REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER.

Slides:



Advertisements
Similar presentations
Central Office for Development Strategy and Coordination of EU Funds ABSORPTION CAPACITY FOR IPA COMPONENTS III AND IV IN CROATIA 19 October 2009 Zvonimir.
Advertisements

THE REPUBLIC OF SERBIA MINISTRY OF TRANSPORT & TELECOMMUNICATIONS STRATEGIC GOALS AND STRATEGIC REFORMS HINTS STRATEGIC GOALS AND STRATEGIC REFORMS HINTS.
EU Strategy for the Danube Region – Vienna/Bratislava Conference
FASRB and the Water Risk Management Samo Grošelj Deputy Secretary, ISRBC.
Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC IWRM in the Sava River Basin – a basis for sustainable development of the region.
Implementation of waste management plans in Serbia 2013 workshop on Waste Policy Implementation May 2013 Copenhagen.
Perspectives of development Petar Margic Budapest, September 17th, 2013 Danube Commission, Budapest.
Irene Lucius, Laurice Ereifej, Tamas Gruber, Georg Rast WWF DCPO/WWF Hungary/WWF Germany Perspectives for IWT in the Danube region from an NGO point of.
Sustainable development of inland waterways transport Tamás Marton – Ministry of Transport, Communications and Energy – Hungary
RIS Directive October 11 th 2007 Annick Javor RIS Directive River Information Services.
Directorate for Inland WaterwaysRepublic of Serbia - How the Danube within Serbia is being integrated into a major sustainable waterway and to deal with.
Pre-Feasibility Report For the Rehabilitation and Development
DEVELOPMENT OF THE GIURGIULESTI PORT COMPLEX. Giurgiulesti International Free Port ha, - has the status of a free economic zone - the oil terminal.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Minimum Requirements for the Issuance of Boatmaster‘s Certificates (Resolution No. 31) – Amendments' proposal SC.3/WP.3 39th Session, Geneva, june.
Towards a sustainable development in the Sava river basin Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC.
Project funded by The European Union Government of the Republic of Serbia European Integration Office INDUCTION TRAINING SEIO GENERAL FRAMEWORK CREATED.
WATERBORNE TRANSPORT DEVELOPMENT STRATEGY IN THE REPUBLIC OF SERBIA Ministry of Construction, Transport and Infrastructure Republic.
REGIONAL WORKSHOP "AGRICULTURAL NUTRIENT POLLUTION CONTROL IN BLACK SEA DANUBE PARTNERSHIP COUNTRIES" Ministry of the Agriculture and Water Management.
MAKING USE OF IPA IN CROATIA – OPERATIONAL PROGRAMMES UNDER COMPONENTS III AND IV 13 November 2007.
Fostering contribution of the SME sector to the FASRB implementation.
Audit of Public Procurement
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Ministarstvo finansija Vlada Republike Srbije Instrument za pretpristupnu pomoć Instrument for Pre-Accession Assistance – IPA
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
Major project development in the Framework of CF and ERDF funds JASPERS - a technical support facility Presented at an InterAct Danube Region Strategy.
Forum for Sustainable Mobility and Metropolitan Development Oradea, November 2013 JASPERS Teo Falato, Transport Sector Specialist.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
Guidelines for Waterway Signs and Marking (Resolution No. 59) – Amendments' proposal SC.3/WP.3 38th Session, Geneva, February 2011.
Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.
Selected Activities of the Sava Commission DANUBE INFORMATION SERVICES CONFERENCE – DISC, Belgrade, 3rd-4th December, 2013.
State of Environment Reporting in the Republic of Serbia Elizabeta Radulovic EEA NRC SOE Serbia Serbian Environmental Protection Agency Meeting on Environmental.
MOBILISATION OF RESOURCES TO IMPLEMENT THE DANUBE STRATEGY Ruse/Giurgiu, May 2010 T. Sobieski European Commission-Head of Unit C2, DG ELARG.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
Sergey Tzarnakliyski Belgrade, December 4, 2013 Danube Commission, Budapest Selected Activities of the Danube Commission Steps towards sustainable Mobility.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Stabilisation & Association Process: the EU Policy for South East Europe Brussels December 2004.
River information services in Croatia Silvio Ridzak DISC ´13 Belgrade,
Republic of Croatia Ministry of Environmental Protection, Physical Planning and Construction Experience in Implementation of IPA Projects in Croatia Brussels,
SEA in the Czech Republic Prague, 24 September 2008.
BOSNIA AND HERZEGOVINA Cabinet of the Chairman of the Council of Ministers Public Administration Reform Coordinator’s Office PUBLIC ADMINISTRATION REFORM.
1 Third BERCEN Plenary Meeting Brussels, December 2004 Agenda item 13 Key achievements in environmental enforcement and compliance - discussion on.
Overview of Jaspers Assistance in Croatia Jakša Puljiz, Ph.D, Deputy Minister, Ministry of Regional Development and EU Funds.
Belgrade, Donor Coordination Meeting Belgrade, 4 th of June 2012.
Report on reforms in environmental policy and reconstruction Croatia 8th REReP Task Force meeting September 23, 2005 Brussels, Belgium.
River information services in Croatia Krunoslav Sopček DISC ´12 Vukovar,
INTERNATIONAL SAVA RIVER BASIN COMMISSION Almaty (KZ) October 2007 SAVA RIVER BASIN COMMISSION Dragan Zeljko The Sava Commission Secretariat Deputy.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
JOINT STATEMENT FOLLOW UP MEETING `09 Horst Schindler, Ivana Tomic Budapest, January 29, 2009 Danube Commission, Budapest.
Short overview of the legal framework of protected sites and status of existing ecological networks in Serbia.
Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Structured Dialogue Brussels, 19 September
UNECE Working party SC.3 (15-16 March 2006) rkm of the waterway from Belgrad up to Sisak Serbia & Montenegro.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport policy Bilateral screening:
Report on reforms in environmental policy and reconstruction Bosnia and Herzegovina 8th REReP Task Force meeting September 23, 2005 Brussels, Belgium.
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Quality assessment of internal audit activities performed on a periodical basis Nikolina Bibić, Ministry of Finance, Central Harmonization Unit Republic.
PRESENTATION OF MONTENEGRO
The current situation of intermodal transport in Serbia
SAVA COMMISSION Navigation in the Sava River Basin -
Instrument za pretpristupnu pomoć
News from the Sava Commission
Danube Strategy New Challenge and new Opportunities- State of Play
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
IPA 2008 – support to environment Brussels, 28th November PEIP Regional Meeting Joanna Fiedler European Commission DG Environment.
Presentation transcript:

REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER

 Navigation is open for merchant vessels of any state;  Merchant vessels are free to enter the ports;  The Parties shall undertake measures to maintain the waterway.

 In the middle of the XVIII century almost 50 ships operated on the Sava river;  First passenger line Sisak – Zemun started in 1844;  About 15 mil. T in 1990;  Activities were stopped during the war.

 Present condition is a result of the long period of poor maintenance  The physical parameters of the Sava waterway cause unfavourable navigation conditions related to: Limited draft during large periods; Limited width and sharp river bends limiting the length and width of vessels and convoys; Limited height for passages under some bridges.

 In the framework of the “Sava initiative” (process of drafting and concluding the FASRB), recognized as the priority project  Framework Agreement on the Sava River Basin (FASRB) – signed in 2002, entered into force in 2004  Joint Statement of the transport ministers from the Sava countries – Brčko  Strategy for implementation of the FASRB

 Prefeasibility study  Transport demand and institutional, policy and legal framework study  Feasibility study  Restoration of the marking system

Sava River Feasibility Study Feasibility Study and Project Documentation for the Rehabilitation and Development of Transport and Navigation on the Sava River Waterway

 Beneficiaries  Sava Commission  Slovenia, Croatia, B&H and Serbia  Contracting Authority  Sava Commission  Financing  Slovenia, Croatia, B&H and Serbia

The Study Team

The Study goals & Objectives Policy guidelines for the short-term, mid- term, and long-term development of waterway traffic and navigation, Action Plan for Rehabilitation and Development of Transport on the Sava River Priorities concerning investments, operations, and maintenance

A Multi-functional Approach

Cumulative traffic volume per main segment (year 2027, minimum and maximum estimated volumes)

Identified Improvements Class IV  Training works and dredging (19 locations)  River bend improvements (20 locations)  Bridges (3 locations)  Sunken vessels (2 locations)  River Information Services (covering km)

The total construction costs to achieve SCC Class IV and Class Va waterway for the Sava river stretch km 0.0 – 586 amount to Cla. IV Euro 80,7 mil. Cla. Va Eur 86,4 mil. Rehabilitation - costs

Recommendations 1.Section Sisak-Belgrade Stimulate commercial transport on Sava River by upgrading to ISRBC Class Va 2.Section Upstream Sisak Stimulate nautical tourism Refrain from introducing commercial transport 3.Develop alternative uses of Sava River Integrated tourism/environmental development upstream Sisak Selective tourism/environmental development downstream Sisak Energy production and water management upstream Sisak. 4.Other important initiatives River Information Services development Integrated and multi-modal transport sector strategies Regulatory framework for IWT sector in line with Acquis

Development Strategy Rugvica

Environmental Reports 1  Within the time and available budget the Strategic Environmental Review was carried out, including: oDescription of locations oAreas of Intervention effects oEstimation of intervention acceptability oHarmonization with international obligations oPropose environment protection measures oEnvironmental monitoring program oEvaluation of costs for environmental protection  EIA recommendations to be used for further studies to implement the proposed works

 This document is a basis for EIA reports preparation (which will follow), it gives only a general overview of the intervention location, possible impacts and measures to be conducted.  EIA reports and EIA process in accordance with then Environmental Impact Assessment (EIA) Directive (85/337/EEC) and national regulations will be prepared and conducted during the following phase of project preparation.  The Joint Statement on Guiding Principles for the Development of Inland Navigation and Environmental Protection in the Danube River Basin has been taken into account during preparation of this document. Environmental Reports 2

 2 workshops during the development of the Study  Presentation of the Environmental Reports on the web site of the Sava Commission  Public presentation of the Final Report

Ongoing Activities

 Detailed Design rkm 586 to rkm 207 – application for the IPA funding – Republic of Croatia  Detailed Design rkm 207 to rkm 0 – application for IPF funding – B&H, Republic of Serbia, Sava Commission

 EIA Study - (rkm ): ongoing, financing by Croatia coordination between Croatia and B&H  EIA Study - (rkm 207-0): Part of the project aplication for IPF funding

 ToR for Project “RIS implementation and prototype installation on the Sava River” finished  Determination of the financing model still ongoing in cooperation with the Sava Countries

 Sava Commission accepted Timeframe for development of the Master Plan for Nautical Tourism in the Sava River Basin  Project Fiche for Master Plan finished  Preparation of the meeting of the competent authorities from the Sava Countries

Thank you for your attention!!! Željko Milković