2014 Homeless Management Information Systems (HMIS) Data Standards for ESG Presented by Melissa Mikel September 2014 1.

Slides:



Advertisements
Similar presentations
Overview and Introduction to HMIS Concepts: VA Community Contracts Part II: Data collection requirements, reporting requirements, AHAR, and Pulse.
Advertisements

Supportive Services for Veteran Families (SSVF) HMIS and the Impact of Outcomes in Prevention Services Sponsored by: National Center on Homelessness Among.
2014 HUD Data Standards. New & Active Clients All ESG, CoC and SSVF funded agencies are required to begin collecting data on new and active clients based.
2012 PATH Data Reporting Tison Thomas Substance Abuse and Mental Health Services Administration (SAMHSA) Rachael Kenney & Amy SooHoo SAMHSA Homeless and.
The Annual Homeless Assessment Report (AHAR) January 1, 2006 – June 30, 2006.
2014 HMIS DATA STANDARDS AWARENESS. Agenda Basic Privacy & Security Rules for HMIS 2014 HMIS Data Standards Overview of Key Changes.
2014 HMIS Data Standards: Pacific Region Overview
Ohio Balance of State Continuum of Care Introduction to the 2014 HUD Data Standards July 17, 2014.
2012 SuperNOFA Presented by: OC Partnership 1505 E 17 th Street Santa Ana, CA (714) HMIS Reports Training.
2014 H OUSING I NVENTORY C OUNT (HIC): W HAT YOU NEED TO KNOW ! J ANUARY 14, 2013.
Fine Print These are the anticipated changes that will occur, some modifications may still occur. The anticipated changes are still being coded. Additional.
SERVICEPOINT 4.0 The importance of Annual Homeless Assessment Report (AHAR) and Entering Children into a household By NH-HMIS.
HMIS Homeless Management Information System. MISSION To provide standardized and timely information to improve access to housing and services, and strengthen.
Recertification Process Meeting July 13,  In March 2010, HUD distributed a revised version of the Data Standards for HMIS  New set of Program.
COSCDA Conference 2012 Washington, DC Karen DeBlasio, HUD March 13, 2012 Homeless Management Information Systems (HMIS)
WELCOME & INTRODUCTIONS Indiana HPRP Training 1. TRAINERS: ANDREA WHITE & HOWARD BURCHMAN IHCDA STAFF: RODNEY STOCKMENT, KIRK WHEELER, KELLI BARKER &
OCTOBER 24, 2012 PRESENTED BY RENEE LAMBERJACK, RESEARCH & EVALUATION ASSISTANT Annual Homeless Assessment Report Presentation to Safe Harbors Partners.
Supportive Services for Veteran Families (SSVF) Webinar Series SSVF Data Collection, Management and Reporting Under the 2014 HMIS Data Standards Audio.
Safe Harbors Quarterly Partner’s Meeting November 17, Building.
Nutmegit.com Provided by: P W FEDERAL 2014 DATA STANDARDS AND ECM 4.4 CHANGES The CT HMIS Project.
Supportive Services for Veteran Families (SSVF) Webinar Series SSVF and the 2014 HMIS Data Standards 9/24/2014 Audio can be accessed through the following.
HUD’s 2008 Annual Homeless Assessment Report Dennis Culhane, University of Pennsylvania Jill Khadduri, Abt Associates, Inc. Alvaro Cortes, Abt Associates,
Measuring Impact: Reducing Homelessness in North Carolina Megan Kurteff Schatz & Emily Halcon August 26, prepared for North.
Nutmegit.com Provided by: P W HMIS DATA COORDINATOR MEETING February 2013.
Data Standards and Reporting 2014 Updates and what they mean for your programs.
MODULE 5: REPORTING REQUIREMENTS Indiana HPRP Training 1.
Orientation to the Continuum of Care (CoC) July 29, 2014.
Supportive Services for Veteran Families (SSVF) Data HMIS Lead and Vendor Training Updated 5/22/14.
Running the New HUD APR August wilderresearch.org Webinar Use the questions section in the bar on the right to ask questions ─ We will do our best.
Think Change Be Change Lead Change CT PIT 2013 Program Staff Training January 2013 Training PowerPoint Provided by CCEH CT Coalition to End Homelessness.
Supportive Services for Veteran Families (SSVF) Data Data Collection & Reporting: Basics Updated 5/22/14.
Safe Harbors Quarterly Partner’s Meeting August 25, 2015 Northgate Community Center.
Supportive Services for Veteran Families (SSVF) Data HMIS Lead and Vendor Training Updated 9/14.
2014 HMIS Data Standards Implementation in ServicePoint.
Think Change Be Change Lead Change CT PIT 2014 Permanent Housing Project Training January 2014 Training PowerPoint Provided by CCEH CT Coalition to End.
Revised HMIS Data Standards: with a focus on Chronic Homeless Status and Project Specific Data Elements Thursday, September 31.
Supportive Services for Veteran Families (SSVF) Data Data Collection & Reporting Basics.
Think Change Be Change Lead Change CT PIT 2014 Emergency Shelter Project Staff Training January 2014 Training PowerPoint Provided by CCEH CT Coalition.
The 2007 Annual Homeless Assessment Report: A Report to Congress on Homelessness in America Paul Dornan, Office of PD&R, HUD Jill Khadduri, Abt Associates.
Revised HMIS Data Standards: with a focus on Chronic Homeless Status and Project Specific Data Elements Thursday, September 31.
Think Change Be Change Lead Change CT PIT 2014 Transitional Housing Project Training January 2014 Training PowerPoint Provided by CCEH CT Coalition to.
HOMELESS VERIFICATION FORMS GRANTEE WORKSHOP Anna Jacobsen City of Pasadena.
2010 Florida HMIS Conference 1. Using HMIS to Inform Performance Measurement Outcomes Objective: –Enhance awareness and understanding on using HMIS to.
Point-in-Time Count January What Does It Mean to Count Homeless People? A “count” = collecting information about the sheltered and unsheltered homeless.
September 18-19, 2006 – Denver, Colorado Sponsored by the U.S. Department of Housing and Urban Development HUD’s Goals, Objectives and Performance Measures.
New User Training for Singles Providers TCP Policy and Programs Team.
New User Training for Family Providers TCP Policy and Programs Team.
HMIS Data Quality Training 211 Orange County. Learning Objective This training is scheduled for 2 hours. Objective 1.Teach users how to find deficiencies.
2014 HMIS Data Standards Overview HMIS Data Standards Background – Key resources – Implementation Timeline – Revision Process Overview of Key.
Discharge Destinations A Guide For Choosing the Correct Destination Option in HMIS.
Jill Shoemaker Michigan Coalition Against Homelessness.
Homeless Crisis Response System
New User Training for DHS Staff TCP Policy and Programs Team.
New User Training for Singles Providers TCP Policy and Programs Team.
2014 HMIS Data Standards Collection Points With Richard Madigan Michigan Coalition Against Homelessness MSHMIS System Administrator II
PATH “Projects for Assistance in Transition from Homelessness” Workflow June,
2017 HMIS Data Standards Update
KYHMIS BOS Quarterly Meeting
Health Care for Homeless Veterans Programs (HCHV)
HMIS Data Standards 2017 Changes
KYHMIS BOS 2017 Data Standards Updates
New User Training for Family Providers
Minnesota’s Homeless Management Information System (HMIS)
Minnesota’s Homeless Management Information System (HMIS)
New User Training for Family Providers
KC METRO HMIS Training SSVF, RRH, HP.
KC METRO HMIS Training PATH.
System Performance Measures (SPMs) and Longitudinal System Analysis (LSA) Data Quality 2018.
Introduction This report provides an overview of homelessness in Monroe County for the time period: 10/1/2107 – 09/30/2018. The time period selected is.
2019 Data Standards September 4, Data Standards September 4, 2019.
Presentation transcript:

2014 Homeless Management Information Systems (HMIS) Data Standards for ESG Presented by Melissa Mikel September

Why HMIS? Because HUD and Congress said so!!!!

Why and what is HMIS? Locally administered data system to record and analyze client, service, and housing data for homeless individuals and families Aggregate HMIS is used for annual reports (AHAR) to Congress USICH affirmed that HMIS is the official method of measuring outcomes in preventing and ending homelessness HMIS will now be used by other federal partners

Revising the Data Standards Support the integration of data collection and reporting for other federal targeted homeless assistance programs into HMIS. Which include: – U.S. Department of Health and Human Services (HHS) – U.S Department of Housing and Urban Development (HUD) – U.S. Department of Veteran Affairs

Key Issues and Concepts Project vs. Program – Program refers to the federal funding source (e.g., HUD CoC, HHS PATH, etc) – Project refers to the distinct unit of an organization, which may or may not be funded by HUD or the federal partners. This may be a Lodging Project (e.g., emergency shelter, permanent housing, rapid-rehousing, etc.), or a Services Project (e.g., street outreach, homelessness prevention, services only, etc.)

Element information Collection Points: – Record creation (RC) – Project Entry (PE) – Update (U) – Annual Assessment (AA) – Project exit (exit)

Record Creation (RC) Indicates the element is required to be collected when the client record is created. The information is collected and entered into HMIS when the client record is first created in the system Data must be reviewed at each project entry and can be edited at any time to correct errors or to improve data quality.

Project Entry (PE) Indicates the element is required to be collected at every project entry. Data elements that must be collected at the point of “project entry” are those that must be collected at every project entry and must reflect the client’s circumstances on the date of that project entry. Data collected at project entry must have an Information Date that matches the client’s Project Entry Date.

Update (U) These data elements represent information that is either collected at multiple points during project enrollment in order to track changes over time (e.g., Income and Sources) The Information Date must reflect the date on which the information is collected and/or the date for which the information is relevant for reporting purposes. Information must be accurate as of the Information Date, regardless of when it is actually collected or entered into HMIS.

Annual Assessment (AA) The annual assessment must be recorded no more than 30 days before or after the anniversary of the client’s Project Entry Date, regardless of the date of the most recent ‘update’. There must be only one record for each data element annually with a Data Collection Stage recorded as ‘annual assessment’ associated with any given client and project entry Regardless of whether the responses have changed since project entry or the previous annual assessment.

