Gavin Astin 29 September 2011 Suggestions for Efficient Measures Short and Medium term.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Managing Hardware and Software Assets
The 4 T’s of Test Automation:
1 of 20 Information Dissemination Audiences and Markets IMARK Investing in Information for Development Information Dissemination Audiences and Markets.
1 of 18 Information Dissemination New Digital Opportunities IMARK Investing in Information for Development Information Dissemination New Digital Opportunities.
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
The vision for Sri Lanka’s Tertiary and Vocational Education
Medical devices: Application of risk management to medical devices
1 Measurement of Production of Financial Institutions Conclusions and recommendations 3-10 by the OECD Task Force on Financial Services (Banking Services)
1 Report to the AEG Findings of the Task Force on Employers Retirement Schemes Adriaan Bloem, IMF John Ruser, BEA Co-chairs.
Best Available Techniques (BAT)
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 2 Business Processes and Accounting Information.
MedVentures Your business pitching templates
1 Dr. Peder Jensen Project Manager, Transport and Environment TERM TERM Transport and environment: on the way to a new common transport policy.
Terje Andersen 06 May 2011 Analysis of past derailments Information from data bases, investigation reports and surveys.
Gavin Astin/ Terje Andersen 06 May 2011 Survey of Existing measures.
Terje Andersen / Gavin Astin 29 September 2011 Assessment of measures Potential new measures, or extended scope of existing measures.
NPA WG : Single and multiple releases
Gavin Astin 06 May 2011 Study overview. Study Overview 06 May About DNV Independent foundation with around 9,000 employees. Det Norske Veritas.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Gavin Astin 29 September 2011 Study overview. Study Overview 29 September About DNV Independent foundation with around 9,000 employees. Det Norske.
Addition Facts
Making the System Operational
Evaluating Provider Reliability in Risk-aware Grid Brokering Iain Gourlay.
1 Drafting a Standard n Establish the requirements n Agree the process n Draft the Standard n Test the Standard n Implement the Standard.
5/31/20141 HFT 4464 Chapter 9 Introduction to Capital Budgeting.
Asset Liability Management is a procedure which allows us to gain an understanding whether the companys assets would be sufficient to meet the companys.
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Government Services Group Wednesday, 18 September 2013 Purchase Cards Government Services Group Presented by Miro Dabek, Manager Procure to Pay Reform.
EMS Checklist (ISO model)
Risk Management Awareness Presentation
Chapter 10 Project Cash Flows and Risk
Additional Assurance Services: Other Information
1 The interconnection of business registers Judit Fischer – DG Internal Market and Services Budapest, 14 June 2010.
Checking & Corrective Action
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Risk The chance of something happening that will have an impact on objectives. A risk is often specified in terms of an event or circumstance and the consequences.
Global Entrepreneurship and Small Business Management
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Lecture 8: Testing, Verification and Validation
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
1 INTRODUCTION TO FINANCIAL MANAGEMENT. 2 JOIN KHALID AZIZ ECONOMICS OF ICMAP, ICAP, MA-ECONOMICS, B.COM. FINANCIAL ACCOUNTING OF ICMAP STAGE 1,3,4 ICAP.
Addition 1’s to 20.
Week 1.
Care and support planning Care Act Outline of content  Introduction Introduction  Production of the plan Production of the plan  Planning for.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 20 Systems Operations and Support.
G L O B A L S E R V I C E / I N D U S T R Y A U D I T / T A X / A D V I S O R Y / L I N E O F B U S I N E S S SAS 112 Presentation California State University.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Multiple Regression and Model Building
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Gavin Astin 06 May 2011 Survey of markets. Markets 06 May Survey of Existing Markets - Method  Definition: “An technical measures is a device.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Frequency analysis and scenario development
Event Management & ITIL V3
By Team T-Rex James Houlihan And Gavin Herbert
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
Software Project Management
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Workshop on CSM-DT, November 2016
Workshop on freight train derailments - Introduction -
Quality Risk Management
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Air Carrier Continuing Analysis and Surveillance System (CASS)
Project Management How to access the power of projects!
Robin Youll Office for National Statistics
Presentation transcript:

Gavin Astin 29 September 2011 Suggestions for Efficient Measures Short and Medium term

Freight train derailment risk model 29 September 2011 Agenda 2 1. Background 2. Quantitative Assessment 3. Qualitative Assessment 4. Conclusions

Freight train derailment risk model 29 September 2011 Next Step – Efficient Measures Is the benefit secured (avoided derailments) worth the investment? An investment made will return benefits over the lifetime of the measure. Economic indicators used: - Net Present Value – the difference between the present value of cash inflows and the present value of cash outflows. - Benefit / Cost Ratio – the ratio of benefits to costs (a ratio greater than 1 indicates that the benefit outweighs the cost). - Internal Rate of Return - can be defined as the break-even interest rate which equates the Net Present of a projects cash flow in and out. It is the consideration of these factors that lead to our assessment of those measures that are the most efficient. 3

Freight train derailment risk model 29 September 2011 Agenda 4 1. Background 2. Quantitative Assessment 3. Qualitative Assessment 4. Conclusions

Freight train derailment risk model 29 September 2011 Potential Benefits 5

Freight train derailment risk model 29 September 2011 Quantitative Assessment 6 Based on our assessment of available benefit versus cost to secure that benefit at 20 years. AD = Avoided Derailment; AS = Avoided Severe Derailment (prevents an initially non severe derailment from escalating in consequence).

Freight train derailment risk model 29 September 2011 Discussion – Preventative Measures P10 & P 12 - HABD / HWD: - Extensively applied already, current devices being updated, new devices being installed. - Benefit reducing for this reason. - High installation density required. P28 - Roller Cages: - Our assessment is for replacement of existing roller cages as soon as possible, an alternative measure is for replacement at next maintenance interval. P11 – BAM: - Installation of bearing acoustic monitors along the track that might be an alternative to hot axle box detectors as less detectors are necessary. Networking of information might be required. P13 – WLID: - Wheel load and wheel impact load detectors have a broad functionality in terms of detecting overloading, skew loading, wheel damage and out of roundness which leads to HABD. A lot of measures directed towards the same cause (hot axle box), but more than 80% of derailments are from causes other than hot axle boxes.

Freight train derailment risk model 29 September 2011 Discussion – Mitigation Measures (with automatic brake application) versus Prevention Consider measure M1 applied to all Freight trains (M1a-Derail All Freight) and P13- WLID/WIM detectors. We can see that M1a-Derail Det All Freight prevents 76 derailments from becoming severe whilst P13 prevents 74 derailments from occurring at all. On first consideration it may seem that preventing 74 derailments is the better outcome. However of these 74 a number will be safely managed (if occurred) and would not escalate in consequence, therefore only a proportion of these prevented derailments are severe (if occurred). We will see later that M1a has drawbacks which have not been discounted from the benefits. Also the cost of implementing measure M1a means it is less cost effective than P13. We note an alternative type of derailment detection device which provides an alarm to the train driver when a derailment is suspected, but without an automatic brake application (type M1b). We are not aware of these being available on the market (for freight application) in Europe. Consideration of these devices, the human factors issues involved and their costs would be required prior to formal assessment

Freight train derailment risk model 29 September 2011 Drawbacks False alarms are possible with most of these measures, although an appropriate monitoring alarm management regime can minimise these. Item M1 (derailment detection with automatic brake application) could provoke a derailment in false alarm cases. Measure F7 – Sliding Wheel Detectors are not known to have many suppliers. 9

Freight train derailment risk model 29 September 2011 Agenda Background 2. Quantitative Assessment 3. Qualitative Assessment 4. Conclusions

