University of Saskatchewan Geological Engineering GEOE 498.3 Introduction to Mineral Engineering.

Slides:



Advertisements
Similar presentations
Energy Conservation Mike Klun Cargill. Getting Started (Planning) Why do I want to do this? – Cost reduction or environmental impact Will I be successful?
Advertisements

MAINTENANCE PLANNING AND SCHEDULING
Total Productive Maintenance
MAINTENANCE MANAGEMENT Module 9
Total Productive Maintenance
KPI Familiarisation.
CAREERS IN MINING. It’s an exciting time to be involved in the minerals industry.
TRANS-SIBERIAN GOLD PLC 30 June 2014 Annual General Meeting TRANS-SIBERIAN GOLD.
E STIMATION 1 Excavation 2 lesson 5. E XCAVATION 2 Recap from excavation 1 Looking at site plans Desk top study Site Visit Unit pricing of excavation.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
Ventilation Requirements for Uranium Mines Rabbit Lake Operation Presented by: Cristian Gherghel, P. Eng. Mine Engineer, Eagle Point Mine.
Productive Maintenance
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
Henderson Mine Site. Henderson Mine Central Campus Shaft Collar Elev 10,400 ft Shaft Bottom Elev 7,500 ft LA Ramp Primary Access Ramp 3600 ft Central.
Unit III Module 4 - Hard Time Task
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
Pike River Coal Mine ACARP Presentations August 2008 Peter Whittall – General Manager, Mines PIKE RIVER COAL.
Maintenance and Reliability
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
Computerised Maintenance Management Systems
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15S Maintenance.
Total Productive Maintenance (TPM)
Amrit Prakash Jonko 08MN23.  A method of mining whereby high value ore is mined in such a manner as to make the low-grade ore left in the mine incapable.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
CAREERS IN MINING Rubin Pajoohan Fartak International Engineering co.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan August 2014.
How is a manufacturing facility planned?
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
TASK PACKAGING Module 1 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Single Minute Exchange of Die OR Quick Changeover
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
To achieve a level 3 your work must show that: With some help you can gather information to help with designing your project You can draw suitable ideas.
Effective Energy Management. 1.Develop baseline 2.Identify and quantify savings opportunities 3.Measure and benchmark to sustain efforts.
Computer Aided Process Planning (CAPP). What is Process Planning? Process planning acts as a bridge between design and manufacturing by translating design.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
MNM Fatal Fall of Roof Accident Fall of Roof Accident April 15, 2011 (Idaho) April 15, 2011 (Idaho) Underground Silver Operation Underground Silver.
Maintenance McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Montabert The Alternative Drifters replacement THE ALTERNATIVE
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Copyright 2010, The World Bank Group. All Rights Reserved. Producer prices, part 1 Introduction Business Statistics and Registers 1.
Dust Control In Hard Rock Mines What You Can’t See Can Kill You.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
1 Office Space Requirements 2 Universal Axioms Manufacturing managers in large companies tend to overestimate their individual cell or departmental space.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Ventilation Cooling Mark A. LaurentiMarch 2002 Modular Configuration.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
ISA Toronto Enbridge Gas Distribution Program Incentives & Case Studies January, 2011.
Maintenance Management
Tube well pump using wind power Nishan Madushanka HND/CV/03/12.
SHORT DELAY BLASTING IN UNDERGROUND MINING
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
Mechanical Engineers immigrate to Australia and Canada The Mechanical engineers have a high demand in countries like Australia and Canada. The qualified.
TRANS-SIBERIAN GOLD PLC Annual General Meeting
Fort Stanwix National Monument Energy Audit Contract
Seminar On Energy Audit Submitted To: Submitted By:
Maintenance Scheduling
How to Pass SMRP (Society of Maintenance
MAINTENANCE PLANNING AND SCHEDULING
Operations Management
TPM Definitions Goals and Benefits Components GEOP 4316.
Operations Management
Operations Management
Presentation transcript:

