Assessment of power grid elements technical condition using the example of a transformer State National Research Polytechnic University of Perm Anastasiia.

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

Quality Management in Diagnostic Imaging
© SDT North America 2003 All Rights Reserved Strategies for an effective ultrasound inspection program By: Allan Rienstra SDT North America www.sdtnorthamerica.com.
 Key role in planning and scheduling, makes it heart of maintenance and engineering program  Primarily responsible For planning and scheduling all aircraft.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
PSE&G Condition-Based Maintenance
VSE Corporation Proprietary Information
Seismic Considerations & Power Bushings
CHAPTER 1. MAINTENANCE “Act of causing to continue ” [New Oxford Dictionary]
DECLERCQ Jan BE Alpha 4 – Block 2 Barcelona May TRANSFORMERS FOR WIND TURBINES NEED FOR NEW DESIGNS OR BUSINESS AS USUAL Dr. Jan Declercq.
Computer Related Issues IC3 Chapter 5 Computer Fundamentals.
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
3-1 Select Measures Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process Capability.
Vestas.com Condition Based Maintenance of Vestas Offshore Turbines European Offshore Wind Conference & Exhibition 2009, Stockholm Jacob Juhl Christensen,
High Voltage Insulation Diagnostics
AUTOMATIC CONTROL SYSTEM FOR VOLTAGE AND REACTIVE POWER REGULATION IN ACTIVE-ADAPTIVE GRID OF POWER CLUSTER “ELGAUGOL” Alexander Voloshin Ph.D., LYSIS.
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
Business Process Performance Prediction on a Tracked Simulation Model Andrei Solomon, Marin Litoiu– York University.
RAO “UES of Russia” Action Plan on Reliability Improvement of Unified Power System of Russia August 29, 2005.
© 2005 PRS S.A. Isolated electric power systems reliability and efficiency improvement based on electric power quality monitoring and control Project supervisor:
ea technology Effective Condition Assessment of MV Switchgear
Prepared by: Marimuthu Gurusamy Combined vibration analysis (velocity and acceleration envelope) for Prediction of rotating equipment (with rolling element.
TWENTIES : EU project Massive integration of renewable T&D Smartgrids How cable dynamics may help ? ISCD Shanghai- October 18th, 2011 J ean-Louis.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
Real-time Observation Monitoring and Analysis Network Haihe LIANG, etc. TECO-2008.
NPC Ruspromremont Saint-Petersburg 2011 Energy-saving – Reliability Enviromental Protection.
Conditioned-Based Maintenance
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Paul Dyer Condition Criticality Risk Rating and Condition Monitoring in a Distribution Network PAUL DYER DAVE OPENSHAW London Electricity Group.
Life cycle services for automation products
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
Virtual Analyser What is it Have you ever faced an analyser failure that requires a plant shut down to repair & wished that there.
Utility Engineers, PC.  Generation  Transmission  Distribution.
DESIGNING FOR COMPREHENSIVE SUPPORT THOMAS L. NONDORF THE BOEING COMPANY Oct. 22, 2003
Optimization of Maintenance Strategy for Electrical Power Devices at Risk and Uncertainty Optimization of Maintenance Strategy for Electrical Power Devices.
Submitted to: Submitted by:
Management Concepts. Definition of administration It is the process concerned with determining goals, objectives, policies and plans for which the organization.
Internship Report Adrian urcanu Third Consortium Meeting.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
The main function of a business is to produce goods and services which are desired by their customers.
Data Analysis in the Energy Monitoring System Georgii Mikriukov 1 Perm National Research Polytechnic University Electrical.
The article written by Boyarshinova Vera Scientific adviser: Eltyshev Denis THE USE OF NEURO-FUZZY MODELS FOR INTEGRATED ASSESSMENT OF THE CONDITIONS OF.
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
GENERATORS A Large Piece of Equipment That Gets Ignored!
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
Standard IP Solutions - Call us Now at or Toll Free
Heating Maintenance and Repair
Accuracy, sensitivity and specificity analysis
Maintenance strategies
Negative and Fractional Indices bingo
Performance indicators Unplanned unavailability
Planning Actual execution of maintenance & upgrade
SUMPNER’S TEST OF TRANSFORMERS
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Accuracy, sensitivity and specificity analysis
5.08 ASSET MANAGEMENT AND DECISION SUPPORT IN A COST-CUTTING REGIME
التحكم في استخدام المصادر
دانشگاه شهیدرجایی تهران
Harsh Environment Power Conditioning Voltage Regulator
تعهدات مشتری در کنوانسیون بیع بین المللی
Title slide Your name.
Outdoor Power Conditioning Voltage Regulator
Indoor Power Conditioning Voltage Regulator
Outdoor Power Conditioning Voltage Regulator
Harsh Environment Power Conditioning Voltage Regulator
In ABB AbilityTM Electrical Distribution Control System (EDCS)
Indoor Power Conditioning Voltage Regulator
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Making the right business decisions is essential for any company.
Presentation transcript:

Assessment of power grid elements technical condition using the example of a transformer State National Research Polytechnic University of Perm Anastasiia Suslova

Objectives The aim is to develop diagnostic algorithmic support of electrical equipment, which allows: –Follow up the technical condition level of the electrical equipment promptly and accurately; –Predict changes in the technical condition level of electrical equipment; –Influence the technical condition level of electrical equipment to maintain it at a specified value.

Reliability centered maintenance

Algorithm for power equipment diagnosing Start Key factors define Design of experiment (full factorial design, fractional factorial design) 1 Equipment monitoring, parameters measurement in accordance with experiment design Developing a model 2 1 End 2 Acceptable reliability level ? Making decision on equipment repair or replacement No Yes

Factors influencing transformer reliability - oil level in the tank (m), - temperature of the upper layers of oil (° C), - indicator silica gel condition, - heating of contacts (° C), - vibration (Hz), - level of voltage (kV).

Factors levels

Matrix for fractional factorial experiment

Linear model of a transformer

Technical condition level

Results The suggested algorithm allows to solve main tasks of diagnostics assessment of the actual power equipment condition; deciding if the operation and repairs performed are correct; forecasting technical condition; define what repairs should be done; maintaining specified reliability level; reducing maintenance and repair costs.

Thank you for your attention!