Elements of E-Waste Processing Facility Our proposed facility (Figure 4) will house several mechanical components including: A feeding container for storing.

Slides:



Advertisements
Similar presentations
Introduction to Chemical Engineering(II) Department of Chemical and Biomolecular Engineering Sogang University Kee-Kahb Koo.
Advertisements

McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 16 Other Supply Responsibilities.
Safe, Secure, Economic, & Environmentally Sound Electronics Recycling Joe Clayton Synergy Recycling, LLC
Chapter 24 Solid and Hazardous Wastes
Melissa Cadwell SU Sustainability Division. SU Overview Large Can be 24,000 people on campus Private 4-year, graduate, professional degrees Urban Highly.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Solid Waste and Recycling
Mountain of Trash: Are They Sustainable
What is a Product Life Cycle?
GENERAL IDEAS IN AIR POLLUTION CONTROL
WASTE AUDITING 101. What Direction Are You Going?
GLASS vs. PLASTIC Which is better for the beverage industry?
„Business opportunities in waste treatment” Conference -Tel Aviv
Society depends on clean and safe water.
Eric Dycus Jan Halvorsen Catherine Nguyen Helen Vesser
KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP2 Industrialization activities Development of an automated production system Start-up of a new.
SOLID WASTE MANAGEMENT
WHAT A WASTE..!!!. E-WASTE FACTS E-waste or electronic wastes are Broadly described as loosely discarded, surplus, obsolete, broken, electrical or electronic.
Management of solid waste Individually, come up with some management strategies for dealing with SDW. HINT. Think about the different stages on your diagram.
THE COMPLEXITY OF THE E-WASTE PROBLEM
Municipal Waste Statistics in Belarus. The owner of municipal waste statistics in Belarus is the Ministry of Housing and Utilities.
Damien O’Brien Paper by: Barbara K. Reck* and T. E. Graedel Center for Industrial Ecology, School of Forestry and Environmental Studies, Yale.
The District School Board of Collier County Recycling Program.
Environmental Resources Unit A Understanding Recycling and its Relationship to the Environment.
By Mara and Claire. What is E-waste? E-waste (electronic waste) comes in many forms and is generated by business’s growing electronic needs. E-waste embraces.
Division of Pollution Prevention and Environmental Assistance Industrial Assistance Section John Burke
Environmental issues in food manufacturing and packaging.
Logo L u c k y P e n n y The presentation will begin shortly…
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
A Cleaner Production Project in the South African Paper Industry – Lessons learnt Iain Kerr, MSc (Env. Biotech.) University of KwaZulu Natal, School of.
WasteSection 3 Section 3: Hazardous Waste Preview Bellringer Objectives Types of Hazardous Waste Resource Conservation and Recovery Act The Superfund Act.
Recycling Energy and waste management. Types of recycling  Closed loop recycling: plastic bottles becoming new plastic bottles; when the material collected.
Chapter 18 The Disposable Decades - 50s-90s 1. Disposable Life Style - Use once and throw away 2. Convenience became necessity 3. Results – some areas.
How Coal Is Formed Coal, the most plentifully produced fossil fuel in the United States, is a sedimentary rock made up primarily of carbon and hydrocarbons.
GRADE 9 CANADIAN GEOGRAPHY
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
WASTE... By Amanda Buckley. What is Waste Management?  Waste management is the collection, transport, processing, recycling or disposal and monitoring.
Renewable & Nonrenewable Resources Lesson 2.4: “Solid Waste Management”
Recycling involves processing used materials into new products in order to  prevent waste of potentially useful materials  reduce the consumption of.
THE EFFECTS OF ELECTRONIC WASTE BY: ANVITA GUPTA 7-1.
WasteSection 3 Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. They may be solids,
Solid Domestic Waste By: Laya Bataineh & Yousser Louhaichi.
WasteSection 1 Classroom Catalyst. WasteSection 1 Objectives Name one characteristic that makes a material biodegradable. Identify two types of solid.
Environmental Impact of ICT Year 11 Mr Conti. New for Old There is hardly any technology that changes as often as ICT devices. For example: Mobile Phones.
Hazardous Waste Environmental Science Chapter 19 Section 3.
Solid Domestic Waste. What have you thrown away this weekend? Make a list of all the items that you personally have thrown away this weekend Add items.
Liquid Fluoride Thorium Reactors. Overview Introduction to nuclear reactors Fundamentals of LFTR (Liquid Fluoride Thorium Reactors) Economic viability.
