© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary 13-14 November 2014 Geneva, Switzerland.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Work Plan Development Guidelines and Schedule.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Climate & Water Department Side Event I: The Role.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
CBS-MG-5/Doc 4/ APPENDIX EC Action Group for an Enhanced WMO January 24-25, 2005.
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
GEO Strategic Plan : Implementing GEOSS
Chesapeake Bay Program Goal Development, Governance, and Alignment Carin Bisland, GIT6 Vice Chair.
Integrated Earth Observations - Building the Bridges - IGOL Theme Team Meeting Sept 2004 Jeff Tschirley Chief, SDRN.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
Engaging Stakeholders 6 May 2015 Work Plan Symposium Geneva, Switzerland Kathy Fontaine IEEE.
How GEO works  Coordinating activities of Members and Participating Organisations  Supporting the development of capabilities for Observations, Processing.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
GEOSS Midterm Evaluation User Interface Committee – March 2010 John Adamec & Yana Gevorgyan GEOSS Evaluation Team.
Task ID-05 IDIB report ID-05 Catalyzing Resources for GEOSS Implementation C1 - Resource Mobilization for Capacity Building C2 - Resource Mobilization.
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
Getting Involved in the Research Data Alliance Stefanie Kethers
GEO Implementation Plan 2025 Barbara Ryan & Espen Volden GEO Secretariat SIT Workshop Agenda Item 15 CEOS SIT Technical Workshop CNES, Montpellier, France.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
ID-01 report 17 September 2014 IDIB meeting, Enschede Michel Schouppe
Global Land-cover and Land-cover Change Task (SB-02) Brice Mora (GOFC-GOLD LC) GEO-X Ministerial Summit, Geneva, January 14, 2014.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Slide: 1 27th CEOS Plenary |Montréal | November 2013
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 CEOS Perspectives on Post-2015 GEO Timothy Stryker and Brent Smith.
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
Preparation of the 2010 GEO Ministerial Summit GEO Science and Technology Committee Preparation of the 2010 GEO Ministerial Summit Gilles OLLIER Head of.
Task ID_01 “Advancing GEOSS Data Sharing Principles” The Group on Earth Observations Data Sharing Activities for 2013 Reported by Lerato Senoko 29 th EXCOM:
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
© GEO Secretariat GEO Work Plan Overview Document 20 GEO-VIII Plenary November 2011.
SACS/CASI District Accreditation  January 2007  April 2007  May 2007  January – April 2008  Board Approval for Pursuit of District Accreditation.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Report of the 6 th GEOSS Evaluation Presentation to GEO-XII 11 November 2015 John Adamec Co-Chair GEO Monitoring & Evaluation Working Group.
Draft Terms of Reference for the Country Research Studies Promoting Agriculture-Climate-Trade linkages in the East African Community (PACT EAC) BY RASHID.
Committee on Earth Observation Satellites CEO Team 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 CEOS and GEO.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, GEOSS Midterm Evaluation Team GEO Executive.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, Evaluation Team GEO Executive Committee Meeting.
GEO’s Need for Non-space Based Observations and the GEO Vision for GD6 Osamu Ochiai GEO Secretariat November 10 Mexico City.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, GEOSS Midterm Evaluation Team GEO Executive.
WGCapD, CEOS and the UN Sustainable Development Goals (SDGs) Committee on Earth Observation Satellites Deputy CEOS Executive Officer / CSA Marie-Josée.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Reporting, Monitoring and Evaluation
5.2 Monitoring and Evaluation
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
GEOSS Data Sharing Principles
GEO Programme Board Report
GEO-Global Water Sustainability
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Outcomes from the GEO Ministerial and GEO-X Plenary
Overview of working draft v. 29 January 2018
Links with GEO.
Summative Evaluation for GEOSS Implementation
CEOS Response to IPWG on Draft GEO Strategy
Presentation transcript:

© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland

Overview Fifth Evaluation of GEOSS Implementation (Weather, Water, Climate) and Executive Committee Response (Plenary Document 10) (for approval) Progress on the sixth (final) Evaluation of GEOSS Implementation Progress in the Implementation of Recommendations of GEOSS Evaluations (Plenary Document 11) (for approval)

Fifth Evaluation of GEOSS Implementation (Weather, Water, Climate) and Executive Committee Response (Plenary Document 10) (for approval)