Project Exit (exit) Indicates the element is required to be collected at every project exit. The data must accurately reflect the client’s response or circumstance as of the date of project exit; the information date must correspond to the project exit date.

Example A client enters a project that has required collection points for income information at project entry and update (every 90 days). At the time of project entry, the client had no income. The caseworker documents this in a record with a data collection stage of ‘Project Entry’ and an Information Date that matches the Project Entry Date. When the client is interviewed 90 days later, the client still has no income. Even though there is no change in the client’s income, a new entry must be created with a data collection stage of ‘Update’ and an Information Date that is 90 days after the project entry date. The new entry indicates that the information is current and the client’s income has not changed.

Element Information Subject – identifies whom the data collection is required: – Head of household (HoH) – Head of household and other adults in the household – All clients Data Collection – Client doesn’t know – Client refused

Universal Data Elements Project entry date (all clients, RC) Client ID number (all clients, RC) Relationship to Head of Household (all clients, PE) Name (all clients, RC) Social Security Number (all clients, RC) Date of Birth (all clients, RC) Veteran Status (all clients, RC) Gender (all clients, RC) Race (all clients, RC)

Universal Data Elements Continued Ethnicity (all clients, RC) Length of time on Street *(HoH and all adults, PE)

Continuously homeless for at least 1 year The client has been homeless and living or residing in a place not fit for human habitation, an emergency shelter, and/or a Safe Haven continuously for at least one year as of the date of project entry. Stays in institutions of 90 days or less do not constitute a break in homelessness, provided the client was homeless prior to entering the institution.

# of Times the Client has been Homeless in The Past Three Years Enter “0 (not homeless – Prevention only)” if the client did not experience homelessness in the past three years, including today. Enter “1 (homeless only this time)”, “2”, “3” or “4 or more” based on the number of times the client was homeless and living or residing in a place not fit for human habitation, an emergency shelter, and/or a Safe Haven over the past three years

Total Number of Months Homeless in the Past 3 years If the number of times the client has been homeless in the past three years is 4 or more, count months the client was homeless and living or residing in a place not meant for human habitation, an emergency shelter, and/or Safe Haven in the past three years. Any single day or part of a month spent homeless should be counted as one month.

Total Number of Months Continuously Homeless Immediately Prior to Project Entry Indicate the number of months the client has been continuously homeless including the day of project entry. For partial months, 1 day to 30 days = 1 month. For example, a client is living on the street from mid-July to the day the client enters emergency shelter on August 5 th. This would count as two months.

Status Documented Indicate if there is documentation in the client’s paper file or in the HMIS of the client’s length of homelessness (either continuously homeless, the number of times homeless, or the number of months homeless in the past three years).

Universal Data Elements Continued Residence prior to project entry (HoH and adults, PE) Disabling condition (HoH all adults, PE) Destination (HoH and adults, at exit) Project Exit Date (all clients, at exit

HUD: ESG program specific Physical disability (all clients, PE, exit, U) Mental health problem (all clients, PE, exit, U) Substance abuse problems (all clients, PE, exit, U) Developmental disability (all clients, PE, exit, U) Chronic health condition (all clients, PE, exit, U) HIV/AIDS (all clients, PE, exit, U) Income and Sources (HoH and adults, PE, exit, U)

HUD: ESG program specific Non-Cash benefits (HoH and adults, PE, exit, U) Health insurance (all clients, PE, exit, U) Domestic Violence (HoH and adults, PE, U) Contact- street outreach (HoH and adults, PE, exit, each contact) Date of Engagement- street outreach (HoH and all adults, U) Residential move in date- rapid rehousing (All clients) Housing assessment at exit - homelessness prevention (HoH, exit)

Contact (street outreach ) Record the date and location of each contact with a client. Response Category Description: – Place not meant for habitation – Service setting, non-residential – Service setting, residential

Date of Engagement (Street Outreach) To count the number of homeless persons engaged by street outreach projects and night-by-night shelters. Record the date a client became engaged. Only one date of engagement is allowed between project entry and project exit.

Residential Move-In Date (rapid rehousing) To differentiate between clients who are awaiting placement in housing and those who have moved into permanent housing for Rapid Re-Housing projects. This data is critical to point-in-time and housing inventory counts as it differentiates a client from a homeless status (in shelter) to a permanent housing status.

Housing Assessment at Exit (homelessness prevention) To determine whether clients exiting prevention projects have remained stably housed. Responses: Able to maintain the housing they had at project entry Moved to a new housing unit Moved in with family/friends on a temporary basis Moved in with family/friends on a permanent basis Moved to a transitional or temporary housing facility program Client became homeless- Client went to jail/prison Client died Client doesn’t know Client refused

Housing Assessment at Exit (homelessness prevention) If able to maintain the housing they had at project entry Without a subsidy With the subsidy they had at project entry With an on-going subsidy acquired since project entry Only with financial assistance other than a subsidy If moved to new housing unit With ongoing subsidy Without an ongoing subsidy

Questions Contact Melissa Mikel at: Or (559)