University of Saskatchewan Geological Engineering GEOE Introduction to Mineral Engineering

Lecture # 3  Production Rate Productivity Productivity Stope Production Stope Production Mine Production Mine Production  U/G Infrastructure

Productivity vs. Production  Productivity is the rate at which a task is completed or ore is produced. In mining it is usually reported in units per machine or man hour. Drilling: metres per drill - Hour Drilling: metres per drill - Hour Mucking: Tonnes per LHD - Hour Mucking: Tonnes per LHD - Hour Development: metres per man-shift. Development: metres per man-shift.  Production is the total amount produced. In mining it is usually the total production per day, week, month or year.

Determining Productivity and Production  Rule’s of Thumb  Benchmarking  Historical Data  Equipment Specifications  First Principle Calculations

Rule of Thumb   Rule of Thumb – An easy to remember guide that falls somewhere between an engineered solution and an experienced or educated guess.   Are the Rules always correct? Absolutely no. Can they provide a quick answer or a starting place? Absolutely yes.   The primary usage of Rules of Thumb should be in the development of conceptual designs and feasibility studies or, when a quick decision is required in the solution of an operating problem.   When the time arrives for final design and actual construction, Rules of Thumb are no substitute for sound engineering practices.

Productivity - Rule’s of Thumb

Mucking Productivity

Productivity - Drilling

Mucking Productivity - Trucking

Mucking Productivity Large Scoop

Benchmarking  Gathering information and statistically analyzing how other similar operation are performing. Production Production Productivity Productivity Cost Cost Safety Safety  Information is not always readily available.  Must ensure that orebody, skill of labour, work organization, consumable costs, etc. are in fact similar.

Benchmarking

First Principle Calculations  Zero based calculations where the production or productivity estimate is created by the mine engineer.  Typically used at the detailed design stage.  Equipment specifications, quotations, detailed drawings, established engineering practices form the bases.

Equipment Manufacturer  Equipment Manufacturers have detailed specifications for their equipment that will provide data on: Productivity Productivity Energy consumption Energy consumption Water Consumption Water Consumption Compressed Air Compressed Air Size of Openings Size of Openings Weights Weights

Equipment Manufacturer  The specifications are typically derived under ideal conditions.  The mine engineer must factor in site specific conditions such as: Skill of work force Skill of work force Environment (heat, depth, humidity) Environment (heat, depth, humidity) Condition of openings Condition of openings Hardness of rock Hardness of rock Maintenance Maintenance Availability and Utilization Availability and Utilization Play LHD Video

First Principle Shotcrete Calculation

Productivity Mucking Equipment

Mucking Productivity - Trucking

Productivity Drill Equipment

Tunneling Equipment

Historical Data  Usually applies to existing operations and is used to forecast production and create annual operating budgets. If a site does things the way they always did, can expect the same results. If a site does things the way they always did, can expect the same results.  Data gathered from time studies.  May also be used when estimating productivity, production and costs for an expansion.

Summary  In most estimating situations a combination of history, benchmarking, rule of thumb and first principle calculations are used.  CAUTION: in mining “stuff happens” It is important to build efficiency factors and reality into the estimate. Types of Delays: Types of Delays: Gas Check Equipment down Ground Conditions No Materials Surveying Air, water, vent, power Travel and Breaks

Equipment Availability  Rule of Thumb - New and/or well maintained equipment will have % effective availability

Equipment Utilization  Rule of Thumb - New and/or well maintained equipment should have 60-70% effective utilization

Equipment Reliability  Reliability: is the probability that a piece of equipment or system will perform its required function under stated conditions for a stated period of time.  MTBF: Mean Time Between Failures – how long a piece of equipment or system will operate before it fails.  TTR : Time to repair  Preventative Maintenance : routinely schedule equipment for service and inspection of key components  Predictive Maintenance : Schedule changeout of key components and major overhauls or rebuilds prior to equipment failure.

