March, 2007 Slide no. 1 HVDC Link Romania – Turkey Short presentation George VISAN Director, Investment Projects Management Direction.

Slides:



Advertisements
Similar presentations
The Agency for Cooperation of Energy Regulators (ACER) – UK Government views Sue Harrison Head of European Energy Markets 13 February 2008 EPP-ED Public.
Advertisements

- GDP 2011 versus 2010 – increase by 5.5%
Evaluation Plan in Hungary Dr. Tamás Tétényi Head of Department for Strategy and Evaluation National Development Agency.
Regional Transmission Network Development:
Black Sea Energy Conference Bucharest April 3-5 Bo Normark
Roadmap for Sourcing Decision Review Board (DRB)
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
Developing Infrastructure Projects. Contents InfraCo Infrastructure Project Development InfraCo’s Role How InfraCo Operates InfraCo in Indonesia.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
ADMISSION OF TCN RESEACHERS IN THE EU Philippe DE BRUYCKER, ULB / Odysseus.
1 Project implementation : December 1999/ November 2002 (3years) Consultancy Services for SME Project Implementation Unit (PIU) For Bosnia and Herzegovina.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Sources of Natural Gas Supply - European Union
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
EBRD and the GEF Combining Capacity Building and Investment.
The New EMC Directive 2004/108/EC and the DTI transposition Brian Jones and Peter Howick.
Trapec S.A. 1 Bucharest Multi Sector – Public Private Partnership Municipality of Bucharest – February 2006 PPP Recommendation Report – Bucharest District.
March 2012 © European Bank for Reconstruction and Development 2010 | Financing and investment in Russian power industry European Bank for.
Public Procurement Exchange Platform Efficient implementation of Procurement - Centralized Purchasing Mr. Safet Hoxha, President of PPRC Mr. Ilaz Duli,
Technical Due Diligence Renewable Energy We build with Passion!
European Economic and Social Committee EUROPEAN INDUSTRY AND MONETARY POLICY The role of the European Investment Bank MAIN PROVISIONAL CONCLUSIONS (To.
 Utilization of a timeline  Defining influence  Establishing members  Meet and network  ORGANIZATION!
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Draft Law on Industrial Parks. Definition of Industrial Park Territory on which economic activity, including industrial production, services provision,
OPERATIONAL PROGRAMME “DEVELOPMENT OF THE COMPETITIVENESS OF THE BULGARIAN ECONOMY” Republic of Bulgaria Ministry of Economy and Energy April 2006.
Strategic Alliances How to Structure, Negotiate, and Implement Successful Alliances February 11, 2003 Debra J. Dorfman Copyright © 2003 by Hale and Dorr.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
Energy Agency of the Republic of Serbia
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
Chapter 21 Internal, Operational, and Compliance Auditing McGraw-Hill/IrwinCopyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.
The nature and importance of economic feasibility studies for investment projects 1.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
Undertakings for collective investment in transferable securities (UCITS) Worldbank Global Development Learning Network The Advanced Program in Accounting.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
NATIONAL LOAN GUARANTEE FUND FOR SMEs GUARANTEES OF NLGFSME – A WAY FOR FACILITATING THE ACCESS OF SMEs TO FINANCING International Forum for Investments.
Who we are and purpose Agoria – Renewable Energy Club Brussels, 18 January 2011 Ana Aguado – CEO, Friends of the Supergrid.
Cameroon Business Forum (CBF) April 14, The Cameroon Business Forum (CBF) is a platform for public private dialogue to enhance business environment.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
Prokurimi Publik në Kosovë Public Procurement System in Kosovo Public Procurement activities for 2011 Mr. Safet Hoxha, President of PPRC Mr. Ilaz Duli,
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
Office of Major Project Development (OMPD) Overview November 2015.
State backed Seed Capital, Pre-Seed pilots and Seal of Excellence Norwegian implementation.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Damitha Kumarasinghe Director General
The 3rd package for the internal energy market
EU law and the legislative procedure of European Union
What Does it Mean for UN/CEFACT ?
Gas Regional Initiative
Enterprise Content Management Owners Representative Contract Approval
- GDP 2011 versus 2010 – increase by 5.5%
Preparations for post-2020 Impact Assessment European Commission Directorate General for Regional and Urban Policy Unit DGA Policy.
CARDS TWINNING IN CROATIA
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
Relationship between World Bank and Romanian EA requirements
European Economic and Social Committee
European energy policy
Investment, Trade & Transport Facilitation
Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO
Presentation transcript:

March, 2007 Slide no. 1 HVDC Link Romania – Turkey Short presentation George VISAN Director, Investment Projects Management Direction

March, 2007 Slide no. 2 Pasakoy A major and complex project to be considered and developed

March, 2007 Slide no. 3 Where we are now ? Scope of MOU -1 between Transelectrica and TEIAS for the elaboration of the system study is achieved; System study was analysed and finished by signing the Joint Position Paper of 26 december 2006 ; What to do next ?

