5th B3G-SA Cluster Meeting (Beyond-3G Systems Architecture) 5th B3G-SA Cluster Meeting.

Slides:



Advertisements
Similar presentations
LLP/ERASMUS OFFICE R ome, April 12th 2011.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Public Policy Forum Foro Público de Políticas Fórum Público de Políticas co-Chairs: Max Larson Henry Nicolás Antoniello.
Public Policy Forum Foro Público de Políticas Fórum Público de Políticas co-Chairs: Max Larson Henry Nicolás Antoniello.
Future Internet Standardization: SC6
Asia FI Workshop on Fundamental Issues of Future Internet rkshop/main.htm Date: October 26, 2008 Venue: HuangHai.
SOI Asia / AI Spring Meeting Huahin Thailand 18-19, April 2006.
ITS RADIO SERVICE (DSRC) SECURITY T. M. Kurihara, Chair IEEE P1556 Working Group August 22, 2003.
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
13 September 2012 SDMX Technical Working Group1 Report of the SDMX Technical Standards Working Group SDMX Expert Group Meeting, Paris, September 2012.
Doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project.
Project Planning Adhoc: WG Opening Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0022 Date Submitted:
ITU-R Liaison Group Report - Session #63 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0088r1.
Vivek Gupta, Chair WG Joint Opening Plenary IEEE Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta
29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
Joint WGISS-WGCV Session John Faundeen WGCV-23 & WGISS-19 9 March 2005 Cordoba, Argentina.
NSIS WG 71th IETF Philadelphia, PA, USA March 12, 2008 WG chairs:John Loughney Martin Stiemerling.
CONEX BoF. Welcome to CONEX! Chairs: –Leslie Daigle –Philip Eardley Scribe Note well MORE INFO: -ECN.
NETMOD Agenda David Kessens Jürgen Schönwälder IETF 80 - NETMOD WG.
GEO-4 Actions and Timetable Helen Wood Secretariat Director April 2004 GEO Co-Chairs.
Nokia - European R&D collaboration Juha Saarnio Head of Industrial Initiatives Nokia Research Center Juha Saarnio Head of Industrial Initiatives Nokia.
GRID-Workshop 24 May ETSI GRID-WORKSHOP 24 May 2006 Introduction Karl Heinz Rosenbrock ETSI Director General.
IEEE CQR-TC Technical Committee Meeting Kenichi Mase and Hiromi Ueda Kenichi Mase and Hiromi Ueda May 19, 2005 ICC 2005, Seoul, Korea.
GSMP Local Community Network Global Agenda 28 Feb (Melanie Kudela.
Information Society and Media Directorate-General – European Commission Unit Grid Technologies IST-Call 5 Grid Information Day - Brussels, 30 May 2005.
Prof. Dr. W. Prinz Summary of the STREP session 13. April 2005 Wolfgang Prinz The following slides summarize the presentations.
January 15, 2007 RFID projects cluster meeting, Brussels1 Overview RFID Projects Cluster Meeting January 15, 2007 Brussels, Belgium ERA CO-ORDINATION STUDY.
Broadband for all in call 1 Broadband Fixed Access Wireless Broadband Access Protocols, Interoperability Network and service management NOBELNOBEL OPERA.
Session II: Broadband for All (SO 2.4.4) Agenda 14:00 – 16:00 Welcome by Manuel Monteiro Coffee break (PC- installation of participants presentation slides)
Regional and national initiatives in support of European Technology Platforms Dr. Fiona Williams Chairman, eMobility steering board
Welcome Research Infrastructures Info Event Brussels, May 2005.
Anti-SPAM activities in Malaysia - Current Situation, Regulatory Environment and Future Developments ITU virtual conference on anti-spam regulation and.
SVQs Business and Administration Launch Events January/February 2011.
UKSON e-Navigation Operational & Technical Working Group 16 th February 2007.
FP IST-5 Research Networking Testbeds Maria F. Ramalho 26 May 2005.
© University of Reading Directorate of External Affairs April 23, 2014 The web cooperative Educating and enabling our colleagues.
| Copyright © 2009 Juniper Networks, Inc. | 1 WX Client Rajoo Nagar PLM, WABU.
Room Scribe Orientation ATE Birds of a Feather Sessions October 2010 FOR AUDIO, PLEASE CALL: Passcode: #
Room Facilitator Orientation ATE Birds of a Feather Sessions October 2010 FOR AUDIO, PLEASE CALL: Passcode: #
Break Time Remaining 10:00.
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
IEEE/FIPA WG Mobile Agents Ulrich Pinsdorf Fraunhofer-Institute IGD, Germany Dept. Security Technology
Guide for Proposers Research Infrastructures Integrated Infrastructure Initiative - I3 Bernhard FABIANEK European Commission,
1 Introduction to the OIE-PVS Tool Dr Bernard Vallat Director General Siem Reap, Cambodia, March 2007.
We are learning how to read the 24 hour clock
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Development of the Smart Grid Implementation of the Board’s Policies Smart Grid Working Group November 29, 2012.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GTSC-9 Summary Glenn Parsons, GTSC-9 Chair, ISACC Document No: GSC16-CL-04 Source: GTSC-9 Contact:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC-16 Closing Plenary Summary Report Jim MacFie, Chair Ed Juskevicius, Rapporteur Document No: GSC16-CL-39r1.
Omniran ecsg 1 OmniRAN EC SG November 2013 EC Opening Report Chair: Max Riegel (NSN)
Omniran ecsg 1 OmniRAN EC SG March 2014 Opening Report Chair: Max Riegel (NSN)
ITU-R Liaison Group Report - Session #80 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
ITU-R Liaison Group Report - Session #78 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
MOTOROLA and the Stylized M Logo are registered in the US Patent & Trademark Office. All other product or service names are the property of their respective.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
European Commission DG Information Society Game Structures & Collaborative Environments Léonie Schäfer DG INFSO – New Working Environments Brussels, April.
Jeju, 13 – 16 May 2013Standards for Shared ICT GTSC-10 Summary Kishik Park, Ph.D. GTSC-10 Chair, TTA Document No: GSC17-CL-04r1 Source: GTSC-10 Contact:
: 3 00.
5 minutes.
European Clearing-House Mechanism Portal Toolkit Expert Group Meeting
Clock will move after 1 minute
4th B3G-SA Cluster Meeting (Beyond-3G Systems Architecture) 4th B3G-SA Cluster Meeting (Beyond-3G Systems Architecture)
1 MultimEDia transport for mobIlE Video AppLications 9 th Concertation Meeting Brussels, 13 th February 2012 MEDIEVAL Consortium.
MWIF Architecture Status Jan Paul Reynolds TC Chair.
IMT-Advanced Closing Report
Presentation transcript:

