Advertisements

April 29 and 30, 2004 Schneider Electric Solutions For Six Euro 2004 Soccer Stadiums.
EVD4 - The Smart eVolution Primary distribution circuit-breaker with integrated protection, control and sensors © ABB Group 15. April 2017 | Slide 1 1.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
INDUSTRIAL & SYSTEMS ENGINEERING
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Preliminary Studies of the Electric Power Distribution for CLIC
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Hands-on Networking Fundamentals
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
PowerIT Air Insulated Cubicle Uniswitch
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Utility Engineers, PC.  Generation  Transmission  Distribution.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
NERC Lessons Learned Summary LLs Published in September 2015.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
A second Thyristor Controlled Static Var Compensator for SPS
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Power Systems J. Sandberg July 2006 RHIC Retreat 2006.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
STATUS OF TELECOMMUNICATIONS SYSTEM AND O&M PRACTICES IN ELECTRIC POWER INDUSTRY OF SERBIA (EPS) Danilo Lalović, Senior Engineer for Telecommunications.
ELECTRICAL INSTRUMENTS ( service and utilization )
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
YETS & LS2 Works EN-EL / Power distribution
Situation of the Static Var Compensators at CERN.
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
the high-voltage network of CERN ToMORROW
the CERN Electrical network protection system
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS & LS2 Works EN-EL / Power distribution
F Duval, on behalf of EN/EL
Business opportunities related to CERN electrical network
Maintenance at ALBA facility: Strategy for the conventional services
F Duval, on behalf of EN/EL
Experimental Areas – LS2 planning
Global One Communications
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL

2 Main topics on consolidation 1.Repowering EL Group 2.Future of the network 3.Selectivity & protections 4.Cables 5.Substations 6.SPS Safety network (Diesel)

3 Repowering EL Group 48  65 people from end 2008 to MCHF consolidation budget Recruitment of experts (a few) Training newbies (many) Powering EL means & toolings (diagnostic equipment, network modeling software, maintenance software, organizing documentation, etc.) Renew 12 main EL contracts with suppliers (general installation, dry transformers, high voltage cubicles, low voltage cubicles, 48Vdc equipment, fiber optic installation, Scada development, high voltage cables, UPS, maintenance contracts, etc.) Looking for surfaces (workshops, heavy transformers, spare parts storage, offices….)

4 Future of the network An overall network study is under way Any renovation project run before having a precise idea of the 2020 network is a waste of money Main principles: Bring 66kV (close) to Meyrin Separate machine & stable network in Meyrin Simplify the network for an easier management Renovate ageing but vital nodes (ME9, ME59,...) Develop safety (Diesel) network

5 Selectivity & protections -Segregate protection features from network management functions -Update protection relays Main principles: Simple is reliable Rough standard solution is better than many “tailor made” solutions Develop fiber optic network for digital blocking selectivity Implement systematic cable “both sides” protection

6 Cables Develop diagnostic tools for preventive maintenance Manage & monitor screen current Evaluate cable installation method; direct in ground, in tubes or in galleries Evaluate cable technology (aluminum, copper; PIE, XLPE; 3 phase screened, one phase; etc.)

7 Substations Replace old cubicles by Arc proof cubicles Evaluate SF6/ Vacuum circuit breaker technologies Evaluate diagnostic accessories Modify some existing substations in order to respect installation rules Improve operability and local/remote supervision

8 SPS Safety Network Upgrade of the 3.3kV safety network for SPS and North Area Upgrade of the low-voltage safety substation in BA4 (for TI8, CNGS) and installation of a dedicated Diesel set Upgrade of the low-voltage safety substation in BA7 (for TI2) supplied from the 18 kV Meyrin safety network Create safety substations in North area for BA80, BA81, BA82 like done for SPS in

9 Done in 2009 Selectivity Coordination 66-18kV Analysis loop timing Tests selectivity BE Proposal for blocking between main substations

10 Done in 2009 Emergency connection: TI8/CNGS  SPS loop BA4

11 Done in 2009 CSAM + Surface Fiber network LHC Surface link consolidation: 60 km of optical fibre cables 2000 optical connections CSAM: 15 km of optical fibre cables 1000 optical connections Total project value: 2MCHF

12 Done in 2009 Selectivity improvement Doubled BE/BE9 link; 30MVA to 60MVA Installed emergency connection from TI8/CNGS power cable to SPS loop Purchased 10kM of 18kV cable for 2010 SPS cable consolidation plan; BA5 to BA6 CSAM fiber optic network + consolidation of LHC surface links; 2MCHF

13 To do in 2010 SPS loops renovation

14 To do in 2010 Selectivity Blocking fiber links New protection relays

15 To do in 2010 Safety network on SPS & NA Meyrin Diesel sets Diesel set BB kV SPS safety network 18 kV Meyrin safety network To SE0 ~ Options to study : Dedicated 3.3kV Diesel set in SE0 Dedicated 400 V Diesel sets in SE0, BA1, BA2, BA5. Studies for BA4 : upgrade of the low-voltage safety substation + dedicated Diesel set Studies for BA7 : upgrade of the low-voltage safety substation

16 To do in 2010 Study and finalize overall network evolution Renovate BA4 and BA5 substations Replace BA5 to BA6 cables Implement fiber optic network for digital blocking selectivity Implement new protection relays in some key points (66kV, etc.) Studies for a safety network on NA & SPS