ELI-NP: the way ahead, 10-12 March 2011 1 Anna Ferrari An overview of the shielding problems around high energy laser-accelerated beams Anna Ferrari Institute.

Slides:



Advertisements
Similar presentations
Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
The scaling of LWFA in the ultra-relativistic blowout regime: Generation of Gev to TeV monoenergetic electron beams W.Lu, M.Tzoufras, F.S.Tsung, C. Joshi,
EAR2 simulation update Collaboration board meeting Christina Weiss & Vasilis Vlachoudis.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
FLUKA radioprotection calculations Maria – Ana Popovici Politehnica University of Bucharest.
Energy deposition and neutron background studies for a low energy proton therapy facility Roxana Rata*, Roger Barlow* * International Institute for Accelerator.
Particle-Driven Plasma Wakefield Acceleration James Holloway University College London, London, UK PhD Supervisors: Professor Matthew wing University College.
FLUKA status and plan Sixth TLEP workshop CERN, October 2013 F. Cerutti #, A. Ferrari #, L. Lari *, A. Mereghetti # # EN Dept. & *BE Dept.
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Pion yield studies for proton drive beams of 2-8 GeV kinetic energy for stopped muon and low-energy muon decay experiments Sergei Striganov Fermilab Workshop.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Impact of synchrotron radiation in LEPTON COLLIDER arcs
Introduction Simulation Results Conclusion Hybrid Source Studies Olivier Dadoun A. Variola, F. Poirier, I. Chaikovska,
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
Future of Antiproton Triggered Fusion Propulsion Brice Cassenti & Terry Kammash University of Connecticut & University of Michigan.
Energy deposition for intense muon sources (chicane + the rest of the front end) Pavel Snopok Illinois Institute of Technology and Fermilab December 4,
1 Dr. Sandro Sandri (President of Italian Association of Radiation Protection, AIRP) Head, Radiation Protection Laboratory, IRP FUAC Frascati ENEA – Radiation.
FNAL, May 10, Introduction for Beam Diagnostics Laboratory Main Mission: R&D on charged particle beam diagnostics for e + /e - linear colliders.
Studies of Muon-Induced Radioactivity at NuMI David Boehnlein Fermi National Accelerator Laboratory (on behalf of the JASMIN Collaboration) NuFact09 –
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
Tungsten Calorimeter Model Calculations and Radiation Issues Pavel Degtiarenko Radiation Control Group, Jefferson Lab.
Simulations on “Energy plus Transmutation” setup, 1.5 GeV Mitja Majerle
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
Classical and quantum electrodynamics e®ects in intense laser pulses Antonino Di Piazza Workshop on Petawatt Lasers at Hard X-Ray Sources Dresden, September.
W.Lu, M.Tzoufras, F.S.Tsung, C.Joshi, W.B.Mori
Monte Carlo methods in ADS experiments Study for state exam 2008 Mitja Majerle “Phasotron” and “Energy Plus Transmutation” setups (schematic drawings)
Systematic studies of neutrons produced in the Pb/U assembly irradiated by relativistic protons and deuterons. Vladimír Wagner Nuclear physics institute.
Update for muon studies Helmut Vincke. Additional dump calculations Two options were studied: Option 1: beam is bend by 2 degree towards soil and beam.
Experimental Studies of Spatial Distributions of Neutrons Produced by Set-ups with Thick Lead Target Irradiated by Relativistic Protons Vladimír Wagner.
Initial (FLUKA) calculations for synchrotron radiation at TLep April 4 th, 2013 F. Cerutti, A. Ferrari, L. Lari* *BE Dept.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Authorization and Inspection of Cyclotron Facilities Radiation Fields.
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
1 Neutron Effective Dose calculation behind Concrete Shielding of Charge Particle Accelerators with Energy up to 100 MeV V. E Aleinikov, L. G. Beskrovnaja,
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
Simulations on “Energy plus Transmutation” setup, 1.5 GeV Mitja Majerle, V Wagner, A Krása, F Křížek This document can be downloaded.
Radiation Shielding Assessment for MuCool Experimental Enclosure C. Johnstone 1), I. Rakhno 2) 1) Fermi National Accelerator Laboratory, Batavia, Illinois.
ASW August 12, 2008 Impact of amended 10CFR835 on neutron calculations and measurements at high energy electron accelerators A. Fassò SLAC, Radiation Protection.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Radiation study of the TPC electronics Georgios Tsiledakis, GSI.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
AWAKE: D2E for Alexey beam properties Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke DGS/RP.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
1 Activation by Medium Energy Beams V. Chetvertkova, E. Mustafin, I. Strasik (GSI, B eschleunigerphysik), L. Latysheva, N. Sobolevskiy (INR RAS), U. Ratzinger.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
N_TOF EAR-1 Simulations The “γ-flash” A. Tsinganis (CERN/NTUA), C. Guerrero (CERN), V. Vlachoudis (CERN) n_TOF Annual Collaboration Meeting Lisbon, December.
Neutron double differential distributions, dose rates and specific activities from accelerator components irradiated by 50 – 400 MeV protons F. Cerutti.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Primary Radiation Calculation for Sun Yat-Sen Proton Hospital
Heating and radiological
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
Measurements and FLUKA Simulations of Bismuth and Aluminum Activation at the CERN Shielding Benchmark Facility(CSBF) E. Iliopoulou, R. Froeschl, M. Brugger,
Radiation protection of Linac4 M. Silari Radiation Protection Group
Electron Beamlines Safety Workshop at ELI Beamlines April 2016
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Update on GEp GEM Background Rates
Radiation fields During 1st stage beam commissioning
CEPC Radiation and Shielding
Presentation transcript:

