GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

Installation and evaluation of the Globus toolkit WP 1 INFN-GRID Workload management WP 1 DATAGRID WP 2.1 INFN-GRID Massimo Sgaravatto INFN Padova.
INFN & Globus activities Massimo Sgaravatto INFN Padova.
WP 1 (Globus) Status Report Massimo Sgaravatto INFN Padova for the INFN Globus group
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Work Package 1 Installation and Evaluation of the Globus Toolkit Massimo Sgaravatto INFN Padova.
Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.
4/2/2002HEP Globus Testing Request - Jae Yu x Participating in Globus Test-bed Activity for DØGrid UTA HEP group is playing a leading role in establishing.
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
INFN Grid Information Services G. Lo Biondo INFN Milano (presented by F. Prelz)
Red Hat Linux Network. Red Hat Network Red Hat Network is the environment for system- level support and management of Red Hat Linux networks. Red Hat.
GRID workload management system and CMS fall production Massimo Sgaravatto INFN Padova.
Status of Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
LNL M.Biasotto, Bologna, 20 novembre Providing the Grid Information Service with information of local farms Massimo Biasotto – INFN LNL Massimo.
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID Workload Management System Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management Massimo Sgaravatto INFN Padova.
First steps implementing a High Throughput workload management system Massimo Sgaravatto INFN Padova
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN experience with Globus GIS A. Cavalli - F. Semeria INFN Grid Information Services workshop CERN, March 2001.
Evaluation of the Globus GRAM Service Massimo Sgaravatto INFN Padova.
Wireless Grid Computing A Prototype Wireless Grid Grant Gifford Mark Hempstead April 30, 2003.
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
INFN-GRID Globus evaluation (WP 1) Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
DATAGRID ConferenceTestbed0 - resources in Italy Luciano Gaido 1 DATAGRID WP6 Testbed0 resources in Italy Amsterdam March,
Grids and Portals for VLAB Marlon Pierce Community Grids Lab Indiana University.
A. Cavalli - F. Semeria INFN Experience With Globus GIS 1 A. Cavalli - F. Semeria INFN First INFN Grid Workshop Catania, 9-11 April 2001 INFN Experience.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
Nov 1, 2000Site report DESY1 DESY Site Report Wolfgang Friebel DESY Nov 1, 2000 HEPiX Fall
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
Grid Workload Management Massimo Sgaravatto INFN Padova.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
PROOF Cluster Management in ALICE Jan Fiete Grosse-Oetringhaus, CERN PH/ALICE CAF / PROOF Workshop,
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,
Report from USA Massimo Sgaravatto INFN Padova. Introduction Workload management system for productions Monte Carlo productions, data reconstructions.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
Globus Toolkit Massimo Sgaravatto INFN Padova. Massimo Sgaravatto Introduction Grid Services: LHC regional centres need distributed computing Analyze.
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
Proposal for a IS schema Massimo Sgaravatto INFN Padova.
Enabling Grids for E-sciencE Software installation and setup Viet Tran Institute of Informatics Slovakia.
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
GIIS Implementation and Requirements F. Semeria INFN European Datagrid Conference Amsterdam, 7 March 2001.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
INFN “Grid Information Service” evaluation Giuseppe Lo Biondo - INFN Sez. Di Milano Giulietta Vita Finzi - INFN CNAF Padova June
Feedback from CMS Andrew Lahiff STFC Rutherford Appleton Laboratory Contributions from Christoph Wissing, Bockjoo Kim, Alessandro Degano CernVM Users Workshop.
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
First evaluation of the Globus GRAM service Massimo Sgaravatto INFN Padova.
INFSO-RI Enabling Grids for E-sciencE Padova site report Massimo Sgaravatto On behalf of the JRA1 IT-CZ Padova group.
Workload Management Workpackage
Installation toolkit and deployment of Globus in Pisa
LCG experience in Integrating Grid Toolkits
GRID Workload Management System for CMS fall production
Presentation transcript:

GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN Padova)

GRID The intent … Tools to enable local administrators to deploy the GRID software (now Globus and related packages: OpenLDAP, …) + GSIWUFTPD Reduce complexity and manpower necessary for installation Decrease errors during installations Collect bug fixes Include INFN customizations

GRID INFN customizations Certificates (for hosts and users) signed by INFN CA … but user certificates signed by Globus CA are accepted as well Preliminary architecture for GIS (Grid Information Service) Tests on performance and scalability needed to define the GIS architecture

Dc=bo, Dc=infn, dc=it,o=grid Bologna GIIS INFN ATLAS GIIS GIIS Dc=mi,Dc=infn, dc=it,o=grid Exp=atlas, o=grid Top Level INFN GIIS Dc=infn,dc=it, o=grid Milano GIS Architecture (test phase) GRIS Implemented Implemented using INFNGRID distribution To be implemented

GRID First step (July 2000) Software distribution available on AFS Fixes for bugs found during first Globus evaluations included INFNGRID installation guide Instructions for INFN customizations included Scripts to make certain steps (i.e. post- install operations) automatic

GRID Second step (now) Pre-compiled distribution (available now for Linux Red Hat 6.1): INFNGRID 1.1 /afs/infn.it/project/infngrid/1.1 Script for installation and deployment: infngrid-install Users decide to use INFN customizations or “standard” setup Would you like the INFN setup (Y/N) ? (1) Copy INFNGRID tar files from /afs/infn.it/project/infngrid/1.1/Linux to download dir (2) Decompress and untar INFNGRID distribution files in install dir (3) Configure INFNGRID software (4) Globus Setup (5) Configure GRAM services (6) Globus local deploy (7) GIIS Configuration ==================================================== Condor and LSF

GRID Second step Script for post install operations: globus-root-setup Installation instructions for special environments (configuration of client machines, shared install-directory) included List of included bug fixes Status Tests performed in different environments (INFN, CERN, FNAL) “Officially” released Available to DATAGRID partners (1)Modify system files and reactive the inetd daemon (2)Change owner to root of certain files for tighter security (3) Modify system wide login files Support for HEPIX included (4)Start/restart Globus now (5)Configure gsi-wuftpd and restart the inetd daemon

GRID Next steps Configuration of PBS as local resource management systems: 1.2 Support for Solaris 2.6: 1.2 We don’t plan (at least now) to support other platforms Improvement of current no-precompiled distribution Eventual use of infngrid-istall script for both pre-compiled and non pre-compiled distribution “Unattended” installation Management of updates Inclusion of GDMP: 1.2 Inclusion of other GRID software packages ?? Other works will be “triggered” by local administrators and users Some items missing ???

GRID Conclusions The distribution of the GRID software (now Globus) is available We are trying to keep it general (not only for INFN) Useful “tool” to make installation automatic and simple Difficult to integrate with ASIS/SUE Modification of Globus packaging is necessary first