How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.

Slides:



Advertisements
Similar presentations
1 of 20 Evaluating an Information Project From Questions to Results © FAO 2005 IMARK Investing in Information for Development Evaluating an Information.
Advertisements

Services Reform Strategies for Developing Countries Christopher Findlay March
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Den Hague 10/10/11 Yves Langer Capacity pricing workshop.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Vision for the internal electricity market
2 nd Workshop MFG, , Bucharest The current status on the Market Design of the SEE REM and the way forward.
0 - 0.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
Addition Facts
1 Drafting a Standard n Establish the requirements n Agree the process n Draft the Standard n Test the Standard n Implement the Standard.
INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Intermediate Microeconomics
Two-Market Inter-domain Bandwidth Contracting
Government Abstraction Reform and Water ‘Rights’
SWE IG Meeting Paris, CRE XBID Overview Supported by.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Vienna, 8 April th IG Meeting Meeting Guide.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Jan Müller Bundesnetzagentur ERI Central.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Addition 1’s to 20.
Section 2.1 The Marketing Concept
Test B, 100 Subtraction Facts
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Week 1.
Relevant Costs for Decision Making
1 Unit 1 Kinematics Chapter 1 Day
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Towards Regional Independent Operators – a main driver for successful market integration.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Novel market designs & KPIs I NSTITUTO DE I NVESTIGACIÓN T ECNOLÓGICA Stakeholder Kick-off Workshop, IEE-Market4RES Brussels, Luis Olmos, Pablo.
1 page 1 Discussion on Intraday Capacity Pricing NWE ID project
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
European Commission views on intra-day and balancing markets
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Draft for factual comments, suggestions on overlaps welcome.
NWE Cross Border Intraday
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Presentation transcript:

How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the discussions from birds eyes view down to practical details) Draft for factual comments, suggestions on overlaps welcome. 1

Contents Objectives Complications Implications 2

Objectives (1) 1.One European Integrated Market; 2.Efficient allocation of capacity, leading to consumer welfare; 3.More competition; 4.Capacity is a means to cross borders: not about the theory, but actual market outcomes.; 5.Target model should include capacity pricing mechanism that reflects congestion. Focus on if and how capacity should be priced, for now not system constraints or requirements. NB: The above items concern design of intraday capacity pricing in continuous trade environment. 3

Objectives (2) 6.Topic of welfare: dont underestimate the difficulty of a comparison between day-ahead and intraday (see point 13 under complications). 7.Find a capacity pricing scheme: a rule must exist (having for free is a possibility). And the well functioning in a continuous market. 8.Coherent design between day-ahead, intraday and balancing market: that would lead to a more efficient arbitrage. 9.Practical implementation of capacity pricing - How? 10.Provide the right incentives in terms of generation, consumption and capacity building. 11.Not only willingness to pay for the capacity, but also an investment signal. 12.Parameters for capacity pricing need to be coherent with objectives of the allocation mechanism. NB: The above items concern design of intraday capacity pricing in continuous trade environment. 4

Complications (1) 1.Capacity pricing designing a system of continuous trading is challenging. They are not a priori easily compatible (but doable, as it seems based on discussion). 2.Is capacity pricing and the extraction of congestion rents necessary for efficient allocation? – Certain form of ranking is necessary for efficient allocation. 3.Timing of decision making? Should that be shifted to real time? 4.Will capacity pricing lead to more efficient allocation; evaluate efficiency of allocation now vs. efficiency with capacity pricing. Coherent design between markets. 5.Risk: maximising congestion revenues? – Design should be transparent so there is no perception that TSOs act in gaming behaviour. 6.How big are the problems of congestion currently? And how big will the problem of scarce capacity be in the future? Or the problem of efficient allocation in the future? NB: The above items concern design of intraday capacity pricing in continuous trade environment. 5

Complications (2) 7.There is no time in intraday to compute linear prices the same way as is done in day-ahead. – What about suspending the intraday markets for 10 minutes? Is this a possibility? But what do you gain? A better representation of value? But what are the gains and impacts when compared to market efficiency? 8.How to set the price of the capacity remains central question, in whatever allocation system. Regulatory decisions are needed about parameters and criteria. 9.How to address a question TSOs should be paid for capacity just once? 7.Congestion, no congestion: it is not black and white. Workshop showed difficulty to exhaustively define all situations of congestion (so far). Common terminology needs to be used. "Cross-spread" and "bottleneck income" mean eg same. 8.Keep the projection of physical reality in line with the constructed reality in the market, ie provide for design which fits the actual market operations. 9.What is congestion in terms of market design? Criteria are important when discussing pricing of capacity. NB: The above items concern design of intraday capacity pricing in continuous trade environment. 6

Complications (3) 13.Social welfare criteria (from day ahead) is hard to use as benchmark in continuous market: social welfare is hidden. 14.With (future introduction of) flow-based: welfare impacts increases may not be zero! – Different opinions on impact of flow-based on intraday markets capacity congestion… 15.Objective function for capacity pricing mechanism? 16.How to define and measure capacity allocation efficiency? 17.What are the expected amounts of intraday congestion cases? How much (new) capacity will TSOs (be able) to offer in intraday? 18.How to build cost/benefit analysis for intraday capacity pricing? – Currently intraday is a very small (1%) market. Bu this is potentially to change due to inter alia renewables drive. 19.How to involve market participants in the evaluation of impact of the mechanism? NB: The above items concern design of intraday capacity pricing in continuous trade environment. 7

Implications which were named regarding ongoing 2012 implementation 1.For efficiency: un-segment block and hourly orders (which means pull-together) 2.A more sophisticated algorithm (to deal with capacity pricing issues) is necessary. 3.Explicit access transition: right now no implications… 4.Implications for pricing algorithm to be worked out, based on discussions? NB: The above items concern design of intraday capacity pricing in continuous trade environment. 8