Interfaces Between CCS trackside and other subsystems Joint sector research and validation for the specification of the electromagnetic compatibility.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Why does ERA Need to Flourish
IRSC October Denver, USA 1 Europe: an open space for rolling stock?
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
Erasmus Mundus Information Day 20 January Erasmus Mundus Information Day 20 January ERASMUS MUNDUS PREPARING YOUR APPLICATION.
13 September 2012 SDMX Technical Working Group1 Report of the SDMX Technical Standards Working Group SDMX Expert Group Meeting, Paris, September 2012.
NANC Report Numbering Oversight Working Group (NOWG) October 22, 2010 Tri-Chairs: Laura Dalton, Verizon Communications Natalie McNamer, T-Mobile USA Karen.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
Cross-Acceptance: UNIFE expectations Alice Polo Safety and Certification Manager.
The Implementation Structure DG AGRI, October 2005
Transport RAIL Isabelle Vandoorne Brussels, 29 November 2012 TEN-T 2012 calls info day.
TEN-T Innovation & New Technologies Annual & Multi-annual calls Nov’2012 TEN-T Calls Info Day November 2012 Helmut Morsi, Deputy Head of Unit.
16/04/20101 EPEC Private Sector Forum EPECs activities in 2010 Nicholas Jennett Head of EPEC Private Sector Forum 2 June 2010.
IMPLEMENTATION OF THE STANDARD GAUGE IN THE MEDITERRANEAN CORRIDOR. Cartagena- French border.
SC9XA WGA November 2010 M Petkova.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
1 Workshop on noise differentiated track access charges Brussels – April 27 th, 2010 Denis BIASIN – Rolling-stock TSI Sector – Interoperability Unit Composite.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Vision for the internal electricity market
Wrap-up session : Global and Local Stakeholder Consultation Process 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn.
ISO/IEC Toolbox for Conformity Assessment
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Access to research data: action is needed but what action.
Managing the Statutory Requirements for Assessment April 2011.
Presentation of the proposed Annex 19 – Safety Management
NETLIPSE Infrastructure Project Assessment Tool Stuart Baker, Deputy Director of National Rail Projects Department for Transport, UK Zagreb, November 10,
Standards for Connection of Electric Vehicles David DOSSETT, CENELEC President BEAMA Low Carbon Living Conference 15 March 2011.
Curriculum for Excellence Parent Council Representatives Arbroath High School 26 May 2011 Education Service.
1 Department of State Program Evaluation Policy Overview Spring 2013.
OTM TASK FORCE EFRTC General Meeting Sofia, Markus Hofmann, EFRTC OTM Task Force Chairman Franz Messerli, UNIFE OTM Task Force Vice-Chairman.
European Rail Agency Workshop 29 th September 2011 (Lille) Dr Björn Paulsson (UIC) Dr Stephen Ingleton (Newcastle University) REDUCING THE OCCURRENCES.
European Roadmaps for Research Infrastructures presentation by Hans Chang (chair ESFRI) (1st meeting ESFRI Steering Groups, autumn 2005)
RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger
Proactively Preventing Freight Wagon Derailment Innotrans | Berlin| 18 th September Dr Björn Paulsson (UIC) Grigory Kozyr(UIC) Gordana Vasic (NewRail.
REF2014 HODOMS Birmingham 8 th April Ann Dowling: Chairman of REF Main Panel B John Toland: Chairman of REF Sub-Panel B10: Mathematical Sciences.
Modular Urban Transport Safety and Security Analysis 1 SiT - Safety in Transportation 2012.
Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST.
ERTMS and related research projects European Technology Research & Innovation Dennis Schut UIC Peter Gurnik UNIFE.
The European Railway Agency in development
REMOVING BURDENS – a European rail system fit for the future Thierry Breyne – European Rail Agency - Head of the Safety Unit International Railway Safety.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
#UIC ERTMS World Conference 1. – 3. April 2014, Istanbul UIC Rail System Department UIC ERTMS World Conference Dirk Schattschneider UIC Frequency Manager.
1 Prague, March 12 th 2009 Jean Charles PICHANT – Head of Interoperability Unit The State of processing and approving TSIs.
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
TSI WAGONS (321/2013) modifications BEWAG 27/04/2015.
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
Transport Rail Safety & the Railway Safety Directive Frank Jost Single European Rail Area EU Commission 1.
General Meeting Florence Secretary General report on Items 5 of the agenda Imrich KORPANEC.
Vehicle-Wayside Intercommunications: future EN Standard Marcos Albuquerque January 2002.
109 July 2009CER The Voice of European Railways Cross Acceptance CER Expectations ERA Seminar, Lille, Libor Lochman.
SIAFI APRIL Affiliate Active Associate UIC in 2006.
Eurostat Sharing data validation services Item 5.1 of the agenda.
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
HIGH SPEED RAIL ASSESSMENT NORGE
European Women Interactive Learning GRUNDTVIG Learning Partnership PROJECT ACTIVITIES REVISION With the support of the Lifelong Learning Programme of the.
UIC ERTMS CONFERENCE 2006 – BUDAPEST 5 th April 2006 Operational Interoperability through ERTMS.
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
European Rail Infrastructure Managers
Current status of Shift2Rail
Session II: System authority for ERTMS 4RP Trackside approval
PROPOSALS ON ETCS COMPATIBILITY TESTING & RE-AUTHORIZATION
Interfaces Between CCS trackside and other subsystems Joint sector research and validation for the specification of the electromagnetic compatibility.
Pavel Kodym Interoperability expert
Considerations on the NRMM Technical Review
Fourth Railway Package Technical Pillar Hearing at the European Parliament, Brussels 7 May 2013 José GORTAZAR Chief Technical Officer, CAF.
Integration of 1520/1524 requirements. Progress report.
Presentation transcript:

Interfaces Between CCS trackside and other subsystems Joint sector research and validation for the specification of the electromagnetic compatibility

Sector involvement Cross acceptance Working party Collection and classification of national rules CCS TSI editing including update of the “Interfaces Between CCS trackside and other subsystems” Specification of target system EMC Working Party Contributing to the EMC target specification Projects aiming in closing the EMC open points 14/12/2010

Motivation of the sector involvement Requirements for the compatibility between vehicles and axle counters + track circuits for the authorisation of vehicles are currently an open point in the TSI CCS. As a consequence national rules have to be followed today, in some cases national rules do not exist The joint sector projects aim to a reach broad European acceptance of the new limits test specifications provide the scientific input for the closure of open points related to the vehicle/train detection interface 14/12/2010

Overview of EMC Project planning 2010: partial validation of TS 50238-2 (vehicles and track circuits in the 15kV network) 2011-?: validation of TS 50238-3 (vehicles and axle counters) 2012-2014: closure of TSI CCS open points in FP7 4th call project proposal EUREMCO 2013-2015: closure of TSI CCS open point “eddy current brake” – CTG project idea for FP7 5th call 14/12/2010

EMC phase 1 TS 50238-2 establishes new vehicles emission limits and vehicle test methods for the compatibility with track circuits funding provided by CER/EIM/UIC for the partial validation in the 15kV network Tests have been carried out by DB, SBB and ÖBB with the support of Siemens Test report expected by end of December 2010 To be included in the CCS TSI at the next revision 14/12/2010

EMC phase 2 TS 50238-3 establishes new vehicles emission limits and vehicle test methods for the compatibility with axle counters UIC applied for TEN-T co-funding for a joint validation campaign of 8 CER/EIM (UIC) members in all networks in 2011 Expected outcome: Validated list of practically relevant parameters Susceptibility limits for axle counters missing so far Validation of vehicle emission limits and vehicle test method of TS 50238-3 and proposal for improvements Proposal for the quantification of other relevant parameters Funding rejected – further strategy to be developed !!! 14/12/2010

EMC phase 3 - EUREMCO If positively approved, EUREMCO will finalise the validation of the TS 50238-2 (track circuits) for DC 1,5kV, 3kV and AC 15kV/16,7Hz, 25kV/50Hz Expected outcomes: Set of test signals to test track circuits again transients Clear definitions and specifications for the assessment of transients Limits for the characteristic parameters of transients for both vehicles and power supply (sources) and track circuits (destination) Clear understanding of the influence of the infrastructure on the conducted emissions of vehicles Transfer function from test results within the same power supply system (for track circuits). Requirements that rolling stocks will not disrupt track circuits on non-electrified lines 14/12/2010

EUREMCO: EUropean Rail ElectroMagnetic COmpatibility UNIFE applied jointly with 10 UNIFE/CER/EIM/UIC members for FP7 4th call co-funding for a project in 2012-14 Funding: €2,1m, Budget: €3,6m 14/12/2010

Remaining open point: Eddy current brake A CTG project idea which has been picked up by ERRAC in the « sector wishlist » for the FP7 5th for a joint project of UNIFE/CER/EIM/UIC members in 2013-15 Funding: open Expected outcome: Improve understanding of the interaction of the eddy current brake with the track and trackside signalling equipment Identify critical thermal, mechanic and electromagnetic parameters and its related vehicle and trackside compatibility limits Develop design, engineering and operational guidelines for new eddy current brakes and new trackside signalling equipment 14/12/2010

Conclusion Sector target – simplified vehicle autorisation through: Harmonised EMC limits, both for signalling susceptibility as well as for vehicle emissions Harmonised test method proving the vehicle conformity with the specified limits Final goal – one assessement applicable for all networks compliant with the INTERFACE document Precondition: Strong cooperation of all stakeholders: railway undertakings, infrastructure managers as well as manufacturers (both of vehicles as well as of signalling) 14/12/2010