Combined Array for Research in Millimeter-Wave Astronomy Astronomy with CARMA Raising our Sites.

Slides:



Advertisements
Similar presentations
1 National Radio Astronomy Observatory The EVLA -- Status, Future Rick Perley National Radio Astronomy Observatory.
Advertisements

Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
CARMA in the ALMA era CARMA is well-suited for mapping large fields, extended objects; unique capabilities at 30 GHz testbed for new instrumentation and.
CSV Plan status Robert Laing ESO Science IPT. 2 Recent changes Complete rewrite to take account of rebaselining and revised delivery schedule Proposal.
The Frequency Agile Solar Radiotelescope Current Status & Plans T. S. Bastian NRAO.
Project status and specifications Douglas Bock Project Manager 1.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
CARMA (Combined Array for Research in Millimeter Astronomy) Capabilities and Future Prospects Dick Plambeck SF/ISM Seminar, 9/5/2006.
Dick Plambeck UC Berkeley (for the CARMA consortium)
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
Star Formation Research Now & With ALMA Debra Shepherd National Radio Astronomy Observatory ALMA Specifications: Today’s (sub)millimeter interferometers.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
ALMA Operations and the North American ALMA Science Center Al Wootten NRAO.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
1wnb Synthesis Imaging Workshop ALMA The Atacama Large Millimeter Array.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array FPGA Spectrometer.
Water Vapor In The Atmosphere: An Examination For CARMA Phase Correction Y.-S. Shiao, L. W. Looney and L. E. Snyder Department of Astronomy University.
The Very Small Array Angela Taylor & Anze Slosar Cavendish Astrophysics University of Cambridge.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
Large Area Surveys - I Large area surveys can answer fundamental questions about the distribution of gas in galaxy clusters, how gas cycles in and out.
Project 3 Supporting Technology. Project Proposal.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
1wnb Synthesis Imaging Workshop ALMA The Atacama Large Millimeter Array.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
ALMA Project Status Adrian Russell. Where is ALMA? El llano de Chajnantor ALMA.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Giant Magellan Telescope Project Status and Relationship with the NSF Astronomy and Astrophysics Advisory Committee February 8, 2007 Patrick McCarthy -
ARE MAGNETIC FIELDS AND OUTFLOWS ALIGNED IN PROTOSTELLAR CORES? Chat Hull University of California, Berkeley Radio Astronomy Laboratory 8 July 2013 CARMA.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Astrochemistry with the Upgraded Combined Array for Research in Millimeter-wave Astronomy D. N. Friedel Department of Astronomy University of Illinois.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
CARMA: The Combined Array for Research in mm-wave Astronomy Tony Beasley NSF Review, July
LIGO-G M Managing LIGO: Lessons for a Collaboratory Gary Sanders LIGO/Caltech NEES Awardees Meeting NSF, December 19, 2001.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
The North America ALMA Science Center
Computing Architecture
Paul Wild Observatory at Narrabri
Enterprise Content Management Owners Representative Contract Approval
Atacama Large Millimeter Array
A 10-m Diameter Submillimeter-wave Telescope for the South Pole
Observational Astronomy
Observational Astronomy
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
EVLA Operations Jim Ulvestad
Correlator Growth Path
EVLA Construction Status
Presentation transcript:

Combined Array for Research in Millimeter-Wave Astronomy Astronomy with CARMA Raising our Sites

CARMA Origins Berkeley-Illinois-Maryland Array Owens Valley Array Cedar Flat – March 2004 CARMA Contract: February 2003 U.S. F.S. Site Approval: May 2004 Site Development: 2004  BIMA 9 x 6.1m + OVRO 6 x 10.4m enhanced research capabilities hands-on training w. state-of-art instrument easy access (maintenance & development) year round operation

Cedar Flat – elevation 2200m August 2005

First Light Enhancements Better Site - higher elevation atmospheric transmission x 2, improved phase stability year-round observing: routinely at 1 mm Hybrid array – more telescopes, more baselines increased imaging fidelity, speed, & dynamic range  enhanced snapshot & mosaicing wide field mm-wave imaging on scales from 0.13  to 1 (to 3 with 8 x 3.5 m U Chicago SZA array) Enhanced performance upgraded antenna drives, cryogenics, telemetry hierarchical distributed monitor and control software Combined resources of partner universities broad science and technology base

