GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Advertisements

GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 1 GLAST Large Area Telescope: Calorimeter (CAL) Subsystem.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
From Research Prototype to Production
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Process Control during Wafer Design and Production.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
PIONEERING WITH PASSION ©Tesat-Spacecom GmbH & Co.KG PIONEERING WITH PASSION PROPRIETARY INFORMATION ©Tesat-Spacecom GmbH & Co.KG reserves all rights.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope:
Bill Raynor Naval Research Lab
EFW DFB Systems Assurance
EFW DFB Systems Assurance
GLAST Large Area Telescope:
THEMIS Mission Assurance
ISUAL Product Assurance
University of California - Berkeley
Peer Review Agenda (Suggested).
GLAST Large Area Telescope
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Introduction and Overview
Presentation transcript:

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray Large Area Space Telescope Electronics, Data Acquisition & Instrument Flight Software Peer Critical Design Review March 19-20, 2003 Nick Virmani Naval Research Lab, Washington DC DAQ EEE Parts Manager (202)

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 2 Outline EEE Parts Requirements EEE Part Implementation Plan EEE Parts Status Plastic Encapsulated Microcircuits (PEMs) Process Flow Chart for ASICs Process Flow Chart for PEM screening EEE Parts Concerns Radiation Testing Radiation Testing Results

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 3 EEE Parts Requirements Requirements Summary –Parts screening and qualification per GSFC 311-INST-001, Level 2, –Additional requirements outlined in the LAT EEE parts program control plan, LAT-MD –Review and approve EEE Part Lists. –Derate EEE Parts per PPL-21 Review and approve derating information before drawing sign-offs. –Perform stress analysis –Parts Control Board (PCB) Approach, a partnership arrangement with NASA/GSFC parts engineer and code 562. Part lists are reviewed and approved by the project PCB prior to flight procurements.

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 4 DAQ EEE Parts Approval Plan DAQ parts approval process –Parts of DAQ boards are submitted combined, by LAT, into lists organized by part types (C, R, IC, connector, etc) Contain all parts requested to be used by DAQ engineers –This parts list has been reviewed by the PCB –Second step is to link the approved parts back to the individual assemblies by the LAT (in progress) –Submission of assembly parts-lists containing already approved parts (before CDR) –Advantage is that engineers use as many common and approved parts as possible

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 5 EEE Parts Status Resistor – total 93 types of resistors submitted –91 approved –2 not approved and require additional screening and testing. Capacitor – total 70 types of capacitors submitted –45 approved –4 require a part number change –14 are approved with remarks for special procurement clauses –7 not approved (won’t be used) Discrete Components – total 18 types of discrete components submitted –8 approved –10 not approved, suggested MIL spec part numbers for commercial parts.

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 6 EEE Parts Status Integrated Circuit – total 33 types of ICs submitted –15 approved –18 not approved yet Connectors – total 17 types of connectors submitted –6 approved –11 require additional screening and qualification as per 311-INST-001. Actel FPGA’s – total 2 types (54SXA32, 54SXA72) –Approval in progress

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 7 EEE Parts Status Discussing EEE parts availability weekly, to support fabrication schedule which includes: –Call manufacturers and suppliers to expedite delivery as required. –Work with test facilities to expedite delivery schedule. Requires performing 100% incoming inspection. Stress analysis of all parts on the parts lists yet to be performed. This will be performed after final selection of part types for the required application on the PWB assembly. Perform screening and qualification tests as required. Held regular meeting with GSFC Parts Engineer to resolve any parts-related issues and approve parts though the Parts Control Board (PCB). Attribute data for screening and lot specific qualification/QCI data shall be reviewed for acceptance of parts for flight. Parts Identification List (PIL) and As-built parts lists is maintained after final selection of parts for PWB assemblies.