ELI-NP: the way ahead, March Anna Ferrari An overview of the shielding problems around high energy laser-accelerated beams Anna Ferrari Institute of Safety Research and Institute of Radiation Physics Helmholtz-Zentrum Dresden-Rossendorf, Germany

ELI-NP: the way ahead, March Anna Ferrari  Key aspects in the shielding strategy  The example of the ELI facility in Czech Republic: Outline A look at the facility Characterization of the source terms for the electron and the proton case FLUKA Monte Carlo simulation to optimize the longitudinal shielding

ELI-NP: the way ahead, March Anna Ferrari We have to deal with a rapidly evolving field, where many parameters that are important for the radiation protection cannot be completely frozen at this stage: - Conservative and rigorous approach (realistic, not pessimistic) - Flexible solutions where possible Key aspects in the shielding strategy  evaluated spectra of the secondary particles can evolve (  source terms characterization can evolve !)  the workload (shots/day) can increase with the increased experience and technological improvements

ELI-NP: the way ahead, March Anna Ferrari A look at the design of the ELI facility in Czech Republic

ELI-NP: the way ahead, March Anna Ferrari Target areas e - acceleration area Proton acceleration area

ELI-NP: the way ahead, March Anna Ferrari  0.1 Hz proton beamlines Laser parameters: 1.5 kJ, 30 fs, 50 PW, =0.8  m, 5x10 23 W/cm2 Target parameters: 1  m, solid H Proton beam parameters: Ecut-off = 4 GeV, h = 20% (Davis et al., 40 fs, 5x10 23 W/cm 2,1 mm - H) Ecut-off = 3.7 GeV (OSIRIS sim., 15 fs, 5x10 23 W/cm2) Assumptions for simulations: 3 GeV (rectangular distribution), 6x10 11 p/pulse,  E = 300 MeV, Div.=40° Definition of the source terms: the most critical cases in energy  0.1 Hz electron beamlines Laser parameters: 300 J, 280 fs,  1 PW, =0.8  m, f=130 mm, f/# >100, a 0 =2 Acceleration Regime: Blowout regime, external injection, L acc =530 cm Electron beam parameters: 41 GeV, 1.3 nC Assumptions for simulations: 50 GeV (Gaussian distribution), 1.5 nC,  E/E=10%, Div.=1°

ELI-NP: the way ahead, March Anna Ferrari  10 Hz proton beamlines Laser parameters: 50 J, 20 fs, 2.5 PW, =0.8  m, W/cm 2 Target parameters: 1  m, solid H Proton beam parameters: Ecut-off = 500 MeV, h = 35% (Davis et al., 40 fs, W/cm 2,1  m - H) Assumptions for simulations: 200 MeV (rectangular distribution), p/pulse,  E = 10 MeV, Div.=4° Definition of the source terms: the most critical cases in intensity  10 Hz electron beamlines Laser parameters: 50 J, 80 fs,  0.6 PW, =0.8  m, f=130 mm, f/#  40, a 0 =5 Acceleration Regime: Blowout regime, self injection Electron beam parameters: 3.7 GeV, 1 nC Assumptions for simulations: 5 GeV (Gaussian distribution), 1 nC,  E/E=10%, Div.=1°

