NMA/MSHA Approval Workshop Electrical Safety Division Approvals May 21 and May 22, 2008.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Supplier’s Declaration of Conformity (SDoC)
Tips to a Successful Monitoring Visit
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
TRAINING FOR THE WEIGHTS AND MEASURES OFFICIAL COURSE CURRICULUM MODULE 1Introduction MODULE 2Laws & Regulations MODULE 3Enforcement Procedures MODULE.
Independent Laboratory Testing PART 6 Regulations Wayne Colley Electrical Safety Division Electrical Engineer.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
September 9, Electrical Safety Division Testing and Evaluation of Electrical Equipment Independent Laboratory Part 6 Workshop.
QUALITY ASSURANCE & MATERIALS TESTING DIVISION (QA&MTD)
MSHA APPROVAL PROCESS Steven Luzik Chief, Approval and Certification Center Chief, Approval and Certification Center.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Intrinsic Safety Testing by Gail Nicola, Electrical Engineering Technician Ed Vensko, Electrical Engineering Technician.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
[Federal Register: June 17, 2003 (Volume 68, Number 116)] [Rules and Regulations] [Page ]
Crane Operations Objective
Security Controls – What Works
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Quality Assurance/Quality Control Policy
Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer.
MSHA COMMUNICATIONS AND TRACKING GUIDANCE PPL Stakeholders Meeting.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Auditing Standards IFTA\IRP Audit Guidance Government Auditing Standards (GAO) Generally Accepted Auditing Standards (GAAS) International Standards on.
GLOBAL REGULATORY STRATEGY CONSIDERATIONS SCIENTIFIC SARAH POWELL EXECUTIVE DIRECTOR, REGULATORY STRATEGIES SEPTEMBER 14-17, 2008 BOSTON, MA.
Low Voltage Directive New Approach. Directive Overview Guidelines on application and Recommendations Safety objectives Documentation LVD standardisation.
UN ECE Sectoral Initiative on Equipment for Explosive Atmospheres 7 September 2011 United States Department of Labor Mine Safety and Health Administration.
Welcome Elizabeth Schanbacher Assistant Superintendent of Educational Technology.
Bud Page Electrical Engineer Electrical Safety Division.
Process Safety Management
Communications and Tracking Approvals Past – Present - Future MSHA Communications and Tracking Workshop March 17, 2010.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
NMA/MSHA Approval Workshop MSHA Approvals Approval and Certification Center May 21 and 22, 2008.
Company duties under the ISM Code
From Research Prototype to Production
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
The EU Training Programme for Turkish Chamber Executives Electrical equipment Eurochambres Chamber House 19 A/D Avenue des Arts B-1000 Brussels Belgium.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Prime Responsibility for Radiation Safety
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
What Documentation Needs to be Submitted With an Approval Application?
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA HACCP Principle.
Electronic Drafting DFT 58A&B Cliff Monroe - Instructor.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
FINAL RULE 30 CFR PART 46 Training and Retraining of Miners Engaged in Shell Dredging or Employed at Sand, Gravel, Surface Stone, Surface Clay, Colloidal.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
CM&C Inspections The Pre-Approval Inspection (PAI) in the US 27 May 2010.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Standards Certification Education & Training Publishing Conferences & Exhibits ISA SP12 Standards Related to Equipment in Hazardous Locations.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Common Problems with Performance/Testing of Batteries
Steve Griffith February 28th, 2017
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Inspector's Role and Responsibilities
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Inspector's Role and Responsibilities
Instrument Maintenance
Clinical Engineering Lecture (3).
Inspector's Role and Responsibilities
International Organization
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Presentation transcript:

NMA/MSHA Approval Workshop Electrical Safety Division Approvals May 21 and May 22, 2008

Electrical Safety Division (ESD) Staff of 24 Including Chief, Team Leader and OAA 21 Investigators 14 Engineers, 7 Technicians Product Approval PAR Duties Additional assignments include: Technical Assistance, Accident Investigations, Training, Litigation and Regulatory Support Explosion Gallery and Intrinsic Safety Laboratory

Electrical Safety Division Approval Programs Part 7: Motors and Battery Assemblies Testing by Applicant or Third Party Part 18: Machine/System Approvals Part 18: Explosion-Proof Enclosures Part 18: Intrinsic Safety Instruments & Circuits (I.S.)

Electrical Safety Division Approval Programs Part 19: Cap Lamps Part 20: Electric Mine Lamps other than Standard Cap Lamps Flashlights Part 22: Portable Methane Detectors

Electrical Safety Division Approval Programs Part 23: Telephones and Signaling Devices (Communications and Tracking Devices and Systems) Part 27: Machine Mounted Methane Monitors Part 28: D.C. Fuses Other Programs

Part 7 Motors and Battery Boxes Testing by Applicant or Third Party Applicants Submits Certified Statements Compliance with Design Specifications Compliance with Test Requirements Quality Assurance Third party laboratory evaluations Test Observations MSHA observes first test and any additional testing deemed necessary

Machine/System Approvals Continuous mining machines, shuttle cars, scoops, high voltage longwalls, etc. Machines are evaluated for compliance with 30 CFR Part 18 Typically consists of X/P enclosures and I.S. Circuits Factory/field inspection is required after completion of the drawing evaluation High voltage longwall regulations §18.53 Compliance guide on

Explosion-Proof (X/P) Enclosures Designs are evaluated for compliance, certified to Part 18 Enclosures are inspected and explosion tested unless similar to a previously tested enclosure Simplified drawings are acceptable in lieu of production drawings Certification does not authorize applicant to advertise product as MSHA approved MSHA can accept test results for IEC (flameproof enclosures) provided additional requirements are met

