Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR and Capital Budgeting.

Slides:



Advertisements
Similar presentations
Chapter 7 Capital Budgeting Processes And Techniques
Advertisements

Capital Budgeting Decisions
Incremental Analysis Lecture No. 21 Professor C. S. Park
Chapter 7 Rate of Return Analysis
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Chapter Outline 6.1 Why Use Net Present Value?
Net Present Value and Other Investment Rules Chapter 5 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The Capital Budgeting Decision (Chapter 12)  Capital Budgeting: An Overview  Estimating Incremental Cash Flows  Payback Period  Net Present Value 
McGraw-Hill/Irwin Corporate Finance, 7/e © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved. 6-0 CHAPTER 6 Some Alternative Investment Rules.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies,
Key Concepts and Skills
© Prentice Hall, Chapter 8 Evaluating Investment Projects Shapiro and Balbirer: Modern Corporate Finance: A Multidisciplinary Approach to Value.
McGraw-Hill/Irwin Corporate Finance, 7/e © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved. 6-0 CHAPTER 6 Some Alternative Investment Rules.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
(c) 2001 Contemporary Engineering Economics 1 Chapter 16 Capital Budgeting Decisions Methods of Financing Cost of Capital Choice of Minimum Attractive.
MANAGERIAL ECONOMICS 11 th Edition By Mark Hirschey.
Ch 6 Project Analysis Under Certainty
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
13-1 Chapter 13 Capital Budgeting Techniques © 2001 Prentice-Hall, Inc. Fundamentals of Financial Management, 11/e Created by: Gregory A. Kuhlemeyer, Ph.D.
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
(c) 2001 Contemporary Engineering Economics 1 Chapter 9 Rate of Return Analysis Rate of Return Methods for Finding ROR Internal Rate of Return (IRR) Criterion.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Financing Activities Lecture No. 41 Chapter 10 Contemporary Engineering.
Contemporary Engineering Economics, 4 th edition, © 2007 Choice of MARR Lecture No. 62 Chapter 15 Contemporary Engineering Economics Copyright © 2006.
Pemilihan Investasi Terbaik Pertemuan 19 dan 20 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Lecture No.33 Chapter 10 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
10-1 Copyright (C) 2000 by Harcourt, Inc. All rights reserved. Chapter 10: The Cost of Capital Copyright © 2000 by Harcourt, Inc. All rights reserved.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
Chapter 13 Capital Budgeting Techniques. Learning Objectives After studying Chapter 13, you should be able to: Understand the payback period (PBP) method.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Methods of Financing Lecture No.
Selecting a Minimum Attractive Rate of Return Chapter 15 Mechanical Engineering 431 Engineering Economics.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks 10-1 Pearson Higher Education ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital.
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Business Finance (MGT 232)
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 10 The Cost of Capital.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Internal Rate of Return Criterion.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Process of Developing Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Project Volatility Lecture.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 10 The Cost of Capital.
Chapter 9 - Cost of Capital Concept of the Cost of Capital Computing a Firm’s Cost of Capital Cost of Individual Sources of Capital Optimal Capital Structure.
Chapter 8 The Cost of Capital Fin 320 Dr. B. Asiri © 2005 Thomson/South-Western.
Chapter 10 Choices Involving Time Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
$$ Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Capital Budgeting.
Contemporary Engineering Economics, 4 th edition, © 2007 Cost of Capital Lecture No. 61 Chapter 15 Contemporary Engineering Economics Copyright © 2006.
NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA
Engineering Economy IEN255 Chapter 13 - Capital Budgeting Decisions  Capital Budgeting - involves decisions related to fixed assets  Capital Budgeting.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Chapter 8 Capital Asset Selection and Capital Budgeting.
Capital Budgeting: Decision Criteria
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Equivalence Lecture No.
Chapter 8 The Cost of Capital © 2005 Thomson/South-Western.
13-1 Chapter 13 Capital Budgeting Techniques © 2001 Prentice-Hall, Inc. Fundamentals of Financial Management, 11/e Created by: Gregory A. Kuhlemeyer, Ph.D.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Other Criteria for Capital Budgeting Text: Chapter 6.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Selection Analysis Method Course Outline 9.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks PRENTICE HALL ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital Budgeting.
Effects of Inflation on Project Cash Flows
Discounted Cash Flow Analysis
Capital Budgeting Techniques
Presentation transcript:

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR and Capital Budgeting Lecture No. 51 Chapter 15 Contemporary Engineering Economics Copyright © 2016

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Review: What is MARR? MARR, Minimum Attractive Rate of Return The required return necessary to make a capital budgeting project such as building a new factory worthwhile (profitable). It is commonly known as the discount rate (or the hurdle rate) for project evaluation. When evaluating a project whose risk is higher than normal, the MARR could be adjusted to reflect this additional risk (also known as a risk- adjusted discount rate).