Anticipated Developments Receivers lower noise, wideband, dual polarization (HEMT/SIS/MMIC development programs) Correlator expanded COBRA-based (SZA demonstrated) increased bandwidth - 4 GHz x 2 polarizations Improved access to CARMA data automated pipeline image production, user-friendly archive Implementation of B and A arrays  factor of 2 improvement in sensitivity

6 Array Configurations

CARMA Science Summary of the kind of science that is enabled with references to later talks CARMA will build on science accomplished Recall OVRO & BIMA results  MMA in Bahcall Report ultimately  ALMA ( science examples in proposal) CARMA endorsed in most recent Report –AANM to study star formation at all epochs etc. & to foster the training of students and US capability in mm- wave interferometry at the start of the ALMA era and beyond

CARMA for the Community AANM “to foster…U.S. capability….(in)… ALMA era and beyond” 30% observing time for the community representation on Time Allocation Committee training in mm-wave interferometric observing CARMA summer school pipeline and data archive, links to National Virtual Observatory complements Spitzer, SOFIA, NGST, ALMA in northern hemisphere Educate leaders for the future hands on training on state-of-the art instrument (postdocs, grad students operate array/allocated substantial time) support US ALMA effort in scientific research enable strong US technology development program builds on past success - (more than 12 professorial faculty directly associated with CARMA) Public Outreach Open House, relations with WMRS, local school resource

CARMA for the Community Recall AANM “to foster..” Is updated with all the young leaders and educators we have produced? Women and minorities mm-Wave Community More than 12 professorial faculty associated with CARMA Postdocs, grad students allocated substantial array observing time, do most of observing = training CARMA Summer School Larger astronomy community improved accessibility, links to national virtual observatory? contributions to ALMA from pioneering arrays CARMA pathfinder role for ALMA CARMA complements Spitzer, SOFIA, NGST, northern hemisphere complement to ALMA Public Outreach Open House, relations with WMRS, local school resource

Management & Operations CARMA Board and SSC Director & Project Manager/ Asst Dir Operations U Chicago role Science, Technical Development, Construction/Operations Assistant Director Operations –coordinating role Observing Students, postdocs main observers Friend of the Telescope

Schedule More appropriate for Douglas to do all? OR Summarize status at end of grant period Comment on pad construction and other outstanding tasks –WVR Note bulk of construction complete in spite of winter

Budget Overview CARMA Capital Construction 2001 – CARMA construction estimated at $15M BIMA universities, Caltech, NSF - $5M each Nov 2005 – NSF capital construction tasks complete short-term funding requested for salaries of staff required to complete systems integration CARMA Operations & Development – a distributed effort Cedar Flat – operations & outside observer support OVRO – hardware and software maintenance and support, receiver, correlator & software development RAL - hardware maintenance and support, receiver, correlator & WVR development UIUC – WVR development, development and maintenance of archive and pipeline imaging capability UMd – software maintenance and support, software development  Increased overall costs

Future Largely John Carpenter’s but I will add a slide from John Carlstrom with U Chicago role + science enabled

Backups

Current Graduate Students Berkeley Adam Leroy, Jonathan Swift, Evan Levine, Kristen Shapiro, Nia Imara Caltech Joanna Brown, Micol Christopher, Stuartt Corder, Melissa Enoch, Laura Hainline Illinois Paulo Cortes, Douglas Friedel, Sheryl Kuo, Woojin Kwon, Jerry Shaw, Shiya Wang Maryland Nicholas Chapman, Rahul Shetty, Misty Lavigne, Stephanie Zonak, Elyse Casper, Lisa Wei Chicago (SZA) Chris Greer, Ryan Hennessy, Michael Loh, Matthew Kyle Sharp

First Light Enhancements Better Site higher elevation, atmospheric transmission x 2 improvement improved phase stability year-round observing: routinely at 1 mm Hybrid array greater number of telescopes & baselines increased mm-wave imaging fidelity & dynamic range increased imaging speed – snapshot & mosaicing capabilities wide field mm-wave imaging on scales from 0.13  to 1 (with 8 x 3.5 m U Chicago SZA array to 3) Combined resources of partner universities broad science and technology base