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 8 Plastic Encapsulated Microcircuits (PEMs) (Packaged parts, ASICs, ADC, DAC) Total 5 types of PEMs used on DAQ boards. ASICs are fabricated using Agilent processes and packaged by ASAT Hong Kong (QML approved) will be tested, screened, and qualified by SLAC. ADC and DAC are manufactured by Maxim from a single wafer and assembly lot and parts are fully tested, screened and qualified prior to receipt at SLAC by NRL. PEM parts will be sample screened (min. 10% of lot size, lot size to be greater than 200 pieces) which includes temperature cycle, initial electrical parameters, dynamic burn-in, final electrical tests which includes static test at +25 degrees C, dynamic and functional at +25 degrees C, and switching test at +25 degrees C, CSAM, and final visual. Screening data shall be reviewed for use of balance quantity on the lot for flight applications.

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 9 Plastic Encapsulated Microcircuits (PEMs) (Packaged parts, ASICs, ADC, DAC) Each screened PEM type will be qual tested which includes DPA, preconditioning, temperature cycling, HAST, CSAM, and electrical test. Assembled PWB will be subjected to environmental stress screening (ESS) prior to conformal coating, which includes thermal cycling, dynamic burn-in at –30 degrees C to + 85 degrees C, and 100% visual inspection. All parts will be handled using ESD precautions and will be stored in nitrogen cabinets.

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 10 Process Flow Chart for ASICs (3 Types) WAFERS RECEIVE FROM MOSIS USING AGILENT PROCESS INSPECTION WAFER MOUNT PROCEDURE WAFER SAW PROCEDURE OPTICAL QC GATE 2 ND OPTICAL INSPECTION DIE ATTACH ADHESION CONTROL MONITORS LEAD FRAME SELECTION DIE ATTACH CURE WIREBONDWIREBOND MONITOR 3 RD OPTICAL QC GATE DIE ATTACH MONITOR 3 RD OPTICAL INSPECTION MOLDING Scanning Electron Microscope (SEM) Inspection

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 11 Process Flow Chart for ASICs (3 Types) Molding Compound Molding Molding Monitor Post Mold Cure Trim Monitor Mark Monitor Mark CurePlating Plating Monitor Strip Visual Trays / Tubes Form Monitor Final Inspection QA Scan Buy-off Lead Scan Dry Bake Final Visual QC Gate InspectionPack Packing Material Ship to testing facility (NRL/subcontractor) for testing CSAM 20 pcs. from lot Decision for acceptance

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 12 PEM (ASICs, ADC, DAC) Screening Flow Single Wafer Lot and Single Manufacturing Lot CSAM from sample lot 20 samples for each part type Prepare test fixtures for burn-in, prepare test programs and verify the functionality of burn- in boards for 10% screening of parts 100% Thermal cycle -30 degrees C to 125 degrees C (20 cycles) unpowered 100% Functional test at room temperature Select samples 10% from this lot and store 90% in N2 purge control room after baking Radiograph (20 pieces) 100% Receiving Inspection LAT instrument requirement Qual –30 degrees C to +50 degrees C, acceptance -20 to 40 degrees C, operational +25 degrees C, Radiation testing TID – 4.5K, SEE immune LET > 37 mev/mg/cm2, Humidity Control 30 to 45%, and 100% GSFC Parts Branch Involvement. 100% screening on 10% of lot size. Lot size should be > 200 pieces, otherwise perform screening on the entire lot. Destructive Physical Analysis. Sample includes radiography Burn-in 168 hours for 10% part at 100 degrees C but do not exceed junction temp. 100% Functional Test and PDA not to exceed 5% Parts Control Board (PCB) to make decision to use the balance of part i.e., 90% of the parts on the basis of test data review In parallel, select parts from 10% screened lot for qual. of parts and follow qual. plan, review results when testing is complete

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 13 PEM (ASICs, ADC, DAC) Screening Flow Single Wafer Lot and Single Manufacturing Lot Survey and select flight qualified assembly house, profile reflow machine and prepare sample flight board. Check the board using test program from previous step Prior to assembly, verify 100% integrity of fight board and test program, which will be used for testing of assembled board, run verification test on sample assembled boards Assemble flight boards using proven and approved methods. Mandatory inspection points during assembly 100% Inspection of assembled boards 100% electrical verification of flight board using qualified test program 100%, Thermal cycle -30  C to 85  C on assembled boards, unpowered 100% Visual Inspection Bake 90% flight parts and bag parts in nitrogen purge bags, (only if any of the bags were opened) Bake 10% screened parts and bag parts in nitrogen purge bags. These parts will be used for rework, repair of assembled boards and for spares only 100% Dynamic burn-in boards at 85  C with continuous monitoring using the same test program Review results, calculate deviations in the parameter from the previous tests 100% Visual Inspection