Example 1  Estimate development advance and metres per manshift in a typical development  Assumptions: RMR : Very Strong RMR : Very Strong 2 man Crew, 2 man Crew, 2 boom Jumbo, stoper for ground support, med sized scoop 2 boom Jumbo, stoper for ground support, med sized scoop Round size is 5x5x3.5 Round size is 5x5x3.5 Drill pattern requires 65 holes Drill pattern requires 65 holes Bolting pattern is 1.5x1.5 and 2m long bolts Bolting pattern is 1.5x1.5 and 2m long bolts

Example 1

Estimating Mine Production  Taylor’s Rule is a means of estimating Mine Life and Daily Production. It has been calibrated against many mines over several years and is adequate for pre-feasibility level estimates. L=0.2T 0.25 PR=T/(LxDPY) Where L=Mine Life T=Resource (inc. Dilution and Recovery) PR=Daily Production DPY=Scheduled Days Per Year

Example 2  Orebody A is t  The expected Recovery is 90% and dilution is estimated at 20%, therefore the Resource = 2mt x.9 x 1.2 = 2.16 mt  L=0.2T 0.25 L = 0.2 x ( ) 0.25 L = 7.7 years  If the mine is scheduled to operate 350 days per year, then the daily production is PR=T/(LxDPY) PR= /(7.7 x 350) PR ~ 800 tpd

Example 3  Orebody B is t  The expected Recovery is 80% and dilution is estimated at 10%, therefore the Resource = 20mt x 0.8 x 1.1 = 17.6 mt  L=0.2T 0.25 L = 0.2 x ( ) 0.25 L = years  If the mine is scheduled to operate 350 days per year, then the daily production is PR=T/(LxDPY) PR= /(12.95 x 350) PR ~ 3900 tpd

Example 4  Orebody A is a nearly vertical quartz vein containing 0.25 oz gold per tonne (insitu). It is a tabular, deposit that measures 215 metres on strike, 240 m high and 15m thick. It has a strong ore and f/w and a week h/w. The top of the orebody is 200 metres below surface and the bottom is 440 metres below surface. Both ore and waste have a SG of 2.6 t/m 3  The chosen mining method is Transverse Mechanized Cut and Fill.  Stope dimensions Have been established as 7m wide x 24m high x 15 m long

Example 4  Determine: Average tonnes per day per stope of ore and waste. Average tonnes per day per stope of ore and waste. Number of stopes required to meet daily production target. Number of stopes required to meet daily production target. The truck fleet size. The truck fleet size.

Example 5  Orebody B is a thick, tabular steeply dipping Nickel deposit with a diluted grade of 3% Ni. It averages 330 metres on strike, 400 m high and 40m thick. It has a strong ore and h/w and a moderate f/w. The top of the orebody is 100 metres below surface and the bottom is 500 metres below surface. The recovered ore has an S.G. of 3.8 and the waste has an SG of 2.6 t/m 3  The chosen mining method blasthole stoping with paste fill  Stope dimensions Have been established as 15m wide x 32.5m high x 20m long

Example 5  Determine: Average tonnes per day per stope of ore Average tonnes per day per stope of ore Number of stopes required to meet daily production target. Number of stopes required to meet daily production target. If 30 metres of development is required to access each stope, calculate tonnes of waste per day If 30 metres of development is required to access each stope, calculate tonnes of waste per day

Sequencing  Once the number of stopes are determined, they need to be sequenced  Considerations: Stress Stress Voids Voids Fill Cure Time Fill Cure Time Logistics (congestion on a level) Logistics (congestion on a level) Ventilation Ventilation Capital or access developement Capital or access developement

Chevron & Primary/Secondary Mining Primary Stopes Secondary Stopes STRIKE

Mining Sequence Sill level 1 PPPSS

Mining Sequence Sill level 1 PPPSS 2

Mining Sequence Sill level 1 PPPSS 2 33

Mining Sequence Sill level 1 PPPSS

Mining Sequence Sill level 1 PPPSS

Mining Sequence Sill level 1 PPPSS

Sequencing