DAPPOLONIA S.p.A Tsunami Early Warning System Info Day UNESCO/IOC, Paris 31 January 2006.

Slides:



Advertisements
Similar presentations
Review of Science and Technical Progress from Tsunami Risk Perspective Preparatory Workshop on Science and Technology for the Global Platform for Disaster.
Advertisements

DS-01 Disaster Risk Reduction and Early Warning Definition
FIAR International Insurance- Reinsurance Forum 2013 Nat Cat mitigation programs in Bulgaria Roumen Galabinov.
Comparative Emergency Management
1 NEST New and emerging science and technology EUROPEAN COMMISSION - 6th Framework programme : Anticipating Scientific and Technological Needs.
LIAM (Environmental and Maritime Hydraulics Laboratory) L’Aquila, (Italy) Prof. Ing. Paolo De Girolamo Type.
Remote Sensing Solutions. Story Turnover : 2 Millions euro Personnel: 15 persons Flyby is an independent private Italian SME company funded in Mission.
Establishing Research Priorities for Public Health Emergency Preparedness in Canada: Results of a Scoping Review and Priority- Setting Meeting Yasmin Khan,
Integrated Risk Management and Risk Communications David DeGagne, Executive Director Centre for Risk Management Tel: Fax: Web:
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
President’s Proposed Expansion of Tsunami Warning System Eddie Bernard Director, Pacific Marine Environmental Laboratory (PMEL)/NOAA Member, National Tsunami.
Together advancing small enterprise development. Who is Seda  Established in 2004  Government Agency – Falls under Department of Trade and Industry.
9/2/2010Innovative and Successful Partnerships SummitPage 1 Johnson Space Center Johnson Space Center Capabilities and Partnerships Ellen Ochoa Deputy.
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
Tsunami Warning System Elements IOC Assessment Mission to Indonesia 29 August-1 September 2005.
Bratislava October 2007 PAR - AC CoP Meeting Anti Corruption Regional Programme Regional Programme.
Emergency Management Information System - EMIS
Successful Case Partner: Provincia di Lecce Business: SPACEDAT s.r.l.
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
Nurjana Technologies Company Presentation. Nurjana Technologies (NT) is a small business enterprise founded in 2012 and operating in Aerospace and Defence.
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
MITIGATION PREPAREDNESS RESPONSE RECOVERY FOUR PHASES OF EMERGENCY MANAGEMENT Pre-event Post event Pre-event.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Towards a Tsunami Warning and Mitigation System in the Indian Ocean IOC of UNESCO.
Tsunami Warning and Mitigation System Masahiro Yamamoto Tsunami Unit Intergovernmental Oceanographic Commission (IOC) UNESCO.
Leveraging research and future funding opportunities Hajo Eicken Geophysical Institute & International Arctic Research Center University of Alaska Fairbanks.
NOAA’s Role in Weather Forecasting and Community Preparedness Decision Support NOAA remains focused on supporting high impact events where weather is a.
SERIT Contributo per la preparazione di HORIZON 2020 Cultural Heritage and Built Environment Francesco Soldovieri, Laura Moltedo.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Commerce and Transportation.
COOPERATION AND INFORMATION EXCHANGE BETWEEN ROMANIA, CANDIDATES COUNTRIES AND WESTERN BALKANS COUNTRIES.
CIMNE International Center for Numerical Methods in Engineering Public RTD Cecilia Soriano - RTD Manager SC7 TOPIC - DRS
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
GEOSCIENCES CONSULTANTS sarl Paris, France Type of organisation: mixed group of partners : private, research, universities and NGO Specialising in: Assessment.
Regional Capacity Building Activities in the Caribbean UNFCCC Expert Workshop on Monitoring and Evaluating Capacity- building in Developing Countries Carlos.
Slide: 1 Community Civil Protection Mechanism & Civil Protection Financial Instrument Community Civil Protection Mechanism & Civil Protection Financial.
1 NEST New and emerging science and technology EUROPEAN COMMISSION - 6th Framework programme : Anticipating Scientific and Technological Needs.
REDUCING DISASTER RISK THROUGH EFFECTIVE USE OF EARTH OBSERVATIONS Helen M. Wood Chair, U.S. Subcommittee on Disaster Reduction August.
U.S. National Tsunami Hazard Mitigation Program 5-Year Review David Green, NOAA Tsunami Program Manager National Oceanic and Atmospheric Administration.
Coastal Adaptation in the tourism industry of the Seychelles Mr. Alain De Comarmond Ministry of Environment and Natural Resources Republic of Seychelles.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
Wessex Institute of Technology Southampton, (UK) Internationally recognised organisation dedicated to advanced research and training on the computational.
Insert Date 1 Hurricanes-Inundation Overview Objectives: Improve forecasts of tropical cyclones and related inundation hazards to enhance mitigation decisions.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Implementing Successful Preparedness Exercises. Objectives To increase knowledge of exercising and how to create an effective exercise program To provide.
IOC Expert Missions May-August, 2005 UNESCO IOC TSUNAMI PROGRAMME.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
What is Emergency ?. A serious situation or occurrence that happens unexpectedly and demands immediate action.
A Brief Overview of Emergency Management Office of Emergency Management September 2004 Prepared By: Marybeth Solesbee, CEM.
Simulations In the Areas of Training, Entertainment, and Scientific Research.
Technology Forecasting. Forecasting predict or estimate a future event or trend. "rain is forecast for Lahore“ The use of historic data to determine the.
Recreation & Security HPR 413. General Security Must encompass all operations of the organization Should be written into management plans – Plans include.
Disaster Mitigation Competence Centre Project Meeting Coordinator: Simon Lin March 31, 2015.
Preparation of Drought Vulnerability Assessment Study to Develop Iraq National Framework for Integrated Drought Risk Management (DRM) PAVING THE WAY FOR.
1 Office of ASG/CITO Crisis Information Management Strategy UNGIWG-11, Geneva 15 March 2011 A written consent by the UN is required to use the information.
N€TFINT€X 2007 INSME Annual Meeting “Reinvigorating our Global Partnership for Innovation Transnational Technology Transfer and Innovation Financing New.
Risks and Hazards to Consider Unit 3. Visual 3.1 Unit 3 Overview This unit describes:  The importance of identifying and analyzing possible hazards that.
Rafael Gamboa González
Salvatore Stramondo Satellite Earth Observation unit
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
International Exercise on Post-earthquake Damage Assessment
Preparedness WFP Logistics, We Deliver.
Pacific Power Seismic Preparedness Update
Strengthening Early Warning Systems in Europe
VII. Earthquake Mitigation
Earthquake and Tsunami Program Governor’s Office of Emergency Services
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
Review and analysis of seismic alert communication issues
ABCPhD Doctoral Program in architecture, built environment and construction engineering ABCPhD Call4Scholarship 34 RESEARCH TOPIC: Automation, Robotics.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