Freight train derailment risk model 29 September 2011 Organisational and Other Options A lot of our measures could be considered to be replacements or substitutes for proper organisational controls. What other options are there?: Loading errors can contribute significantly to freight train derailments, usually in combination with other defects like poor train handling / adverse track geometry. - It could be considered to require the qualification and registration of loading personnel. Track geometry issues, particularly those attributable to track twist, are a major concern. We estimated between 34 and 50 per annum; these include cases where track twist is within existing safety limits, but due to unfortunate freight train composition and loading (which may also be within relevant criteria) combine to cause a derailment: - A system of common and stricter safety limits and intervention limits could be a step forward. 11

Freight train derailment risk model 29 September 2011 Present Obligations Existing Safety Management Systems should address: - Poor maintenance standards of rolling stock can lead to derailments (including many simple and routine tasks). - Failure to maintain track geometry and other asset conditions – particularly in secondary and side-tracks – is a common cause of derailments. Increased supervision of these parameters by NSAs or other independent parties could be an effective control 12

Freight train derailment risk model 29 September 2011 Agenda Background 2. Quantitative Assessment 3. Qualitative Assessment 4. Conclusions

Freight train derailment risk model 29 September Background and Context We have looked at the potential for improvement, and not an absolute assessment of the efficiency of all measures that are applied today. Therefore it follows that if a measure is applied extensively already there is little room for improvement through the further application of that measure. For this reason some measures that are extensively applied already are not considered in this work. Their omission should not be considered as suggesting such measures are not efficient. The assessment of measures does not consider the way or the order in which these interventions should be pursued, for example it is not considered whether these interventions should be introduced in a mandatory or voluntary way or whether the measure should be introduced as an EU harmonised measures or only within certain member states or only certain companies.

Freight train derailment risk model 29 September 2011 Efficient Measures (1 to 5) We consider the following technical measures as being efficient (they have a positive or unity benefit / cost ratio in our reference case and all sensitivity studies): - P13-Wheel Load Impact Detectors / Weighing In Motion. - P28-Replacement of Brass for Polyamide Roller Cages. - P15-Bogie Hunting Detectors. - P11-Bearing Acoustic Monitoring. Considering measure P28, we have considered an immediate replacement of brass/steel for polyamide roller cages. An alternative option is for replacement at the next scheduled maintenance interval for bearings/axle boxes. This is almost a zero cost option, although the benefits would take longer to materialise. Potential drawbacks to the use of these measures (excluding measure P28) relate to false alarms. To some extent these can be overcome by the use of good alarm management processes. 15

Freight train derailment risk model 29 September 2011 Efficient Measures (6 to 8) In addition the following two measures are slightly on the positive side based on the parameters in our reference case but their potential is low and could be eroded by false alarms: - F7-Sliding Wheel Detectors. - P16-Wheel Profile Detectors. Finally, measure F7 is to the best of our knowledge a market with only a small number of suppliers. This may give rise to market advantage to existing suppliers of these systems. We consider the following mitigation measure as potentially efficient if the significant identified drawbacks could be solved: - M1a-Derailment Detection (with automatic brake application) applied to All Freight Trains. - (An alternative type of derailment detection device which provides an alarm to the train driver when a derailment is suspected, but without an automatic brake application (type M1b) may address this drawback. However we not aware of these being available on the market for general freight application. An assessment of these devices, considering the human factors issues involved and their costs, would be required before these could be formally assessed.) 16

Freight train derailment risk model 29 September 2011 Efficient Measures (9 and 10) F-2: Awareness Programme for Rolling Stock Maintenance. This measure may serve to address the problem of poor maintenance standards of rolling stock. This may include training that sought to concentrate on main rolling stock maintenance derailment causes (which can be extracted from this work). This measure may be followed by increased supervision of these parameters by NSAs. P-18: Track Geometry (all tracks). The problem of poor track geometry (in particular track twist) should be considered. This is of course an area for each IMs own management system. However a specific measure in this regard must be concerned with increased supervision of these parameters by NSAs to ensure that documented standards are being met. 17

Freight train derailment risk model 29 September End of Session - Any Questions

Freight train derailment risk model 29 September Safeguarding life, property and the environment