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 14 PEM (ASICs, ADC, DAC) Screening Flow Single Wafer Lot and Single Manufacturing Lot Rework and replace boards, if any, using the screened parts from 10% lot Perform 100% electrical inspection using the same test program after rework Conformal coat the boards Perform 100% electrical verification using the same test program Store flight boards in nitrogen purge storage Obtain approval of PCB Flight boards ready for next step Present data to the Parts Control Board (PCB) (Screening & Qualification)

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 15 PEM Qualification on Parts from Screened Lot Preconditioning for moisture intake and reflow simulation (30pcs) Highly Accelerated Stress Test (HAST) (30pcs) – –Unbiased HAST – 168 hrs at maximum temperature the part can operate and 85% RH – –Electrical Testing at –30 degrees C, +25 degrees C, and +85 degrees C. C-Mode Scanning Acoustic Microscope (CSAM) as per IPC/JEDEC, J-035 (15pcs). Destructive Physical Analysis (5pcs) Operation Life Test – –As per MIL-STD-883, method 1005, condition D, 1000 hrs 22 pieces from flight screening lot. – –Electrical Testing – –Review qualification report and data with Parts Control Board

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 16 EEE Parts Concerns ASICs –Packaging of ASICs, screening, and qualification. –Certify subcontractors for packaging, testing, and qualification. –Radiation testing (TID, SEE, and SEU) ADC & DAC –Screening and qualification of Maxim parts and radiation testing. –To mitigate risk, EM sample parts were evaluated and no anomalies were noticed. Parts lists yet to be finalized Derating and stress analysis to be performed after selection of parts for each individual PWB assembly (in progress) Thermal analysis of PWB to be performed (in progress)

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 17 Radiation Testing All EEE parts are being reviewed by PCB and screened for radiation susceptibility against the radiation specification defined in GLAST 433-SPEC-0001 ASIC radiation testing was performed on similar engineering parts produced using similar processes and materials. Maxim ADC and DAC were tested and met requirements.

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 18 Backup

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 19 EEE Parts Implementation Plan Part lists are reviewed and approved by the project PCB prior to flight procurements. Special considerations include: –Radiation evaluation of all active components –Radiation testing (TID and/or SEE ) when necessary –Parts stress analysis –PIND testing on all cavity devices –Destructive Physical Analysis (DPA), when applicable –Pre Cap or sample DPA on semiconductors, microcircuits and hybrids devices as required –Life Testing if Quality Conformance Inspection (QCI) data within one year of the lot being procured is not available –No pure tin, cadmium, and zinc plating is allowed

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 20 EEE Parts Implementation Plan Special considerations include cont ’ d: –50V ceramic capacitors require 85 0 C/85RH low voltage testing –Mandatory surge current testing on all tantalum capacitors –Plastic Encapsulated Microcircuits requires special evaluation as outline in the EEE parts plan –Age control requirements. Lot Date Code (LDC) older than 9101 requires DPA and room temperature re-screen –Parts traceability from procurement to assembly of boards. –GIDEP Alerts & NASA Advisories review and disposition –Parts Identification list (PIL) includes LDC, MFR, Radiation information on the flight lot

GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 21 Radiation Testing SEE Rate and Effects Analysis: –SEE rates and effects shall take place based on threshold LET (LETth) as follows: SEE immune is defined as a device have an LETth > 37 MeV*cm 2 /mg –Our goal is to test each part type (not previously radiation tested) to the above requirements. Device ThresholdEnvironment to be Assessed LETth < 15 MeV*cm 2 /mgCosmic Ray, Trapped Protons, Solar Heavy Ion and Proton LETth =15-37 MeV*cm 2 /mg LETth > 37 MeV*cm 2 /mg Cosmic Ray, Solar Heavy Ion No analysis required