1. QualityControl QualityManagement Before 92 92 even today Standard: CSA Z 299.1 Examples Petrobrás Dow Química Beginning: October 1992 ISO 9001 BVQI.

Slides:



Advertisements
Similar presentations
Building a Cradle-to-Grave Approach with Your Design Documentation and Data Denise D. Dion, EduQuest, Inc. and Gina To, Breathe Technologies, Inc.
Advertisements

ASPRS 2005 Annual Conference, Baltimore, Maryland Camera Calibration, Characterization and Contracting Guidelines: An Quality Assurance Perspective U.S.
Medical Device Software Development
Sorenson Medical, West Jordan, Utah USA Medical Device Development Robert Hitchcock, Ph.D. Director of Engineering & Technology Development Sorenson Medical,
REGULATIONS for SUPPLIES, EQUIPMENT, REAGENTS and TESTING JILL HOAG BS, SBB(ASCP) CQA(ASQ) AABB STAFF LEAD ASSESSOR 1.
EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical.
ISO in Histopathology Louise O’Callaghan MSc FAMLS
ISO 9001 : 2000.
Combining Product Risk Management & Design Controls
Quality Management System
Chapter 6 Total Quality Management Chapter Outline Quality imperative.
Implementing a Quality Management System
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
Welcome ISO9001:2000 Foundation Workshop.
Prototype & Design Computer Inputs. How to Prototype & Design Computer Inputs Step 1: Review Input Requirements Step 2: Select the GUI Controls Step 3:
ISO/IEC A review of the new standard for laboratory accreditation
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Receiving Inspection Process for Components and Finished.
Prof. Moustafa M. Mohamed Vice dean Faculty of Allied Medical Science Pharos University in Alexandria Development and Regulation of Medical Products (MEDR-101)
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
© 2002 Systex Services1 ISO 9000:2000 OUTLINE Quality Management System.
From Research Prototype to Production
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Visit us at E mail: Tele:
Pilot Project Report PENNSYLVANIA ASPHALT IMPROVEMENT NETWORK (PASIN)
Supplier Maintenance and Development
Development and Regulation of Medical Products (MEDR-101)
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
G. Dal Maso 1 Complaint Handling. 2 Technical Support Production Area Reagents Finished Product Bioreagents Technical Support Moulding.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
QUALITY. QUALIDOC Web site: Telephone: 44+ (0) JEAN WHITE.
5.4 Quality Assurance Chapter 33. What is a quality product? A good or service that meets customers’ expectations and is “fit for purpose”. A good or.
PNOs-Suppliers Technical Interfaces Heidelberg, 3 March 1998 Telecom Italia Supplier Qualification and Monitoring 1 TELECOM ITALIA SUPPLIER QUALIFICATION.
NASA Quality Leadership Forum: Supply Chain Management Case Study Ken Ortiz/Alphaport, Inc. net-inspect ™
Multidisciplinary Team-Based Design Education to Create Biomedical Engineering Innovators Jay R. Goldberg, PhD, PE BMEidea Meeting October 12, 2011.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Joel Gerber Zachary Reaver Kurt Schilling.  Provides physical proof of development  Maintains product design knowledge base  Meets government and corporate.
TD/MSD REVIEW CHARGE AND AGENDA Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
Product development Engineering & Regulatory Raj Agrawal InnAccel.
Chapter 19 Manufacturing and Quality Control
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
November 6, 2013 Purchasing Controls & Supplier Quality Best Practices Beyond Compliance for the Medical Device Industry AdvaMed 2013 Bernie Liebler Technology.
Quality Management: Mutually beneficial supplier relationships.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
PRODUCT VERIFICATION Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Medical Device Software Development
ANNUAL PRODUCT REVIEW Patchara Kootiratrakarn Independent consultant.
ISO An introduction Part 3
Trigger or Starting Point
Awareness program on ISO/TS16949:2002
UNIT V QUALITY SYSTEMS.
Level - 3 Process Areas (CMMI-DEV)
جمهورية مصر العربية المركز القومي للبحوث التربوية والتنمية مركز معلومات و التوثيق و دعم اتخاذا القرار.
CUSTOMER 4.0 Quality Management System 5.0 Management responsibility
ISO An introduction Part 3
Trigger or Starting Point
Customers Customers Input Output Product
First Article Inspection
ISO 9001:2000 Management System Overview
Work Unit AIK 11.2 CDR of the CDS-SL Quality
Presentation transcript:

1

QualityControl QualityManagement Before even today Standard: CSA Z Examples Petrobrás Dow Química Beginning: October 1992 ISO 9001 BVQI – Bureau Veritas Quality International Certificate recognized by international organ 2003 New version ISO Evolution of the quality management system in Smar

QC Receiving Inspection Plan Sampling Plan Supplier Feed Back QC Factory: inspections and tests of components Electronic: PCB tests and inspectons Customer Feed Back ( CCM ) Final QC Inspection Plan Technical Support Smar - Quality Management System Design

Development Phase Development DocumentsEvolution Product Definition PGD - General Development Plan DRE - Input Requirements Document RHP - Project History Record Ideas Planning DPL - Project Planning Document Specifications Sudies Development Procedure defining the development procedures Follow-up, interface and Critical Analysis Meeting minutes Project Verifications records Prototype manufacturing Project Validation DRS - Output Results Document Technical report Prototype test Transference CI - Internal communication Test procedures and / or assembling / manufacturing minutes Product manufacturing Project Alterations ALT - Technical AlterationsProduct

Purchasing

Manufacturing Sequence and Interaction of Processes Electronic and device Assembly Visual Inspection Final Assembly Functional Test Electronic and device quality control

Functional Test – Quality Index 99,89%

Inspection and Testing

Sampling plan: 100% Control of monitoring and measuring devices. Human Resources: 2 Seniors engineers and 8 technicians Participation in the corrective action system. Records of the results of inspection and testing. Features

Identification and Traceability

Director Technical Service National & International Support & Administration / / Engineers and Technicians Live Chat Support via WEB Service Center Technical Partners Technical Support Channel InsttalationNational & International Technical Service SP Office Technical Service Northwest Office 24 hr Desk Phone: (5516)

Customer Complaints

Responsability : Quality Engineer Staff

TechSupport

Identification and Traceability Recall Quality Department Collect data Review Customer