DAPPOLONIA S.p.A Tsunami Early Warning System Info Day UNESCO/IOC, Paris 31 January 2006

Company overview DAppolonia DAppolonia is an engineering company founded in Pittsburgh in 1956 by Prof. Elio DAppolonia Italian private company with over 250 staff (190 engineers) Since 1982 DAppolonia S.p.A. is an Italian private company with over 250 staff (190 engineers) and 5 offices in Italy COMPANY OVERVIEW

The objective of an Integrated Simulation System is to validate Tsunami detection capabilities and related performance of the Monitoring and Alert Systems and to improve alert capacity and preparedness of equipment/interventions teams, by providing a set of facilities to: Tests of equipment in case of complex scenarios and critical events; Improving a common understanding of how to best conduct/manage missions/emergency situations; Supporting Training exercises among staff/intervention teams to improve their preparedness and response capabilities to critical events (repeat training exercises more than one time); Supporting new systems development. Integrated Simulation System for Tsunami Monitoring and Alert Center An Integrated Simulation System is composed by simulators and real equipment stimulated by a common synthetic environmental scenario.

Example of Integrated Simulation System for Tsunami Alert and Monitoring Center (1/2) Example of Integrated Simulation System for Tsunami Alert and Monitoring Center (1/2) Deep Sea Buoy Satellite Processing Unit Simulator Surface Wave Radar Simulator Integrated Simulation System Surface Wave Radar Processing Unit Deep Sea Buoy Satellite data Processing Unit Tsunami Allert Center Real Sensors Acquisition System Switch

Probabilistic and statistical approaches to estimate tsunami potential and impact D'Appolonia's main interest is development of probabilistic methodologies to evaluate tsunami impact hazard. The firm has matured experience regarding probabilistic hazard analysis in the fields of earthquake engineering, industrial HSE and mechanical reliability/availability. The main thrust of our work will be to study tsunami runup data to develop empirical/statistical wave height attenuation correlations, and implement them in a probabilistic framework to evaluate tsunami hazard. DAppolonia proposes to look at the problem in a different way, applying techniques developed for earthquake hazard assessment.

Probabilistic and statistical approaches to estimate tsunami potential and impact Statistical analysis of tsunami variability One of the main issues for risk assessment is the uncertainty regarding potential tsunami impacts at a site. Estimates of the inherent uncertainty in the phenomena are required for any serious attempt to produce probabilistic tsunami hazard mapping. PTHA Methodology A Probabilistic Tsunami Hazard Analysis (PTHA) approach, once fully developed and validated, would provide a rational framework for designing tsunami risk mitigation measures. The PTHA methodology to be developed will be similar to the well established Probabilistic Seismic Hazard Analysis (PSHA). Risk assessment and management strategy Design of a rational decision making framework for mitigation of tsunami risk.

Innovation Management Experience Success Rate 100% In the new EC instrument: Integrated Project for sectoral innovation DAppolonia is participating in projects for Innovative Product Development since 1997 both in co-funded research programs at European level and in consulting services for industry More than 35 innovative ideas selected over 200 proposals from industry, developed from idea to field test, IPR control, and market exploitation Success Rate 80% In medium sized projects (for NPD) 5 Times Better Than The Average Applicant Company overview