrading. 10 T/m/ year/ family is tariff because the costs are kept low but it is still not enough. What is important is that there is a system for regular payment of fees and a governance structure Does the tariff recover enough to run SWA? From 1994 revenue of 100,000 per year; now more than 1 million per year

Comments Sometimes there is higher charge for more taps. (2 tala per tap per family per month) – it depends on the situation The regular tariff is supplemented by periodic fund raising SWA would have made a profit without depreciation last year. Cost recovery by tariffs alone in rural areas in atolls