5 th ITU Green Standards Week Nassau, The Bahamas December 2015 From Waste to Wealth the Mobile Phone Partnership Initiative – Getting the ICT Sector.
Engineering Disciplines Get out your notes:. Learning Objectives Be able to describe several different engineering fields –General Description –Specific.
I. Solid WasteSolid Waste Chapter 19 Section 1. Classroom Catalyst.
Good for You! Good for the Environment! Tel: | | IN PARTNERSHIP WITH holisticESSENCE.
Lead Pipe Disposal. Overview Background and Project Requirements Top 5 Designs Detailed Final Design Social and Environmental Factors Testing of Design.
Sustainable development electronic waste B101, The technology context Coursework
Product life cycle and the three R’s. The manufacturer wants the toy to be as environmentally friendly as possible. Describe how the manufacturer can.
TESC 211 The Science of Environmental Sustainability Autumn Quarter 2011 UWT.
WASTE Solid Waste. Objectives Name one characteristic that makes a material biodegradable. Name one characteristic that makes a material biodegradable.
Content 1.The main flowchart and technology 2.Advantage and disadvantages of each technology, way to improve. On-Nuch disposal site Group Member: Lu Li.
PRESENTER Company Meeting Title HOW DOES RECYCLING HELP THE ENVIRONMENT.
Is the price of the vehicle effected?. Tesla’s Recycling Scheme Tesla currently has not implemented its recycling scheme due to the lifetime of the batteries.
End-of-life opportunities for computers and computer parts EOL: It is a product life circle terminology that is used to signify that a product has reach.
Fort Stanwix National Monument Energy Audit Contract
Feasibility Study for Thermoforming Production Plant
Powdered Milk Plant Design
Classroom Catalyst.
Supply Chain Management (SCM) Green and Reverse Logistics
Key Issue 2: Why Do Industries Have Different Distributions?
Quality Standards Fresh water can contain a variety of harmful substances and organisms. Concentration refers to the amount of substance that is in another.
Main Objectives of This Secession
Bonnie Carr Josh Stowell Laura Ruhwedel Michelle Sorci Harold Griffey
Management of solid waste
Presentation transcript:

Elements of E-Waste Processing Facility Our proposed facility (Figure 4) will house several mechanical components including: A feeding container for storing waste Conveyors for transporting waste Scaffoldings to provide pathways for our employees Chemical vats for separation of material Electromagnets to filter ferrous metals Grinders to pulverize metals/plastics Granulators to further process shredded materials Hoppers for containing materials Air filtration and ventilation system Gravity tables for final separation A controller to regulate nitrogen concentration in the environment and to regulate temperature Purpose and Scope There are many valuable metals inside electronics such as copper, nickel, gold, tungsten, steel and aluminum. There is also a market for the miscellaneous glass and plastic materials left over from the recycling process. It is feasible to generate a profit from recycling these devices, provided that it is done in an efficient manner. We will be partnering with collection facilities, such as charities and non-profits, to obtain the end of life electronic devices. Our collection team will transport the devices to our facility where working components will be re-claimed and sold. The remaining waste is sent to our first conveyor system where recyclable materials are separated. Plastics and metals are sent to our processing system where they are ground, separated, and filtered. The particulates are then sold to smelting centers and plastic vendors. Figure 4: CAD rendering of our proposed facility Collection of Components Transportation will be provided by our recycling facility in order to encourage business relations with collection centers such as dump sites. Our transportation services will increase profit margins to our collection partners, which will increase the volume of materials received by the recycling facility. Collection will require a sizable amount of transportation equipment. We will require semi- trailer trucks and employees licensed to operate the vehicles. Employees will also be required to load and organize incoming and outgoing materials. (Figure 3) Initially the number of collection centers available to us will limit our collection process. As time progresses, we will be able to accumulate additional partners to increase the volume of processed material. Once we establish a sufficient number of partners, we intent to only collect from waste disposal facilities once a month depending on the number of collection centers available to us. This allows us to keep our employee count low and to ensure regular service with our partners - the worry being that if we commit to collecting waste more often than once a month, we may not be able to keep up with that commitment. As time goes on, we expect to increase the frequency of our pickups to as often as possible. Figure 3: E-waste packaged onto palettes Assembly Lines Our factory will have two assembly lines. The Inspection line will inspect computers for usability. Obsolete or unusable computers will be put in queue for the recycling line. Computers that are not visibly broken or outdated will undergo further testing. The other line will perform the actual recycling of plastic and metals. The end product will be finely ground materials separated through magnetic screening and air jets. The magnetic screening