March, 2007 Slide no. 4 Opportunity ( system ) study Preliminary Joint Position Paper Project Implementation Feasibility StudyBusiness Study Final Joint Position paper ( corporate level ) Project Approvals Project International Agreement between Romania and Turkey MOU -2 Political Joint Statement MOU - 1 Simplified Roadmap

March, 2007 Slide no. 5 Roadmap – major phases and milestones Phase 1 – elaboration of the system study ( opportunity study ) –Corporate Level : Transelectrica and TEIAS –Cooperation instrument : MOU 1 –Delivrable : Opportunity study – April 2006 –Validation : Preliminary Joint Position Paper ( P-JPP ) to be included in MOU 2 Phase 2 – elaboration of the feasibility study and business study –Corporate Level : Transelectrica and TEIAS –Cooperation instrument : MOU 2 –Delivrables : Feasibility study Business study –Validation : Final Joint Position Paper ( F-JPP ) Corporate approval of the business study and the feasibility study

March, 2007 Slide no. 6 Phase 3 – Preparing implementation –Project organization ( project company ) –Financing structure –Project implementation plan Phase 4 – Project Approvals –Approval of the feasibility study in Romania (by Governmental Decision) –Approval of the feasibility study in Turkey –International agreement between Romania and Turkey Phase 5 – Implementation –Transelectrica –TEIAS binding agreement to jointly build the HVDC link Phase 6 – Preparing technical and comercial operation of the HVDC link Roadmap – major phases and milestones

March, 2007 Slide no. 7 Preparing Phase 2 Transelectrica’s proposal : –To meet in May TEIAS for negotiating MOU -2 for the Feasibility study and the Business study; –Preliminary JPP to be included in MOU -2; –Draft MOU-2 to be prepared by Transelectrica and send in advance to TEIAS

March, 2007 Slide no. 8 Feasibility study -1 Structure of the feasibility study : –Part 1 – HVDC link – Conection to the Romanian Transmission grid –Part 2 – HVDC link – Conection to the Turkish Transmission grid –Part 3 – HVDC link – Undersea cable TOR : –To be written; –To include prefeasibility needs –Needed technical assistance for TOR –Transelectrica intends to use : the expertise of Fichtner ( available in Romania and with previous expertise in similar projects ) To cooperate with sister TSO companies having direct experience in such HVDC projects ( ex : Statnett /Norway ); –TEIAS position : TBD ( to be defined )

March, 2007 Slide no. 9 Feasibility Study - 2 Financing engineering services for the feasibility study : –Financing scenarios : Without grant ( 100 % financing by Transelectrica and TEIAS with 50/50 % split for part 3 ) : –Advantage : supply independence of the engineering company; –Superior bankability for the project financing; With grant for part 3/undersea cable : –Advantage : reducing financing effort –If grand to be taken, from where and when ? Recommended scenario : without grant (100% corporate financing ); Contracting engineering services : –Contracting procedure in accordance with legislation and type of financing; –To involve as much as possible local expertise –Romania : Fichtner and ISPE

March, 2007 Slide no. 10 Business study Extremely important and sensitive; TOR to be written; –Consultancy partialy needed To be done in parallel with the feasibility study; Contracting : with international technical assistance Financing : proposal - jointly by Transelectrica and TEIAS ( 50/50% split ) To explore and facilitate involvement of private investors from Turkey and Romania in order to : –Increase the commercial use of the HVDC link –Reduce the cost of financing;

March, 2007 Slide no. 11 Business study – main chapters in TOR Marketing analysis –Clients ( for transmission services ); –Volumes and periods –Contracts and prices; Regulatory analysis –Requirements of the national authorities; Acceptance in the RAB ( regulated asset base ); –EU requirements, including UCTE, ETSO Definition of the business model Definition of the ownership model –Ownership structure; private investors; Definition of the business plan –Compatibility cross-checkings –Sensitivity analysis