1 09/2002 ISO 9001 certified JOANNEUM RESEARCH Applied Geophysics Institute of Applied Geophysics – new Dam Project 2nd IMPACT Project Workshop Mo-i-Rana,

Slides:



Advertisements
Similar presentations
JOANNEUM RESEARCH Forschungsgesellschaft mbH, Steyrergasse 17, A-8010 Graz, Austria, web: ISO 9001 zert.
Advertisements

Best Available Techniques (BAT)
Evaluating administrative and institutional capacity building
IMPACT 6-7th November 20033rd IMPACT Project Workshop Louvain-la-Neuve 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation.
Clinical trials in Europe Emma Greenwood, Policy Manager Thursday 23 rd February.
End of Waste – Experiences from the UK Roger Hoare, Environment Agency 3rd October 2013 Malta 2013 IMPEL Conference on Implementation and Enforcement of.
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013 WG10 Infrastructure for Georesources.
Industrial and Innovation Policy in Austria By Daniel Föger Hong Hai Luong.
Austrian Exchange Service Agency for International Cooperation in Education and Research Presentation ÖAD1 Austrian Exchange Service Largest non profit.
1 Overview of LESSLOSS – Training / Dissemination Activities Lessloss Topic Workshops TWS3-1 and TWS5-1 SP7 and SP10 Local Organisers: LNEC and IST Lisbon,
SUPER-SME PROJECT Pilot Action Plan FUNDITEC. Executive summary Main objectiveTransfer technology unit Main activies- follow-up of the technological novelties.
ISO 9001:2015 Revision overview - General users
European Railway Energy Settlement System (ERESS) - ”Building common European solutions” UIC Energy Efficiency Conference 2009.
Risk Management for Work Stress at EDUCACONSULT M&J Consulting Pardubice, Czech Republic
Overview of Activities of Twining Partnership VIETNAM - KOREA N.M. HANG, Office 33.
Invention for Innovation (i4i) Bev Luchmun Industry Lead NISCHR
UK based successful independent geological and geophysical consultancy for the international petroleum industry.
Excellence in Vocational Teaching Symposium 23 & 24 September 2013 Qingdao, P.R. China.
Toolbox CRC programme managers – Dag Kavlie, RCN Analysis of indicators used for CRC Monitoring and Evaluation Ljubljana, 15 September 2009.
Space Technology for Emergency Response and Risk Reduction European Conference - GEO Welcomes FP7 Constanta, Romania 15 September 2006 United Nations platform.
Embedding Work-With-IT to enhance flexibility: outcomes from a partnership project. Peter Hartley, University of Bradford Jo Smedley, University of Wales,
Workshop BeWag UIP Implementation of certification of entities in charge of maintenance Jean-Marie DECHAMPS-SAFETY Unit Brussels 28/04/
Ensuring Food Safety in Europe through Scientific Cooperation and Networking The Role of EFSA Carola Sondermann EFSA Polish Focal Point – Annual Experts.
Human Factors (HF) - Assessment Method Agenda What is Human Factors? Why do we need HF-Assessment Method ? What is the HF-Assessment Method ? Why.
Building Science Capacity using Seismology Michelle Grobbelaar.
UL UK – European Affiliates Briefing – 6 July July 2004  The High Performance Organisation Group Ltd Online Auditing European Affiliates Briefing.
ACE Opening Session 2002 News from the Recognition Field Lesley Wilson Secretary General European University Association (EUA)
1 JOANNEUM RESEARCH Quality and Excellence Reinhold Hofer EARTO Workshop „Quality and Excellence in RTO Management“ Brussels
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
Slide 1 A Carillion plc company. 30 th September 2008 SAFESPUR and Brownfield Risk Management Forum Radioactive vs Non-radioactive Contamination – Tools.
Reducing the Risk of Embankment Failure Under Extreme Conditions Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 17 May 2002.
Personnel Week 9 Seminar.
Course AE2104 Environmental Measuring and Monitoring.
IMPACT-ADD proposal 1 st IMPACT Workshop HR Wallingford, UK th May 2002 Investigation of Extreme Flood Processes and Uncertainty - Additional Partners.
IAEA International Atomic Energy Agency Advanced Workshop School for Drafting Regulations on Radiation Safety RER/9/096.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Cooperation project on strengthening EU's Nordic USAR modules Acronym: EU-NU Grant Agreement n:o ECHO/SUB/2014/
Partnership project between the Association of German Chamber of Industry and Commerce (DIHK) and the Association of Balkan Chambers (ABC) –
How can remote operations become more resilient? Siri Andersen - DNV Energy Stig Ole Johnsen - SINTEF.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Nuclear Research and consultancy Group European Radiation Survey Site Execution Manual Leo van Velzen ENVIRONET Kick-off meeting Vienna 23 – 26 November.
Jean Monnet Activities in Erasmus+ Programme - Information on Jean Monnet Activities - Next Call for proposals Selection results Call 2015 (EAC/A04/2014)
CLUSTERING PROJECT Oto Hudec Faculty of Economics Technical University of Košice.
General Project Information I n S e r v N e t In terregional Innovative Serv ice Sector Net work of Excellence.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Advisory Forum, July 2005 Outcome of the first retreat of ECDC Management Team (EXC) 4-5 July 2005 Krägga Herrgård Zsuzsanna Jakab Director ECDC.
IMPACT 13 May Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme Flood Processes and Uncertainty.
June 25, 2007 Moravia-Silesia: Investors Friendly Region.
The BMBF Foresight Process Kerstin Cuhls, Walter Ganz, Philine Warnke Fraunhofer ISI and Fraunhofer IAO Third International Seville Conference on Future-Oriented.
Summary of the Submission of the United States On the development of a five-year programme of work on the scientific, technical and socio-economic aspects.
National PE Cycle of Analysis. Fitness Assessment + Gathering Data Why do we need to asses our fitness levels?? * Strengths + Weeknesses -> Develop Performance.
Capacity Building for the implementation of the Cartagena Protocol on Biosafety by the German Development Co-operation: German Federal Ministry for Economic.
Government - University – Industry A Triumvirate for Innovation & Growth.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
Royal Scientific Society Eng. Nael Almulki. Royal Scientific Society FunctionsAbout RSS RSS was established in 1970 as an independent, not-for- profit.
1 Dam Geophysics- An Indispensable Tool for Dam Health Check & Dam Monitoring Presented by: Dr. Sanjay Rana, Director, PARSAN.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
University of Macedonia © University of Macedonia Co-financed by the European Regional Development Fund (ERDF) (75%) and the Greek National Funds (25%)
"Follow the money" and supply chain integrity
EU Reference Centres for Animal Welfare
Regions for Economic Change: Networking for Results Migrants and the City: Towards Successful Integration Anna Ludwinek European Foundation 05/12/2018.
Projects under DTP Thematic Pole 2 TP2 (Framework Support for RDI)
PROCSEE as a vehicle for PHE Policy in CSEE
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
IMPACT BREACH FORMATION (Location).
Finalisation of study report
Finalisation of study report
Presentation transcript:

1 09/2002 ISO 9001 certified JOANNEUM RESEARCH Applied Geophysics Institute of Applied Geophysics – new Dam Project 2nd IMPACT Project Workshop Mo-i-Rana, Norway 12-13th September 2002 presented by: Rainer Morawetz INSTITUTE of

2 09/2002 ISO 9001 certified Overview  Introduction to JOANNEUM RESEARCH and its Institute of Applied Geophysics  New Key-Project – „Dam Investigation Methods and Geotechnical Applications“  Project Description  Geophysical Methods  Goals  Further Work

3 09/2002 ISO 9001 certified Location of Joanneum Research Vienna Budapest Ljubljana Zagreb 300 km 140 km 200 km Styria Area:16,388 km 2 Inhabitants:1,204,244 Graz Trento 480 km

4 09/2002 ISO 9001 certified Background - Company  JOANNEUM RESEARCH is Austria’s largest research organisation owned by a provincial government  Bridge between Research and Application  Applied R&D  Technology transfer  Promotion of future experts and executives

5 09/2002 ISO 9001 certified Institute of Applied Geophysics Background – Institute of Applied Geophysics  Founded 1981 in co-operation with Montan University  Located in Leoben  Highly competent centre for development and application of geophysical methods  Institute offers full spectrum of geophysical methods  Staff:  Scientific staff: 11  Technical and administrative staff: 4  Students:

6 09/2002 ISO 9001 certified Institute of Applied Geophysics Main Research Fields 1.Seismic reflection for rock structure studies and reservoir characterisation 2.Borehole geophysics and petrophysics for complex rock characterisation 3.Geophysical methods for use in geotechnics, risk assessment and archaeology

7 09/2002 ISO 9001 certified Institute of Applied Geophysics Main Research Field 3 – Key Project:  „Development of Dam Investigation Methods and Geotechnical Applications“ Extend the use of geophysical methods in geotechnical fields Focus on development of a method for non-destructive, fast and effective investigation of dams and embankments  Milestones: Literature Review Test Measurements Systematic Analysis of Methods

8 09/2002 ISO 9001 certified Institute of Applied Geophysics Geophysical Methods  Non-destructive  Repeatable  Ground characterisation using physical values

9 09/2002 ISO 9001 certified Institute of Applied Geophysics Geophysical Methods - Dams In general, better results gained by using a combination of methods

10 09/2002 ISO 9001 certified Institute of Applied Geophysics Goals  Identification and relevant geotechnical assessment of inhomogeneities using non- destructive techniques  Method for the economic investigation of long lengths of dam (eg. flood defence embankment)  Development of techniques for long-term monitoring

11 09/2002 ISO 9001 certified Institute of Applied Geophysics Further Work  Implementation, trial, and refinement within scope of EU project and with industrial partners (particularly of mobile but economic investigation techniques suitable for long lengths of dam)  Development of techniques to derive absolute geotechnical values (eg. degree of saturation, shear strength…)

12 09/2002 ISO 9001 certified JOANNEUM RESEARCH INSTITUTE of Applied Geophysics Please talk to me in the breaks! your opinion? which geotechnical parameters are particularly relevant to dams? have you any data/ideas which may help us?