separates ferrous metals from non-ferrous metals and plastics. The air jet process varies air pressure to lift materials of different densities (plastics and metals). Because this air jet process is hard to contain we will also be using air filter systems to prevent inhalation of the finely ground materials. Processing of Raw Materials For our grinding method, we would like to use cryogenic fine grinding technology. (Figure 5) By using this method we will be able to produce finely ground materials at a size of about 200 microns. This is possible by cryogenically freezing the particles using liquid nitrogen. When the raw materials are at temperatures below their glass transition state they will be brittle enough to break into particles 100s of microns in diameter. A special grinding machine will be used to regulate temperature and use nitrogen to stabilize the environment. The benefits of this method are: smaller particle sizes, more uniform particle size distribution, efficient processing, process temperature control, and stable inertness. Commonly when E-Waste is not recycled, they are either incinerated or dumped into landfills. Both of these disposal techniques have negative environmental impacts. Incineration releases carcinogens into the atmosphere such as polybrominated dibenzodioxins. When the E-Waste is dumped into landfills heavy metals leak into the ground water such as lead, beryllium, mercury & cadium. Exposure is known to cause neurological damage. The Problem As technology advances the world is faced with the problem of electronic waste disposal. Up to 80% of the population in the U.S. owns a computer. These computers are estimated to reach their end of life within 3-5 years, and only 18% of the E-Waste in the U.S. is recycled. That means that of the 49 million computers discarded annually, only 10 million of those are recycled, and the remainder is disposed of in ways that are detrimental to neighboring populations and the environment. Metal and plastic are non-renewable resources that are continually increasing in demand. Every computer that is not recycled drives up the demand for these materials and increases the cost to the consumer. If the materials were instead reclaimed then a large potential profit could be gained. Figure 1 depicts the amount of resources that could be reclaimed every year and also shows the size of the market pool for a recycling facility. Figure 5: Cryogenic grinding system The size of these particles will be perfect for recycling plants. The plants will use these particles for reformulating and reincorporating into products. This process is generally done through a molding process. Other plants will also be able to use the raw materials in extrusion techniques to make new products as well. Time and Cost We expect our facility to take approximately 2 years to complete. If we start construction immediately, we believe we can begin operations in December of Much of this time (approximately a year) will be devoted solely to construction of the facility, with preparation and staffing of the facility taking approximately six months each. As shown in the figure to the right, we estimate that our facility will cost approximately $20 million dollars to complete, including salaries for the first year of operation. Costs here are estimated based off projects of similar size and magnitude, as well as construction quotes from several companies specializing in facility construction. Employee salaries and benefits are based off of a small, 50-person staff during the first year of operation. Once operational, we estimate that our facility will generate approximately $2.5 million in profit a year. We expect to repay investors within 15 years (and provide returns on investment within 20). yogenics/RubberAndPlastics/grinding.html Figure 6: Analysis of cost Who We Are David Li, a student in the mechanical engineering department at the University of Washington specializing in control systems (mechatronics). He will be able to manage the assembly lines to maintain efficiency and prevent downtimes. His experience with designing parts and managing projects will help with implementing the facility. Overseeing the contracting work will be James Truitt. His internship experience at TearLab, a start-up biotech company based out of San Diego, peaked his interest in electronics waste recycling due to the large amount of microfluidic chips and plastic components that had to be thrown away during the in-office testing of the device. John Willey, a student with a degree in Chemical Engineering with a specialization in nanoscience (ideal for milling small particles and theory of colloidal separation). He will be operating the plant as a process/plant/maintenance engineer. He has practical hands on experience in manufacturing settings from working at Boeing for 3 months, at one of the largest fabrication facilities in the North West. Wayne Gerard, a student graduating with a B.S. in Computer Engineering and a B.A. in Chemistry. He will assist with both the electrical testing process and the extraction process. He has worked before in several high-end research labs, though admittedly Biological Science research labs, but which included working with electrical equipment and circuitry design. References Figure 1- Constructed with data courtesy of the EPA & London Metal Exchange Figure 2- Figure 3 – Figure Figure Figure 1: Electronic waste in the U.S. & reclaimable material from computers Figure 2: E-Waste littered suburb in Ghana’s capital Accra