Environmental compatibility of wind power - The Norwegian experience - Anders P. Iversen Head of section for environmental impact assessments and land.

Slides:



Advertisements
Similar presentations
GREEN PAPER on Maritime Policy - PlanCoast Statement 2nd PlanCoast Meeting Constanta EU GREEN PAPER ON MARITIME POLICY.
Advertisements

Towards a Shared Environmental Information System (SEIS) European Biodiversity Data EIONET/NRC Meeting 29/30 October 2007 Ivone Pereira Martins/Rania Spyropoulou.
SUSTAINABLE DEVELOPMENT, GLOBAL CHANGE AND ECOSYSTEMS Forestry and wood chain related research in Sustainable Development, Global change and Ecosystems.
Process – Resource Evaluation Design and perform a set of geographically based resource assessments Develop a methodology for prioritizing land according.
Møysalen national park and protected landscape - the process of making a management plan Christian Brun-Jenssen County Governor of Nordland.
What is involved in the planning process and who makes the decisions?
European Landscape Convention – approaches and solutions in Estonia Mart Külvik & Kalev Sepp Environmental Protection Institute, Estonia Estonian Agricultural.
Comparing environmental performance Environmental benchmarking for small and medium-sized enterprises in the Nordic tourism industry Anne Maria Sparf.
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
Presentation to Joint Oireachtas Committee on Agriculture, Food and the Marine on the positive impacts of Coillte on Ireland’s carbon footprint Thursday.
The German Administration Basic structure NATIONAL LEVEL ADMINISTRATION MUNICIPAL (LOCAL) LEVEL ADMINISTRATION STATE LEVEL ADMINISTRATION.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Science requirements to support licensing of marine renewable Ian Davies Marine Scotland.
Moving towards a more comprehensive planning SEA and indicators Per Christensen Aalborg University Denmark.
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Wind.
MAURITIUS STANDARDS BUREAU
EU Rural Development Policy and Tourism Jean-Michel Courades DG Agriculture and Rural Development European Commission.
Lecture :TitleEcotourism Management Considerations
One Land – Many Stories: Prospectus of Investment Department of Sustainability, Environment, Water, Population and Communities December
The IUCN Programme Nature+ Proposal, May 2011.
Ioannis Ch. Saridakis Chemical Engineer ELOT, Hellenic Organization for Standardization Initial meeting, Athens, 11 May 2010 AgriTourNet /ELOT May 2010.
Environmental Impact Assessment (EIA): Overview
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Environmental Impact Assessment University of Santo Tomas College of Architecture SP2 Ecological Construction Environmental Architecture.
Federal Regulation of Land Use 9/27/11. What is NEPA? NEPA = National Environmental Protection Policy Act – Mandates an environmental assessment of all.
In the Name of God, Most Gracious, Most Merciful.
ALPINE SPACE II - SWOT analysis slide 1 Preparation of the Alpine Space II programme First results of the SWOT analysis Alpine Space Summit –
SISTEM PLANIRANJA V SLOVENIJI Okvirni sistem Analiza možnosti dolgoročnega (srednjeročnega) razvoja Krajinska zasnova Primerjalna študija (za presojo variant.
National Park Russian Arctic & Perspective of Tourism Development in the Northern Russian Barents Sea RUSSIAN TOURISM ROADSHOW /Berlin, Paris, London 2012/
Natural England State of the Natural Environment, Strategic Direction refresh, and Manifesto Dr Helen Phillips, Chief Executive, Natural England.
Nature protection and wind farm development in Serbia Dr. sc. Toni Safner IRES ekologija.
What is Ecotourism? According to The International Ecotourism Society (TIES)"Responsible travel to natural areas that conserves the environment and improves.
A Biodiversity Strategy for PMHC LGA. Policy background Key Natural Environment Strategy: To maintain and improve existing environmental values in the.
The Planning Regions Legend (reduced): urban agglomeration rural area
Environmental data management Dar es Salaam,
0 Tadas Matulionis Lietuvos Energija AB Strategic planning manager Minsk, December 07, 2007 Environmental Impact Assessment of a New Nuclear Power Plant.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Chapter 3 Wind Power of the world. 3.1 Development and utilization of wind energy in China  Wind power generation  Wind farm construction.
Wageningen International Introduction agri environment measures Pleven Agri environment in the Netherlands Background Natura 2000 and agricultere Common.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
Atlin-Taku Land Use Plan Resource Chapters Update Presentation to Multiparty Workshop #6 Atlin Rec Centre, Nov 27-28, 2009.
Windfarms Implementing SPP6 Nick Evans 6 th December 2007.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
EIA and sensitive areas – from case to case The role of the Directorate for Nature Management Mari Lise Sjong Advisor, Directorate for Nature Management.
Sample Codes of Ethics in Adventure Tourism
Successful Application of SEP In Sitting Of Industries.
Defenders of Wildlife Species we are helping to protect.
SEA in the Czech Republic Prague, 24 September 2008.
Ecology The study of how organisms interact with living and non- living aspects of their environment.
ICZM PROTOCOL INDICATORS THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT: What indicators are needed? Marko PREM Director a.i.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
Impact assessment concerning energy projects. Case; windpower 16 October 2007 Harald Noreik Ministry of the Environment.
Planning Scotland’s Seas consultation Seas Consultation 2013.
Czech methodology for wind power plants localization (from the point of view of nature conservation) Brussels January, 17th 2006 Ministry of the Environment.
Network for Certification and Conservation of Forests.
Dutch program offshore wind energy Cumulative effects and Mitigation measures ORELG 4 february 2016.
Law and Sustainable Development Gabriel Michanek Professor in Environmental Law Faculty of Law Uppsala University, Sweden.
ISO Session 3 Environmental Management and Ethics in Management.
Wind Power Norway had a goal of 3000 GWh annual wind energy production within Government investment support - 1 Euro- cent per kWh wind energy. National.
How to Protect the Local Environment
ENVIRONMENTAL IMPACT ASSESSMENT
DG Environment, Nature Protection Unit (D3)
Kerstin Sundseth, Ecosystems LTD
World Bank project example
When and how to best consider the provision of the Habitats directive
Expert group on management of Natura 2000
Wind energy & EU legislation for Nature conservation
MINI -HYDROPOWER Climate friendly but not devoid of environmental and social risk.
Presentation transcript:

