System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System.

Slides:



Advertisements
Similar presentations
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Juan Valls 1 TOB System Test Status Report  DS ROD System Test Setup  DAQ Software  DS ROD Characterization PLL, FED Timing Scans OPTO Scans  Noise.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Layout of the Power Distribution on Support Tube for Phase I Lutz Feld, Waclaw Karpinski, Katja Klein, Jan Sammet, Michael Wlochal.
Calorimeter upgrade meeting – CERN – October 5 th 2010 Analog FE ASIC: first prototype Upgrade of the front end electronics of the LHCb calorimeter E.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Waclaw Karpinski General meeting CMS TRACKER SYSTEM TEST Outer Barrel –TOB Inner Barrel –TIB End cap –TEC TIB TOB TEC Different Geometries One.
Qualification Test of UFE Board  Schematic diagram of UFE  Board types and current status  Qualification test procedures  VA & UFE test setup 
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
ASIC Activities for the PANDA GSI Peter Wieczorek.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Calorimeter upgrade meeting – LAL /Orsay – December 17 th 2009 Low noise preamplifier Upgrade of the front end electronics of the LHCb calorimeter.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
GuidoTonelli /TK_GM/CERN/07_12_05 1 TIB/TID Status Report (on behalf of the INFN consortium) STATUS OF THE INTEGRATION ACTIVITY OF THE TIB/TID_FWD TIB-MTCC.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
LED notched fibre distributing system Calibration system for SiPM
Analog FE circuitry simulation
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
WP02 PRR: Master Oscillator and RF Reference Distribution
System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.
Status of the Front Tracker GEM
VeLo Analog Line Status
UCSB Testing Status Anthony Affolder
UCSB Short-term Testing Plan
Module production in Italy
UCSB Short-term Testing Plan
Outer Endcap External Bus tape
TIB contribution for the X5 - May 2003 Test Beam
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System Test Setup (TIB) Results from the TIB System Test

System Test Status Report R. D’Alessandro 2 TIB system test (July 2002) Not only for PS but “evolving” into a fully fledged mechanical and electrical test –NEEDS optical decoupling to achieve meaningful results At first we needed a relatively good understanding of an optical system compared to a copper one: –Many measurements made, we gained full confidence. –Thanks to Roberto Cecchi for TIST.

System Test Status Report R. D’Alessandro 3 La bara CCU25 DOH Power distribution PCB

System Test Status Report R. D’Alessandro 4 Input/Output temporary connections on the back of module carrier Final Kapton cable could be even shorter than this one Short distance APV-AOH Brico & Flexibility

System Test Status Report R. D’Alessandro 5Mechanics Prepared by Pisa Layer 3 mock-up Up to 4 cooling loops (12 modules) Final dimensions

System Test Status Report R. D’Alessandro 6 Mother Cable (1)

System Test Status Report R. D’Alessandro 7 Mother cable (2)

System Test Status Report R. D’Alessandro 8 Interconnect board Connects up to 4 MC Redundancy implemented Distributes also LV and HV Jumper disable of Hard Reset

System Test Status Report R. D’Alessandro 9 What went on the mechanical structure 3 modules: 180, 168, 177 (14 APV25) 3 Analog OptoHybrids (3 fibres each) 50 Ohms termination (100 Ohms in the future) 1 CCU25 + DOH + Interconnect Board Mother Cable with slight mods. Power: Caen (counting room) prototype 150 m cable LIC (100m Outer + 50m Inner) 40 uF TOTAL LOAD CAPACITORS! Battery for the control loop (5V for the DOH)

System Test Status Report R. D’Alessandro 10Cables

System Test Status Report R. D’Alessandro 11 CCU25 AOH Fibre SPAGHETTI! Cooling loops DLink 3Modules (complete MC)

System Test Status Report R. D’Alessandro 12Results Bias = 200 V on 3 modules simultaneously <1 microA total for the 3 modules HV test with 1 module to 300V, on MC without modules to 450V Able to read out pedestals and noise on all 3 modules at the same time Calibration one module at a time

System Test Status Report R. D’Alessandro 13Pedestals deconv peak Strip no. ADC value

System Test Status Report R. D’Alessandro 14 Common mode noise Module 180 Module V bias non-inv, peak ADC channels

System Test Status Report R. D’Alessandro 15 50nF cap 22k  Bias line Analog opto hybrid TIB System test in Florence

System Test Status Report R. D’Alessandro 16 New TIB hybrid layout (Dec v11) Bias ring DCU input From J.D. Berst

System Test Status Report R. D’Alessandro 17 First and last strip  ~12 ADC counts Unbonded strips 2 noisy neighbours TIB HV 300V on ARC Peak-Inverter on

System Test Status Report R. D’Alessandro 18 Edge effect reduced Furthermore only one strip is now affected …also the common mode is reduced Same module but with 50nF capacitor to ground

System Test Status Report R. D’Alessandro 19 Same module on sys-test Module 180 without cap Module 177 with cap Peak mode

System Test Status Report R. D’Alessandro 20 Signal shapes ADC value ns

System Test Status Report R. D’Alessandro 21 Noise distribution (1) Peak mode Noise very low CMN is lower still S/N ratio Peak ~ 65 Ical=80! ADC channels

System Test Status Report R. D’Alessandro 22 Noise distribution (2) Deconv mode S/N ratio Deconv ~ 52 Ical=80! ADC channels

System Test Status Report R. D’Alessandro 23 LV behaviour HARD RES (14 APVs + 9 Lasers)  V=280 mV 2.5V 200 mV/div 200 us/div 10 mV/div 20 us/div Noise on 2.5V line

System Test Status Report R. D’Alessandro 24Conclusions So far we have witnessed an excellent behaviour of the system. Mother Cable is very well thought out, signals are clean, voltage drops negligeable. (Thanks to Giuseppe De Robertis) The interconnect board has delivered at first go. (Thanks to Roberto Ciaranfi) This Pisa-Florence common endeavour is getting along fine (incredible though this might seem)

System Test Status Report R. D’Alessandro 25Future Need to go to 4 strings (12 modules) –MC are being loaded with components Test redundancy (2 nd DOH and CCU25s from CERN) AOHs will be modified (100 Ohms) We have started Xdaq migration. This mock-up will be upgraded, while a new one is under construction ready for the next MC type. New MC being designed (final version …) DOM (DOH carrier) design underway

System Test Status Report R. D’Alessandro 26 Interconnect Board (redundancy is implemented)