Part 18 Intrinsic Safety Approvals and Evaluations Products are evaluated to 30 CFR and ACRI2001, “Criteria for Acceptance of Intrinsically Safe Apparatus and Associated Apparatus” The Electrical Safety Division’s most complex approval program, which routinely requires in- depth evaluation and multiple tests Evaluation requires thorough documentation of components and circuitry Intrinsic Safety FAQ document on website

Cap Lamps Cap Lamps are approved to 30 CFR Part 19 Evaluation includes drop and impact testing, and performance tests such as light output and battery life tests Recently added ACRI2001 to approval requirements Recent cap lamp designs incorporate new battery and light technologies Recent designs incorporate communication and tracking components – given “23-ISA” evaluation number

Portable Methane Detectors Approved to 30 CFR Part 22 Requirements include ACRI2001 and methane accuracy testing; must remain accurate after being subjected to drop test Must include calibration requirements Approved detectors are used for 30 CFR Part 75 compliance Multi-gas instruments: measure 0 2 deficiency Miner Act: sampling behind seals

Communications and Tracking Approved to 30 CFR Part 23, “Telephones and Signaling Devices” Currently the heaviest volume of applications within ESD Communication and Tracking applications are currently given priority MINER Act has ushered in new generation of technology Requires new acceptance considerations: Power supplies Battery capacity Larger batteries – off gassing concerns Lithium batteries – high density batteries RFI/Blasting Circuits

Communications and Tracking Recently issued PPL No. P08-V-02 Addressed provisions of the MINER Act Provided guidelines for processing: Any component or system used to provide voice, text, or signaling data that is intended to remain operational in the event of emergency will be evaluated under Part 23 Line powered devices must be provided with backup standby power (24 hrs recommended)

Communications and Tracking All components operating under standby power must be I.S. or housed within X/P enclosures, including cables I.S. batteries of portable assemblies will be drop tested; if >5kg, subjected to Part 7 battery requirements Standby power sources which include rechargeable batteries must address battery off-gassing Standby power source must have back-feed protection

Communications and Tracking Potential for RFI (radio frequency interference) with blasting circuits must be addressed Tracking tags drop tested or impact tested Cap lamps powering Part 23 components must address performance requirements of §19.9(a); recommend providing sufficient operation capability of hours Approval documentation must include lightning arrestors where necessary per §§ and ; evaluated to ensure that it does not invalidate the Part 23 approval

Machine Mounted Methane Monitors Certified to 30 CFR Part 27 Must provide audible or visual warning between 1.0% - 1.5% CH 4 Must provide machine/system shutdown at 2.0% CH 4 Performance testing (500 cycle test) Resistance to vibration, dust, and moisture System and components designed to be X/P and/or I.S.

Other ESD Programs Field Modifications per §18.81 Experimental Permits per §18.82 Ground Wire Monitor Program ST&E (Statement of Test and Evaluation) Diesel Electrics (§36.32) New Procedure ASAP2031 Modifications to approved or accepted equipment (RAMP applications)

Part 6 Independent Laboratory Testing Recognized by a laboratory accrediting organization Free from commercial, financial, and other pressures that may influence the testing and evaluation process Evaluation of third party product safety standards (e.g., IEC) Single source page available on MSHA.gov:

Recent MSHA Part 6 Activities Completed evaluation of IEC and -1 and determined modification (deviation) is required to ensure equivalent protection to MSHA approval requirements Evaluation of IEC and -11 is on-going Participation on IEC TC31 main committee and subcommittees MSHA has approved several products based on independent laboratory test reports

In general, some helpful hints… Ensure all required documentation is included with original application Use the checklist provided in the applicable application procedure (MSHA investigators do!) Bottom line: the more complete and accurate the documentation for the application, the more timely the application can be evaluated

Adequately Documented Applications Consultation meetings prior to submittal Accurate and substantive drawing lists Timely and complete responses to discrepancy letters; communication with investigator Addressing discrepancies in timely manner may reduce the time the investigator spends to re- familiarize with complex applications/systems

Drawing Recommendations If the application includes changes to drawings previously filed with MSHA, it will simplify the review process if all changes to the revised drawings are clearly identified Duplicate drawings with explanatory notations may be submitted in addition to a "clean" copy to be placed on file

Complete Intrinsic Safety Applications Should Include… Technical description of operation of electrical circuit(s). Identify features critical to safety of the product. Adequate use and maintenance instructions If applying under Part 6: Test Reports UL1642 report (with test records) for any lithium battery Drawing List Factory Inspection Form (or Certified Statement) for Part 18 applications

Necessary Drawings for Complete I.S. Application Overall system / assembly drawing Block diagram (if required) Subassembly drawings Internal wiring diagrams (if required) Schematics Layout Printed circuit board artwork Electrical parts list / Bill of material

Recommendations to I.S. Application Submissions Identify components that have no affect on intrinsic safety or required performance by a generic description rather than the specific manufacturer and manufacturer's part number Submit schematics without component values accompanied by a parts list specifying the ranges of values for each non-critical component

Assistance for Applications Involving Intrinsic Safety cation/application.htm cation/application.htm Previous Intrinsic Safety Workshop Intrinsic Safety FAQ and Guide Drawing requirements Technical design issues I.S. design tips and problem solutions

Digitized Ignition Curves Hard copies in ACRI2001 still the official version Digitized versions promote consistency and expedience; may aid in preventing errors Includes resistive, capacitive and inductive curves application.htm application.htm

Contact Information Rob Holubeck

Questions?