Environmental compatibility of wind power - The Norwegian experience - Anders P. Iversen Head of section for environmental impact assessments and land use planning National Directorate for nature management, Norway

In operation License given Application received Plans on hold Notification received License rejected Total of notifications and applications received: 108 windpower plants windmills MW total Total of these in operation or license given: 21 windpower plants windmills MW total

Driving forces: Climate change worries – a strong push to increase clean and renewable energy production. Government support of investment costs (until 2004), and a new support scheme with characteristics similar to a feed-in scheme (proposed from 2007: approx 0,01 EURO/Kwh). Licensing procedure: Notification and licensing (including EIA procedure and consultation process) at project level, managed by national energy directorate.

Main conflicts observed: Landscape (especially worries about effects on tourism industry destinations). Local residents (skepticism to landscape change, noise/light scattering etc. – Not in my back yard). Biodiversity (worries about observed and possible effects on protected and red listed species, especially birds). Wilderness (many wind power plants proposed in the last remaining areas untouched by human intervention).

Thematic conflict assessment results (67 plants assessed): Purpose: to ensure a sustainable wind power development, taking into account other land use- and community interests. Consider cumulative effects between different projects, and give a combined assessment of the proposed wind power plants. Aspects: reindeer pastures, military areas, environment. Aspects (themes) under heading Environment: Nature (Bird life, Nature types, Ecological function, Recreational areas, Untouched areas). Landscape. Cultural heritage. Environment Number of windpower plants (of 67 assessed) Number of windmills (with MW mills) Production capacity MW (approx.) A: No/small conflict000 MW B: Lesser conflict MW C: Medium conflict MW D: Large conflict MW E: Very large conflict MW

Difficulties encountered: Lack of sufficient knowledge about area (for example biodiversity mapping). Lack of methodology for landscape evaluation and assessment. Lack of methodology for assessment of cumulative effects. Ranking based on environmental values in proposed area, without comparing with production capacity (no assessment of conflict per produced GWh). Information gathering Collection of available knowledge on environmental values in proposed area of construction. Assessment of level of conflict between proposed windpower plant and the environmental values present (based on national environmental goals). Results Ranking of proposed wind power plants according to conflict level. Improved advice on mitigation measures to reduce conflict.

Comments related to proposed EEA methodology: 1.Biodiversity impact can be important also outside of designated nature conservation areas. The methodology should take the biodiversity aspect into account in non-protected nature. (2010-goal to stop loss of biodiversity etc.) 2.How to handle cumulative effects in this methodology? 3.Valuable landscape is not only an aspect only in touristic sites, but could be a separate category. (Ref. the European landscape convention). 4.Land use quantification as proposed does not say much about the level of conflict between proposed power plants and the environmental values present in the area, (including results of possible mitigation measures). 5.Mapping of suitable areas for wind power plants would be more accurate if based on information about: Wind resource (and power line availability in remote areas). Environmental and other community values to be taken into account. Assessment of conflict between these values and wind power development. County-level land use planning to map suitable/unsuitable areas for wind power development will be initiated in Norway in 2007 (guidelines under preparation).