5 th Evaluation Team NorwayLars Ingolf EideCo-Chair United StatesMichael TannerCo-Chair IranAli Didevarasl GreeceEvangelos Gerasopoulos GermanyGuido Halbig AustraliaAgnes Lane CanadaJean Leclerc United StatesMeagan Singer JapanRyutaro Tateishi

5 th Evaluation Process Fifth GEOSS evaluation of Water, Weather and Climate SBAs commenced in late October 2013 Data collection and analysis from November 2013 to April 2014 Draft report submitted to GEO Secretariat for factual review April 9, 2014 Revised draft submitted to M&E WG May 9, 2014 Final Report to GEO Executive Committee June, 2014 Presentation to GEO Executive Committee July, 2014

5 th Evaluation: Key Messages Evaluation of progress was facilitated by improvements to reporting in GEO, in particular, the reports prepared by the Implementation Boards for Plenary. Current strategic targets are viewed by GEO participants as deeply ambiguous –Better targets would be: specific, measurable, and firmly achievable under the scope of GEO Organized around the users and societal sectors served, instead of the data provider communities

5 th Evaluation: Key Messages Need to consistently and clearly articulate a unique role and mission for GEO, especially with respect to other international organizations Opportunity to advocate support for in situ observation networks Challenge of securing appropriate forms and levels of support over the necessary time frames to achieve desired outcomes –Projects, as well as: communication, capacity building, administration, and evaluation functions © GEO Secretariat

5 th Evaluation: Proposed Responses From 15 findings, the ET made 13 recommendations ExCom has proposed the following responses –7 of 13 were already addressed in the IPWG report 1- cross SBA interaction, 3- clarifying role of GEOSS, 5- promoting in situ observations globally with developing countries emphasized, 6- concise and measureable targets for activities, 8- improving outreach and user engagement, 12- organizing around user domains, 13- using GEOSS as a platform to address observational gaps)

5 th Evaluation: Proposed Responses From 15 findings, the ET made 13 recommendations ExCom has proposed the following responses –6 of 13 request other actions 2- periodic confirmation of listed task contacts by Secretariat, and determine if this is necessary for all or only a subset of activities in the future, 4- requests capacity building activities adopt suitable impact assessment practices as part of the activity, 7- apply reasonable user experience monitoring to the GEO Portal, 9- renew effort to identify a component coordinator for the Cold Regions activities, 10- achieved in responding to recommendation 7, 11- review status of, and identify opportunities for GEO to advocate for, sustainability of the TIGGE archive.

Progress on the sixth (final) Evaluation of GEOSS Implementation

Unique Concepts from 6 th Evaluation Framework Evaluation Scope: Entire period of the first 10-Year Implementation Plan and full range of SBAs and Transverse Areas Strategy: Build on prior evaluations through synthesis of previous findings to guide further data collection and new analysis. Desired Outcome: Forward-looking recommendations applicable to the next implementation plan rather than advice specific to the current ( ) documents.

Final Evaluation Team CroatiaBojan Lipovscak JapanYukio Haruyama United StatesMatthew Druckenmiller Co-Chair GermanyGuido Halbig GreeceEvangelos Gerasopoulos NorwayLars Ingolf EideCo-Chair CanadaRima Ammouri European CommissionGilles Ollier

Final Evaluation Timeline Initial meeting of the Evaluation Team with the M&E WG July 2014 Data collectionJuly February 2015 Interim Report on initial findings for IPWG* End January 2015 Completed draft report provided to M&E WG and Secretariat for factual review End April 2015 Transmittal of the final evaluation report to M&E WG End May 2015 Presentation of final evaluation report to ExCom July 2015 *If resources allow.

The M&E WG and ET request you to: Please respond if contacted to provide input to the evaluation Please take part in the public evaluation survey Please share the survey and encourage others to participate too Visit: for further information or to contact the team.

Progress in the Implementation of Recommendations of GEOSS Evaluations (Plenary Document 11) (for approval)

Progress in the Implementation of Recommendations Context GEO-IX Plenary in November 2012 approved a process to track the implementation of recommendations from the series of evaluations. Progress was assessed by the M&E WG. Information collected via Secretariat experts. Structure

Progress in the Implementation of Recommendations Results