Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 1 Data Board l 2 production boards in testing on the 14th floor l Both boards are fully functional at.

Slides:



Advertisements
Similar presentations
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Advertisements

GCT Software ESR - 10th May 2006 Jim Brooke. Jim Brooke, 10 th May 2006 HAL/CAEN Overview GCT Driver GCT GUI Trigger Supervisor Config DB Test scripts.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Calice ECAL Readout Hardware Status report Adam Baird ECAL Meeting 26 Sept 2003 LLR-Ecole Polytechnique.
Replacing Hardware With Software Analysis and simulation of existing hardware using Discrete Event System Specification. By:Philip Felber Aman Gupta Imaduddin.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
1 ROD US ATLAS FDR, ROD Overview Atlas Wisconsin Group Khang Dao, Damon Fasching, Douglas Ferguson, Owen Hayes, Richard Jared, John Joseph, Krista Marks,
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
XTRP Hardware Mike Kasten University of Illinois 2/24/00.
Burkard Reisert June 11 th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting Ted’s overview talk: Pulsar production/testing success !  all hardware.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
P. Shanahan June 13, Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Kevin Pitts February 24, 2000 XTRP Review slide - 1 XTRP Review Agenda: äIntroduction/OverviewK. Pitts10’ äBoard StatusM. Kasten25’ äDAQ/Interface/Test.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Muon Trigger Status Report Eric James Trigger Commissioning Workshop 8/17/00.
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
J. Linnemann, MSU 2/12/ L2 Status James T. Linnemann MSU PMG September 20, 2001.
1 P. Wilson Trigger Workshop 8/17/00 Trigger Workshop Introduction and Goals l Establish goals and detailed for commissioning the Trigger Systems l Plan.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
XTRP Software Nathan Eddy University of Illinois 2/24/00.
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication/ Test –Gate Generator (Jimmy) à Synchronized.
Level 1-2 Trigger Data Base development Current status and overview Myron Campbell, Alexei Varganov, Stephen Miller University of Michigan August 17, 2000.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
15-Aug-08DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver, Nathan Felt, Sarah Harder Long baseline neutrino.
CMM++ activities at MSU Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, CERN, 13 – 17 September 2010.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
FNAL Software School Day 4 Matt Herndon, University of Wisconsin – Madison.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
1 P. Wilson Trigger Workshop 8/17/00 Trigger Operations Organization l We have significant challenges ahead to commission the Trigger systems – will need.
CMS DAQ project at Fermilab
Commissioning of the ALICE HLT, TPC and PHOS systems
eXtremely Fast Tracker; An Overview
Kevin Burkett Harvard University June 12, 2001
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 1 Data Board l 2 production boards in testing on the 14th floor l Both boards are fully functional at VME speed - including board to board communication l Full speed testing äEach board functional in stand alone tests äInter board communication underway (code modifications) l Plan to have boards at B0 by end of August äRepeat integration (xft/muon/cal/l2) äBegin testing run control software l Plan to proceed with assembly of remaining data boards

Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 2 Track Trigger Board l Boards in fabrication (8/4/00) äWill assemble 2 boards äExpect assembled boards by 10/1/00 l FPGA designs in development- B. Brown l Test/Control software as well as simulation also far along

Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 3 Additional Boards l Clock/Control Board (2 available, 1 needed) l Data Board TM (12 needed) äAssembling production boards at Illinois ä9 boards at FNAL (expect remainder next week) l Clock/Track Trigger TM (2 needed) ä2 available, 1 in use at FNAL ä2 more need to be assembled l Front Panels for all boards in fabrication

Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 4 XTRP Software l C++ XTRP simulation - J. Holliday äfully functional, generates XTRD banks äverified against existing java simulation äpart of the TrigSim Offline package l XTRPMON äwork underway on monitoring code äpart of TRIGMON package l Run Control & Readout Software in development

Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 5 XTRP Summary l Realistic assessment of functionality for Sept 1 äFunctional XTRP system with 2 data boards (60 degrees) l Status of Run Control Software äNeeds to be completed l Status of TRIGSIM module äComplete l Goals for the commissioning run äTime in system with actual collision data äProduce electron & muon triggers with tracking info

Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 6 Trigger l XTRP is the interface between tracks in the COT (XFT) and the remainder of the Level 1 trigger. l XFT data input to the XTRP l Output info to: äL1 calorimeter (extrapolate) äL1 muon (extrapolate) äTrack Trigger (pass) äGlobal L1 & L2 (pass) äSVT (pass)

Nathan Eddy Aug 17, 2000 Trigger Workshop slide - 7 XTRP System