ELI-NP: the way ahead, March Anna Ferrari Reasonable actual assumptions for the beamline working time: 0.1 Hz: 100 shots/day (  15 min/day) 10 Hz: 6000 shots/day (10 min/day) Project goals: Public: 0.1 mSv/year (1/10 of the legal limit) Workers: 1 mSv/year A factor 10 has been “implicitly” taken into account, in view of future development Operational time and dose limits

ELI-NP: the way ahead, March Anna Ferrari Steps of the radiation protection Monte Carlo calculations 1. Characterization of the source terms for the Monte Carlo, realistic description of the chamber around (Astra GEMINI model has been assumed) 2. Characterization of a beam dump model, to be optimized for the material choice and dimensions (it must guarantee the appropriate longitudinal and lateral radiation containment) 3. Evaluation of the fluences of the secondary fields and of the total doses (in terms of Ambient Dose Equivalent)

ELI-NP: the way ahead, March Anna Ferrari Fluence - H*(10) conversion coefficients in FLUKA Conversion coefficients from fluence to ambient dose equivalent are based on ICRP74 values and values calculated by M.Pelliccioni. They are implemented for protons, neutrons, charged pions, muons, photons, electrons (conversion coefficients for other particles are approximated by these). In the card: AMB74 is the default choice for dose equivalent calculation

ELI-NP: the way ahead, March Anna Ferrari Main contributors and problems of a monomaterial dump 50 GeV case dN/dlogE d  (part GeV -1 sr -1 per primary Muons exiting from the dump E(GeV) Processes included: - muon production from pion decay - direct photomuon production Muons Muon fluence rate (muon cm -2 s -1 ) Monomaterial dump in AISI-316L, 4 m long

ELI-NP: the way ahead, March Anna Ferrari Main contributors and problems of a monomaterial dump Neutron fluence rate (neutrons cm -2 s -1 ) 50 GeV case Huge amount of backscattered radiation Neutrons

ELI-NP: the way ahead, March Anna Ferrari 10 nSv/day  if 1 y = 300 days (10 months), we have only 3  Sv/y ! Even if this solution is satisfactory under the point of view of the dose rate beyond the shielding wall, it is not good under the point of view of the backscattered radiation and of the induced radioactivity

ELI-NP: the way ahead, March Anna Ferrari Any solution good for the 50 GeV, 0.1 Hz case is automatically fully satisfactory for the 5 GeV, 10 Hz case 5 GeV case

ELI-NP: the way ahead, March Anna Ferrari The idea of a multimaterial dump II. use borated polyethylene in the external part to absorb the moderated neutrons coming from the center of the dump I. use not only one material at high Z but a suitable soft material (high density graphite) as dump core (surrounded by a high-Z shielding). Advantages: - smaller neutron yield - much less activation problems - energy deposition over a wider range the build-up region of the secondary radiation produced in the interaction with beam dump moves toward the central part of the dump, with a more effective shielding (the hardest part of the secondary radiation is confined inside the dump  autoshielding effect)

ELI-NP: the way ahead, March Anna Ferrari Results I : 50 GeV electrons, 0.1 Hz 60 cm borated polyetilene E(GeV)

ELI-NP: the way ahead, March Anna Ferrari 10 nSv/day in the 100 shots/day hypothesis in the 1000 shots/day hypothesis, only 100 nSv/day 3-mat dump: - borated polyethylene - core in carbon fiber surrounded by AISI-316L Source Pipe end Dump Poly-Bor + C St. steel Wall 0.01  Sv/d H*(10) longitudinal profile

ELI-NP: the way ahead, March Anna Ferrari Results II : 3 GeV protons, 0.1 Hz Neutron fluence Proton fluence 3-mat dump: - borated polyethylene - carbon fiber - AISI-316L

ELI-NP: the way ahead, March Anna Ferrari H*(10) rate in the 1000 shots/day hyp. Ambient dose equivalent rate

ELI-NP: the way ahead, March Anna Ferrari Conclusions Main aspects of the shielding assessment in target areas of the ELI-Czech Republic facility have been fixed: the source terms for electron and proton beams have been set the shielding study in the electron and in the proton hall is almost complete in the worst cases (in energy and in beam intensity): the choice of of a 3-mat structure (borated polyethylene + a core in carbon fiber surrounded by a cylinder in stainless steel/iron ) is optimal for the dump design both in the electron and in the proton case we hope that this experience can be useful for the shielding assessment of the ELI-NP laser areas