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR: Overview o Choice of MARR when project financing is Known: Use i e as your MARR. o Choice of MARR when project financing is Unknown: Use k as your MARR o Choice of MARR under Capital Rationing: It depends on the lending and borrowing opportunities.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 15.8: Choice of MARR when Project Financing Is Known  Given: Project cash flow information and i e = 19.96%  Find: Net equity cash flow and justify the project based on i e.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Solution Explicit accounts for debt flows Equity flow

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 15.9: Choice of MARR when Project Financing Is Unknown  Given: Cash flow information, debt ratio = 0.40, amount of financing required = $150,000  Find: Justify the project based on the cost of capital.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Solution Without explicitly treating the debt flows, make a tax adjustment to the discount rate, using the weighted cost of capital k.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR Under Capital Rationing

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 15.10: Determining an Appropriate MARR as a Function of the Budget  Given: Investment opportunities with estimated IRRs  Find: Correct MARR to use as a function of budget available o Borrowing rate (k) = 10% o Lending rate (l) = 6%

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Solution An investment opportunity schedule ranking alternatives by the RORs

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved MARR as a Function of Budget Available Budget Projects Selected Correct MARR to Use $40,0001,2,3, and 4MARR = 8% $60,0001,2,3, 4 and 5MARR = l = 6% $01 and 2MARR = k = 10% A range of MARR as a function of a budget

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Capital Budgeting: Key Issues Evaluation of Multiple Investment Alternatives o Independent projects o Dependent projects Formulation of Mutually Exclusive Alternatives Capital Budgeting Decisions with Limited Budgets

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Formulation of Mutually Exclusive Alternatives  Independent Projects: Projects A and B are independent.  Dependent Projects: (A1,A2) and (B1,B2) are mutually exclusive  Dependent Projects: C is contingent on the acceptance of both A and B.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 15.11: Four Energy Saving Projects Under Budget Constraints (Budget Limit = $250,000)  Given: IRRs for four different energy projects  Find: (1) Optimal capital budget without budget limit; (2) best alternative with a $250,000 budget limit

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Best Alternative with a $250,000 Budget Limit Mutually Exclusive Decision Alternatives Marginal Cost of Capital

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Summary The selection of an appropriate MARR depends generally upon the cost of capital—the rate the firm must pay to various sources for the use of capital. The cost of equity (i e ) is used when debt-financing methods and repayment schedules are known explicitly. The cost of capital (k) is used when exact financing methods are unknown, but a firm keeps it capital structure on target. In this situation, a project’s after-tax cash flows contain no debt cash flows such as principal and interest payment. Under the capital rationing, the choice of MARR is determined by the marginal cost of capital as a function of budget.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Under conditions of capital rationing, the selection of MARR is more difficult, but generally the following possibilities exist : ConditionsMARR A firm borrows some capital from lending institutions at the borrowing rate, k, and some from its investment pool at the lending rate, l. l <MARR< k A firm borrows all capital from lending institutions at the borrowing rate, k. MARR = k A firm borrows all capital from its investment pool at the lending rate, l. MARR = l

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved The cost of capital used in the capital budgeting process is determined at the intersection of the IOS and MCC schedules. If the cost of capital at the intersection is used, then the firm will make correct accept/reject decisions, and its level of financing and investment will be optimal. This view assumes that the firm can invest and borrow at the rate where the two curves intersect.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved If a strict budget is placed in a capital budgeting problem and no projects can be taken in part, all feasible investment decision scenarios need to be enumerated. Depending upon each investment scenario, the cost of capital will also likely change. Our task is to find the best investment scenario in light of a changing cost of capital environment. As the number of projects to consider increases, we may eventually resort to a more advanced technique, such as a mathematical programming procedure.