1Name of The Project Flamingo Free Port 2Location of the Project Red Sea Coast. Port Sudan. 3Brief Description Mega Free port With 18 Meter Depths. 4 Project.

Slides:



Advertisements
Similar presentations
«SOUTHEAST EUROPEAN INTERMODALITY»
Advertisements

Port of Duqm Company profile
“Energy from the Sea – BioFuels, Currents, Tides & Wind” Panel Contribution by Dr Tony Raven Director, Research & Innovation Services University of Southampton.
ALY’s Mystery Place! 9/17/08 Social Studies Map Unit.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
Mary Lou Maher University DECO2005, Semester 2, 2005 Project Management.
> >
Indonesia Population Density urban rural Indonesia Industrial Growth.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
Capital Budgeting.
The Marine Sector in Singapore. Shipping in Singapore Strategic network of shipping lanes 1/7 of the world’s container transhipment 200 shipping lines.
Capital Improvement Plan Workshop May 27, Capital Improvement Plan (CIP) Tool used to develop a five year timeline for scheduling necessary improvements.
Redwood City Ferry Terminal Why Ferry Service Terminal Needs Locational Analysis Land availability for 5-6 acre terminal Vehicular access Environmental.
Project Sponsor Project Manager 04/24/ Major Projects Quarterly Review.
The Port of Singapore Hengleap NOU – Tristan BARENNES– Porng HAY.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Major project development in the Framework of CF and ERDF funds JASPERS - a technical support facility Presented at an InterAct Danube Region Strategy.
THE WAY TO YOUR OWN INDEPENDENT OPEN-FIBRE NETWORK.
Investment Project Construction of Multi-purpose Marine Complex of Terminals (MMCT) “Galitsyno”
Linggi Port Oil & Gas And Industrial Park
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Key Budgetary Control Information 2011/12 - April 2011 to August 2011 – MONTH 5 APPENDIX A.
Interstate 95 Corridor Improvement Program June 20, 2012.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Allied African Co. Ltd.  We are bulk bitumen traders mainly the bulk bitumen.  Head office is located in Khartoum – Sudan.  Our bulk bitumen terminal.
Trade Corridors Improvement Fund (TCIF) California Freight Advisory Committee February 26, 2015.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
United States Coast Guard RRT BRIEFING USCG SECTOR COLUMBIA RIVER 29 June 2011.
OCFO - Financial Status of USPTO May 7, FY 2010 Status Authorized level of $1,887.0 million Mid-year Budget Execution Review currently underway.
1 Convention Center Authority Republican Policy Group Presentation March 23 rd 2015.
Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
Klaipeda FEZ in figures Operating since ha of industrial land 62 companies from 14 countries 3% of Lithuania’s GDP 5% of Lithuania’s export 3.
بسم الله الرحمن الرحيم General Information Total Installed Capacity PLAN 2015 =3155 MAX Load =2296 MW demand– 2015 =11793GWH Number of Customers2014.
Europe – Adriatic SEA - WAY Pilot Projects presentation Region of Istria Trieste, 3rd December 2015.
Location The Suez Canal is an artificial water way connecting the Mediterranean Sea to the Red Sea. The Canal is 163 km long and its width varies. It.
Offshore Central Coastal California Seismic Imaging Project April 4, 2012 Central Coastal California Seismic Imaging Program September 10, 2012.
Gabe Steinmeyer Red Sea Terror Triangle: Pt. 1 Sudan.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
SUGHD free economic zone development projects.
Regional Strategy in Freight Logistics, Maritime Transport and Trade Facilitation The Shipping industry is the oldest industry in the world next to prostitution.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Block 30 Prospecting & Production February Block 30 Overview On April 30, 2013, the Government of the Republic of the Sudan granted an exploration.
NS5 Session #1 Introduction to NS5 The NS5 System Oct 2015.
NS5 Session #2 Planned Maintenance The Maintenance Plan Oct 2015.
THE PORT OF THESSALONIKI, GENERAL VIEW CITY COMPLEX.
Pensacola Bay Ferry Service. National Park Service (NPS) Completed a Ferry Dock at Fort Pickens in November 2012 National Park Service (NPS) Completed.
بسم الله الرحمن الرحيم General Information Total Installed Capacity 2015 =3180 Demand– 2015 =11793GWH Maximum demand = 2600 MW Number of.
Transportation Management and Policy Spring Colloquium.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
PORT BULGARIA WEST.
Automotive Collision Technology
Legal Challenges Related to the Development of Marina Projects
4,135,652 Place Value Hundred Thousands Ten Thousands Hundreds
NH 3rd Stage Trajectory Prediction
Promoting Motorways of the Sea
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
How to Get Harley-Davidson Financing Despite Bad Credit
RCSA Funding Proposal.
Unified Government of Wyandotte County & Kansas City, Kansas
RCSA Funding Proposal.
4,135,652 Place Value Hundred Thousands Ten Thousands Hundreds
Seminar on Industrial Training
KICK-OFF Overview and thematic approach 19th of June 2017

Thing / Person:____________________ Dates:_________________
LOCATION: {insert location} | TIME: {insert time} | COST: Free
Presentation transcript:

1Name of The Project Flamingo Free Port 2Location of the Project Red Sea Coast. Port Sudan. 3Brief Description Mega Free port With 18 Meter Depths. 4 Project Objectives Project to accommodate the 3 rd and 4 th vessels Generations. 5DurationThe duration to implement the project is about four years.

6Type of Fund B. O.T 7Estimated Cost 450 Million $ 8Project Status All licenses and permits are available. 9Availabilit y of Study Pre-feasibility study is Available 10Date of Study April 2010

1 Name of The Project Flamingo Dry Dock & Shipyard Project 2 Location of the Project Red Sea Coast 5 Km Northern PortSudan. With in the existed Flaming Port Facilities. 3 Brief Descriptio n The project is designed to give maintenance Services for the Vessels crossing the Red Sea Areas, and in addition to Shipyard to Build vessels. 4 Project Objectives Create new Services which is not available in Sudan before 5 Duration The duration to implement the project is about one year. 1Name of The Project Flamingo Shipyard 2Location of the Project Red Sea Coast Portsudan. 3Brief Description The project is designed to provide repairing and building Services For the Vessels crossing the Red Sea routes, 4 Project Objectives Create new Services which is not available in Sudan before 5Duration Two years.

6 Type of Fund Direct Finance 7 Estimated Cost 119 Million $ 8 Project Status All licenses and permits are available. Also Designs 9 Availability of Study Available 10 Date of Study April Type of Fund -Finance 7Estimated Cost 120 Million $ 8Project Status All licenses, permits and designs are available 9Availabilit y of Study Pre-feasibility Available 10Date of Study April 2010