TITRE Public Workshop on REMIT Ljubljana, 19 July 2012 Issues for the 2 nd edition of the ACER Guidance on the application of REMIT Volker Zuleger Seconded.

Slides:



Advertisements
Similar presentations
1 Progress report on Expert Groups on micro and macro household statistics WPNA meeting October 2011 Maryse FESSEAU (OECD – Statistic Directorate, National.
Advertisements

Pécs Midterm review of the achievements of the Hungarian Presidency of the Council of the European Union András Rozmer Department of Strategy.
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Regional Policy MS experts meeting on Implementing Act for ESIF financial instruments 26 September 2013.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
- GDP 2011 versus 2010 – increase by 5.5%
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
General questions from MS
Vision for the internal electricity market
TITRE Public Workshop on REMIT Ljubljana, 19 July 2012 Public consultation document on ACER recommendations on REMIT records of transactions and implementing.
European Union Cohesion Policy
1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
Electronic Filing of Differences(EFOD) System and Filing of Differences Task Force (FDTF) Air Navigation Bureau.
© Statistisches Bundesamt, B 2 / Institut für Forschung und Entwicklung in der Bundesstatistik Statistisches Bundesamt ESSnet on Preparation of Standardisation.
European Commission Enterprise and Industry # European Standardisation: Proposal for a Regulation Presentation to IMCO – 5 October 2011 European Commission.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Implementation of the Network Code Balancing in the Netherlands Marcel Neef 28 November 2013.
EU Developments Transmission Workgroup 3rd November 2011.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Nadia Konzali Project Coordinator, COSCAP-GS
LEI – Legal Entity Identifier 27 March Why a Legal Entity Identifier ? Driver: –New regulatory framework for swaps (US, Canada, Hong Kong, Australia.
1 MARINE STRATEGY FRAMEWORK DIRECTIVE (MSFD) COMMON IMPLEMENTATION STRATEGY MSFD regional data work flow: schema and examples Document: DIKE TSG1 WP4 MSFD.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Click to edit Master title style TITRE CEE IG – 20/02/2014 ACER Long-Term Rights Task Force Current status of the discussion with ENTSO-E.
European Commission, DG Energy Ewout Deurwaarder 29/06/2010 Biofuels in the EU Renewable Energy Directive - Update Energy crops advisory group EF/010/077.
3. Update on status and implications of NWE intraday project (selection of the solution for the platform) 11 th Implementation Group Meeting 1 st March.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
EU Developments Transmission Workgroup 6th October 2011.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
REMIT in practice: data collection, market monitoring and stakeholder responsibilities Erik Rakhou Seconded National expert, Market Monitoring Department.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Revision of WIPO Standard ST.14 Committee on WIPO Standards, third session Geneva 15 – 19 April 2013 Anna Graschenkova Standards Section.
Pilot Project – Energy Trade Data Reporting Scheme Background information Waler Boltz, Chairman CEER Gas Working Group 19th Madrid Forum March 2011.
National implementation of REMIT Henrik Nygaard, Wholesale and transmission (DERA)
The Regulation on wholesale Energy Market Integrity and Transparency (REMIT)
Position on Market integrity framework and transparency Florence Forum 6 December 2012 Robert Gersdorf.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
XVIII Madrid Forum Madrid, September 2010 Wholesale energy trading licenses in the EU Johannes Kindler, Vice-President Federal Network Agency Germany.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
REMIT Implementation in DONG Energy DERA Seminar, 27 April 2012 Marie-Louise Piil Christensen.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
Pilot project – Energy Trade Data Reporting Scheme 1 st Steering Committee Meeting Brussels, 5 October 2010.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
TITRE REMIT Seminar Copenhagen, 27 April 2012 ACER and the REMIT implementation in the EU Volker Zuleger Agency for the Cooperation of Energy Regulators.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
TITRE Workshop on the Agency’s Work Programme for 2014 Ljubljana, 6 June 2013 Alberto Pototschnig - Director Christophe Gence-Creux - Head of Electricity.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
REMIT IT implementation Outline. REMIT IT implementation: Overview Development of data collection and data sharing solution Implementation and customisation.
TITRE ACER: Mission, Structure and Activities Alberto Pototschnig Director E-Control Energy Dialogue Vienna, 7 December 2011.
Gas Regional Initiative South South-East
Regulators’ update on Congestion Management and Balancing
EU Regulation on AVAS requirements
Andrius Šimkus │ Energy Community Secretariat Tbilisi, 5 October 2018
Gas Regional Initiative South South-East
The role of the National Regulatory Authorities
Gas Regional Initiative South South-East
Presentation transcript:

TITRE Public Workshop on REMIT Ljubljana, 19 July 2012 Issues for the 2 nd edition of the ACER Guidance on the application of REMIT Volker Zuleger Seconded National Expert Axel Biegert Acting Chair of the Wholesale Market Surveillance TF

Outline. Background. Issues currently considered for the 2 nd edition of the ACER Guidance. Discussion paper on inside information platforms. The way ahead

ACER Guidance on the application of REMIT definitions according to Article 2 of REMIT. Legal basis: Art. 16(1) of REMIT. Describes ACERs understanding of the definitions of Art. 2 of REMIT, but does not provide legal interpretation (rules of practice, no rules of law). Directed to NRAs and intended only to establish a common understanding between ACER and NRAs on REMIT definitions (Art. 2). Published for sake of transparency

Potential issues of the 2 nd edition of the ACER Guidance. Review current understanding of market abuse definitions in the 1 st edition of the ACER guidance. Increase scope of ACER guidance to definitions ofmarket participant and wholesale energy product. Consider to increase the scope of the ACER Guidance beyond the application of REMIT definitions

Outline. Background. Issues currently considered for the 2 nd edition of the ACER Guidance. Discussion paper on inside information platforms. The way ahead

Rewiew of the application of REMIT market abuse definitions. Definition of inside information » versus transparency information to be published according to transparency guidelines » versus own plans and strategies for trading » in wholesale gas markets (e.g. production outages, reductions in upstream supply) and possibility of a volume threshold similar to the threshold in wholesale electricity markets (e.g. 10 mcm/d) » Update forms on delayed disclosure of inside information. Definition of market manipulation » In commodity markets, particularly concerning day- ahead markets

Increase scope of ACER guidance to definitions of market participant, wholesale energy market and wholesale energy product. Definition of market participant, in particular » in relation to the definition of final customer, » concerning its application in wholesale gas markets (e.g. Shippers, LSOs, SSOs), in view of the market participants obligation to disclose inside information » as regards its application to non-EU- and non-EEA market participants. Definitions of wholesale energy market and wholesale energy product, in particular » as regards the market segment coverage (e.g. balancing markets)

Issues going beyond the application of REMIT definitions. Scope of REMIT in view of new EU financial market legislation, Articles 1 and 8 of REMIT. Application of Article 3 of REMIT, in particular of the exemptions to Article 3(1) of REMIT. Application of Article 4 of REMIT, in particular concerning the disclosure of inside information in an effective and timely manner » Not further specified in REMIT » Goal: broad dissemination of information and effortless accessibility » Platform solution(s) for the publication of inside information discussion paper

Outline. Background. Issues currently considered for the 2 nd edition of the ACER Guidance. Discussion paper on inside information platforms. The way ahead

Platform Options for the publication of inside information Discussion Paper published 18 July 2012 Problem:. Lack of transparency through lack of platforms for disclosure of inside information. Existing transparency platforms often lack timeliness of disclosure. Differences in transparency and inside information Proposed Solutions:. Option A: Disclosure through existing and future transparency platforms. Option B: Nomination of national or regional platforms Written feedback welcome by 31 July 2012

Outline. Background. Issues currently considered for the 2 nd edition of the ACER Guidance. Discussion paper on inside information platforms. The way ahead

2 nd edition of ACER Guidance and Recommendations Timeline 19 July 2012Public Workshop Sept 2012 Publication of 2 nd edition of ACER Guidance and Recommendations

ACER milestones Mid 2013 Mid / / / 2013 Presumed COM proposal implementing acts OJ Publicatio n Entry into force of REMIT ACER determines and publishes data format for registration ACER recommendations on record of transactions etc Expected start of data collection through ACER under REMIT ACERs 1st edition of guidance on REMIT definitions Registration of market participants applies at the latest ACERs 2nd edition of guidance and recommendations Presumed adoption of implementing acts after comitology procedure MonitoringOperateDesignPlanBuild Further editions of ACER guidance on REMIT definitions if necessary

Discussion

Thank you for your attention Thank you for your attention!