5th B3G-SA Cluster Meeting (Beyond-3G Systems Architecture) 5th B3G-SA Cluster Meeting (Beyond-3G Systems Architecture) 09 Mar 05, Brussels Hong-Yon Lach, B3G-SA Cluster Chair

Concertation 07 Dec 2004 page 2 5th B3G-SA Cluster Meeting Venue –Av. de Beaulieu 33, room 0/58 –09/03/05 –09:00-13:00 Plenary Session (09:00-09:30) –B3G-SA Cluster Report –B3G-SA Cluster operation –MOCCA, MOCCA, Fiona Williams Workshop Session (09:30-13:00) –09:30 The Ambient Networks Naming Architecture, Ambient Networks, Norbert Niebert –10:00 "Cooperation Mechanisms for Efficient Resource Management between 4G and legacy RANs", WINNER, Albena Mihovska –10:30 Support for Reconfigurable Terminal Mobility during Software Download, E2R, Nikolas Olaziregi –11:00 Technical Results about Ambient Networks Mobility after Project Year 1, Ambient Networks, Jochen Eisl –11:30 Multihoming in Mobile IPv6, Daidalos, Andrea Travasoni –12:00 Radio Resource Management Strategies in the framework of the EVEREST project, EVEREST, Jordi PEREZ-ROMERO –12:30 Discussion and wrap-up Adjournment (13:00)

Concertation 07 Dec 2004 page 3 B3G-SA Cluster Operations Update B3G-SA Cluster Report (ed 2004) delivered on 23 Dec 04 –168 pages –12 individual contributions by 8 projects AMBIENT NETWORKS, BROADWAN, DAIDALOS, E2R, EVEREST, FIFTH, SAILOR, SIMPLICITY –2 joint papers initiated by B3G-SA Cluster Mobility, QoS and Security in Public Pico-Cell Wireless Networks Interoperability, Network Composition & Self-Configuration –Announcement on B3G-SA Cluster list –Announcement submitted to IST Results service –Available at B3G-SA Cluster webpage Ralf Toenjes resigned as vice-chair 2005 objectives –Pursue joint workshops with other clusters –Produce B3G-SA Cluster Report in Dec 05

Concertation 07 Dec 2004 page B3G-SA Cluster Meetings Mar –9 Mar, after Concertation Meeting Jun (with IST Mobile Summit) –No meeting, makes no sense Sep –23 Sep, after Concertation Meeting –Pursue joint-cluster workshop with Security Cluster Dec –No meeting, not too practical

Concertation 07 Dec 2004 page B3G-SA Cluster Report Target delivery in Q4 05 Themes –Objectives: detailed technical approaches to share in B3G community Leverage from Year 2 results of most FP6 Call 1 projects Focus of cream of project results –Significant project technical results with good details –Joint-project papers Joint-project paper initiatives –User, operator, provider, regulator Lead: Riccardo Pascotto Lead: Hans-Werner Bitzer DAIDALOS, AMBIENT NETWORKS, E2R, OBAN, etc –Other proposals being established

Concertation 07 Dec 2004 page 6 B3G-SA Cluster Vice-Chair Chair responsibilities –Arrange overall meeting agenda Chair the cluster plenary session Determine themes for cluster workshop sessions Co-ordinate joint-cluster workshop sessions –Plan and produce B3G-SA Cluster Report Solicit inputs Review (with vice-chair) Produce feedback to contributors Compile accepted inputs Produce and announce report –Manage B3G-SA Cluster webpage with IST project officer –Report B3G-SA Cluster status in Concertation meetings Vice-chair responsibilities –Maintain cluster list –Arrange cluster workshop sessions Chair the cluster workshop session Solicit inputs –Review inputs for B3G-SA Cluster Report –Act on behalf of chair in case of his/her absence Martin Johnsson as vice-chair replacement for Ralf Toenjes

Thank You!