Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)

Slides:



Advertisements
Similar presentations
Workshop on Sector Approaches in the Context of EU Integration Sarajevo, Bosnia and Herzegovina March 2010 Debriefing of the Workshop on Sector Approaches.
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Strategic Environmental Assessment (SEA) Manual Environmental Protection Department H. M. Wong 18 June 2005.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
CONFLICT RISK AND IMPACT ASSESSMENT Ottawa, 3 rd May, 2004.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Capstone Design Project (CDP) Civil Engineering Department First Semester 1431/1432 H 10/14/20091 King Saud University, Civil Engineering Department.
Yung Loo FCC: GIS & Tunnelling Update.
BUSINESS CASE Episode 3 - CAATS II Final Dissemination Event Ignacio Zozaya Boeing Research & Technology Europe CAATS II Brussels, 13 & 14 Oct 2009.
I n t e g r a t I n g C S S Practitioner Module 4 1 Module 4: CSS in Corridor and Sub-area Planning.
The effectiveness of the school’s approach to the identification and development of future school leaders – Alfred Salter Primary School What were our.
Manage Project Scope Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG502A.
Investment Portfolio Methodologies Pertemuan Matakuliah: A Strategi Investasi IT Tahun: 2009.
School of Geography FACULTY OF ENVIRONMENT School of Geography FACULTY OF ENVIRONMENT GEOG5060 GIS & Environment Dr Steve Carver
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Investigation of FCC position Impacts on Hadron Injectors John Osborne, Charlie Cook, Yung Loo (ARUP) 16/09/2014.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
TOT-FCC: Tunnel Optimisation Tool for the Future Circular Collider Introduction and lessons learnt C. Cook, J. Osborne, P. Lebrun, Y. Robert, M. Jones,
Decision making process / basic options assessment Mercury Storage and Disposal LAC Two Countries Project Gustavo Solórzano Ochoa, Consultan t Montevideo,
Options Analysis and Feasibility Study for the Safe Storage of Mercury in Latin America and the Caribbean Desiree Montecillo Narvaez Programme Officer,
1 Mercury Storage Project Desiree M. Narvaez Mercury and other metals programme Chemicals Branch DTIE United Nations Environment Programme.
Your Financial Work Defense Finance and Accounting Service DFAS Transformation Update March 2003.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
FCC Tunnel Civil Engineering and Geology John Osborne (CERN GS-SE) 4 April 2014.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
The Swiss geological programme and the role of storage Jürg Schneider National Cooperative for the Disposal of Radioactive Waste International Workshop.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Contents Scope of Work and Work Stages
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
Copyright © 2011 by ABET, Inc. and TMS 1 December 2, 2008 ABET Update UMC Meeting April 6, 2015 San Francisco, CA Chester J. Van Tyne
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Implementing MAPP: what’s next? County of San Diego Health and Human Services Tamara Bannan, M.P.H.
Summary Session Infrastructure and Operation P.Collier & Ph. Lebrun.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
Sustainability Principles for Land Use and Mobility Approved by City Council – January 2007.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Coordination of Capacity Products Meinhard Janssen GTE ExCom Member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
EuropeAid 1 Update on development of the PPCM Guidance.
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Matt Sykes Andy Kervell Yung Loo Heidi Clough Craig Sturzaker ARUP: Update on GIS Model and tunnel options under lake.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Pre-Workshop on Intervention of Science and Technology in Traditional Crafts Date : 14 th Dec Venue : Seminar Hall, First Floor of S & H Building.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Project Management in Marketing Assignment briefing June and September 2013 Frank McKee Senior Examiner Professional Diploma in Marketing.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
RISKS CONSORTIUM Seismic and volcanic risks Ciência 2010 Lisboa, 5-6 Julho, 2010.
FCC Underground Infrastructure
Civil Engineering for FCC-eh and LHeC
FCC Civil Engineering Optimisation and Design Development
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
Civil Engineering for FCC-eh IR
CLIC Civil Engineering Update
RDR Baseline Layouts for Interaction Region
Debriefing of the Workshop on Sector Approaches Sarajevo – March 2010
FCC Week 2019 Civil Engineering Summary
The UMBRA Eight-Step Benefit-Risk Framework
White Flint North Entrance Feasibility Study
Presentation transcript:

Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)

2 Scope of Works Key aim: Conceptual design study to assist CERN in identifying the geotechnical & civil engineering feasibility of a Future Circular Collider (FCC) Key areas: Geological study and creation of ground model. Establish FCC alignment options, layout options and key design requirements. Formulate a decision aid tool and screening procedure to evaluate feasible options. Assessment of options feasibility and identification of most feasible alignment/s. Identification of constructability risks, issues and constraints.

3 Context

4 Work Stages Stage 1: Development of geological model and GIS alignment decision aid tool Stage 2: Identification of key alignment layout optimisation requirements and constructability Stage 3: Refinement of above stages and establish concept for Pre-Feasibility Stage

5 Work Stages Stage 1: Development of geological model and GIS alignment decision aid tool Geological Study Integration within GIS platform Development of alignment screening process Workstage Partners:

6 Work Stages Stage 2: Identification of key alignment layout optimisation requirements and constructability Establish key requirements and criteria for alignment options Identification of key alignment, layout option/s Development of constructability constraints specific to tunnels, shafts, caverns, surface sites, excavation techniques Stage 3: Refinement of above stages and establish concept for Pre-Feasibility Stage. Identification of preferred alignment/corridors Conclusion of issues/constraints e.g. fatal flaw/risk register Environmental impact, GI, BoQ for costing & programme in partnership with:

7 Next Steps Stage 1: Feb 2014  June 2014 Stage 2: July 2014  Dec 2014 Stage 3: Jan 2015  May 2015 Design workshops and reviews with CERN GIS based decision aid tool Intermediate and final stage pre-feasibility reports Close working with BRGM and local geological experts Programme Progress & Deliverables