Round 1 Debrief - AM What worked? What didn’t work? – Inspection standards missing – Rework missing proper tooling – Bottleneck at inspection – Shipping.

Slides:



Advertisements
Similar presentations
WORK INSTRUCTIONS – Supervisor You deliver production orders to the Kitter. You motivate. If something is wrong. Find the culprit. Then motivate some more.
Advertisements

Lean Manufacturing.
A Brief Introduction to Lean Concepts for the Office Bill Motley, CEM, CQMgr, PMP Program Director, Production, Quality & Manufacturing Curricula Development.
Yellow Belt Training Kaizen Concepts
1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Vandal Boat Factory Simulation
LeanSigma ® Facilitator Training Module 9 – Just in Time.
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
Case Study 6: Concentrate Line at Florida Citrus Company
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Lean Operations (JIT) Module
Lean Operations (JIT) Module
Operations Management Just-in-Time Systems Supplement 12
Just-In-Time “Eliminate Waste”.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
Summary: Review of Lean Principles
Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping.
JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental to operations management: eliminate.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
CONTINUOUS IMPROVEMENT PROGRAM
Operations Management
Welcome to the Lego Widget Flow Factory!
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
ISQA 459 Mellie Pullman 1.  JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories.
IntelliTrack ® WMS An Overview and Approach Powerful, Full Featured, Affordable.
Six Sigma Simplicity 1 Facilitator Notes for Simulation.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Supply Chain Doctors The Supply Chain Doctors Supply Chain Management Kimball Bullington, Ph.D.
Just-In-Time & Lean Systems
Lean Basics Dewey Warden.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
JIT and Lean Operations
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
Just-in-Time and Lean Systems
CAD CAM CADMAT A2 Graphics. CADMAT We will look at … We will look at … CADMAT CADMAT –Computer aided design, manufacture and Testing PDM PDM –Project.
POUS Point Of Use Storage. Agenda POUS AGENDA »Introduction and definition Agenda | »Why / Benefits »Examples »When to Use, Not to Use »How to Implement.
C Learning Objectives Power Notes 1.Just-in-Time Principles 2.Applying a Just-in-Time Approach 3.Accounting for Just-in-Time Operations 4.Accounting.
“Without the Cost of Waste …”
Copyright © Six Sigma Academy International LLC All Rights Reserved Credit Card Case Study – Round Three The Dot Simulation… An Illustration.
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
APICS is not responsible for statements or opinions expressed by individuals in its publications or at its meetings. The views expressed are solely those.
The Lean Enterprise Push versus Pull Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Purpose: To help demonstrate the lean principles Time: 1 hour Airplane Exercise.
EMBA-2, BUP EO Just-in-Time / Lean Production.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Kanban. What is Kanban Kanban means many things. Literally, Kanban is a Japanese word that means "visual card". At Toyota, Kanban is the term used for.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Round 1 Debrief - AM What worked? Thorough inspection process Kitter and production scheduler always on time What didn’t work? Bubba wasn’t available to.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Mel Wendell – Mountain Pointe High School
Introduction to Value Stream Mapping & Management
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Chapter 27 Cost Management for Just-in-Time Environments
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
A Brief Introduction to Lean Concepts for the Office
Consulting environment Keystone overview Small firm versus big firm
Inspection Process So Hang Mak Sarah Cruz Metin Oruc Eugenia Vadhera
Pull Production/ Just In Time
Kanban Production Just in time Systems
Chap 10 Learning Objectives
Round 1 Debrief - PM What worked? What didn’t work?
Manufacturing Planning
Round 1 Debrief - PM What worked? What didn’t work?
Value Stream Mapping ASQ March 2018.
Round 1 Debrief - PM What worked? What didn’t work?
Manufacturing Production Planning
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Presentation transcript:

Round 1 Debrief - AM What worked? What didn’t work? – Inspection standards missing – Rework missing proper tooling – Bottleneck at inspection – Shipping is a bottleneck – Layout is inefficient – Need some line-balancing, leads to poor quality – Sail forming difficult, need training – Production schedule vs. sales, production schedule imbalance – Boxes need to return to shipping – Inventory….Do we need that much? – Fail individual batches

Changes for Round 2 Consider the following: – Factory Layout Put tables in a line, eliminate WIP locations Eliminate bubba? Re-assign to real work! Other? – Point of Use Storage (POUS) Batches? Store paper at folding – Line Balancing How many folders do we need? 3? 4? Flexing work Split fold 2 into 2 operations Combine stamping and oven Training for stamping – Poke-Yoke, Quality at the Source Sail height Stamp location (centering)

Round 2 Debrief - AM What worked? What didn’t work? – Better! – Excess employees. Optimize. – Still too much work in folding? – STOP PUSHING!?!?!?!?! – FLEX work? – Self inspection? Inspection during the process?

Changes for Round 3 Consider the following: – Factory Layout – Pull System, Kanban Pacemaker process? Shipping Kanban size? – Continuous Flow and Supermarkets Supermarkets before and after oven? Folding and stamping into continuout flow Fire production scheduler – Poke-Yoke, Quality at the Source Inspection along the way Sail height – can be reworked Stamp centering

Round 3 Debrief - AM What worked? What didn’t work? – Final Kanban = 4 worked well – Continuous flow and flex (minimal flexing) – Some flexing in first folding op – Inspector helping with oven batching – Folding much improved Areas for improvement? – Need more sales to make money – 1 hour day sales forecast