Www.turkuai.fi WSC Trade description in electronics History Finland participated first time 1995 Lyon Not in St. Gallen 1997 Montreal 1999 Seuol 2001 St.Gallen.

Slides:



Advertisements
Similar presentations
ARCHITECTURES FOR ARTIFICIAL INTELLIGENCE SYSTEMS
Advertisements

Ch:8 Design Concepts S.W Design should have following quality attribute: Functionality Usability Reliability Performance Supportability (extensibility,
Personal Project REPORT.
Functional Skills Support Programme OfQual Functional Skills Qualifications Criteria – Issued November 2009.
EECE **** Embedded System Design
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
Electronic Workshop Team The demo consists of Abloy door automatics and Deltabit fingerprint recognition electronics. The competition task.
CCCS = California Common Core Standards.  Common Core standards corresponds with the original NCLB timeline of 2014  Students need real world skills.
Project Proposal.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
ABSTRACT The goal of this project was to create a more realistic and interactive appliance interface for a Usability Science class here at Union. Usability.
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
Introduction to Computers and Programming. Some definitions Algorithm: –A procedure for solving a problem –A sequence of discrete steps that defines such.
©TheMcGraw-Hill Companies, Inc. Permission required for reproduction or display. COMPSCI 125 Introduction to Computer Science I.
Software Engineering CSE470: Systems Engineering 35 Computer System Engineering Computer System Engineering is a problem-solving activity. Itemize desired.
How the Social Studies Interns are Viewed by their Mentors Going Public Presentation Mike Broda, Mark Helmsing, Chris Kaiser, and Claire Yates.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
We make hot joints.. 2 Who we are. Originally part of a leading international handheld repair and rapid prototyping company, Repair point was formed *
1. Learning Outcomes At the end of this lecture, you should be able to: –Define the term “Usability Engineering” –Describe the various steps involved.
SYSTEM ANALYSIS AND DESIGN
Solid Performance Solutions This presentation was created to give you the ideas and support to present “Rethinking New Product Training Development” in.
S/W Project Management
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Instructional Design Eyad Hakami. Instructional Design Instructional design is a systematic process by which educational materials are created, developed,
Requirements Analysis
Trends in Preserving Scholarly Electronic Journals 1. Golnessa GALYANI MOGHADDAM Shahed University Dept. of Library and Information Science, Shahed University,
COE4OI5 Engineering Design. Copyright S. Shirani 2 Course Outline Design process, design of digital hardware Programmable logic technology Altera’s UP2.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Configuration Management (CM)
Measuring Complex Achievement
The European Credit system The European Credit system for Vocational Education and Training (ECVET)
Level 2 Unit 3 Engineering Applications of Computers Engineering Diploma Level 2 Unit 3 Engineering Applications of Computers In this unit you will discover.
Software Engineering Saeed Akhtar The University of Lahore Lecture 7 Originally shared for: mashhoood.webs.com.
Welcome to Mechanical Drawing, & Computer Assisted Drafting With Mrs. Denyer.
Student Portfolio Development. Portfolio Development Define the following: Portfolio Artifact Evidence Medium Annotation Design Analysis STUDENTS: Write.
Rapid software development 1. Topics covered Agile methods Extreme programming Rapid application development Software prototyping 2.
Paul E. Sollock1 FOUR DECADES OF EVOLUTION TOWARD FLEXIWARE ( From the perspective of an Apollo, Shuttle, ISS and Shuttle Upgrades Veteran) Definitions.
1 Engineering Design - A general approach. 2 Outline Form a group Proposal (Presentation and 1 st Mandatory Meeting) Milestone A (Demo A and 2 nd Mandatory.
Technology The practical use of human knowledge to extend human abilities and to satisfy human needs and wan ts.
 Read through problems  Identify problems you think your team has the capacity and interest to solve  Prioritize the problems and indicate the.
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
EuroSkills and EWT (Electronics Workshop Team) Why new trade proposal? On the basis of the experiences gained through the ModVoc project,
CMSC 345 Fall 2000 Requirements Overview. Work with customers to elicit requirements by asking questions, demonstrating similar systems, developing prototypes,
LESSON 3. Properties of Well-Engineered Software The attributes or properties of a software product are characteristics displayed by the product once.
Researching and Writing Dissertations Roy Horn Researching and Writing Dissertations.
How Much Do We know about Our Textbook? Zhang Lu.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Electronic Drafting DFT 58A&B Cliff Monroe - Instructor.
Topic 4 - Database Design Unit 1 – Database Analysis and Design Advanced Higher Information Systems St Kentigern’s Academy.
Winter 2011SEG Chapter 11 Chapter 1 (Part 1) Review from previous courses Subject 1: The Software Development Process.
Welcome to Architectural, Technical Drawing & Computer Assisted Drafting With Mrs. Denyer.
. Thematic Working Group 4 Possible Elements – Chapter VI: Constraints, gaps and related financial, technical and capacity needs CGE Workshop to exchange.
Requirement Engineering
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Job Analysis Chapter.
The FIFA World Cup kicks off in South Africa on 11 June.
M211 – Central Processing Unit
Information Systems in Organizations 1.2 What’s in it for you? 1.3 Ethics of analysis and use of systems, data and information.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
1 DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT Digital Tachograph : Information Seminar Budapest, 25-26/02/20009 Digitac.
1 Chapter 2 SW Process Models. 2 Objectives  Understand various process models  Understand the pros and cons of each model  Evaluate the applicability.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Computer Systems Architecture Edited by Original lecture by Ian Sunley Areas: Computer users Basic topics What is a computer?
Victoria Ibarra Mat:  Generally, Computer hardware is divided into four main functional areas. These are:  Input devices Input devices  Output.
By: Wilmer Arellano.  1. Form a team  2. Find a Team Leader  3. Find Three Potential Topics  4. Find a Mentor  5. Select a Topic.
Fern Albery-S Tess Downes-S Matthew Kelly-S
Machine Elements in Mechanical Design Prepared by: Misrty Dipen
Materials and systems Pathway Subject(s): VCE Systems Engineering
Software Life Cycle Models
ISTE Workshop Research Methods in Educational Technology
<Your Team # > Your Team Name Here
Presentation transcript:

WSC Trade description in electronics History Finland participated first time 1995 Lyon Not in St. Gallen 1997 Montreal 1999 Seuol 2001 St.Gallen 2003 Helsinki 2005 Finland WSC-expert Olavi Lähteinen, since 1999 Montreal Trade Manager since 2002

WSC Trade description in electronics The Technical Description consists of the following: Section 1 – Technical/Competition Description (TD) Section 2 – Project Design Criteria (PD) Section 3 – Skill Management Procedures (SM) Section 4 – Workshop Setup (WS) Section 5 – Infrastructure List (IL) Section 6 – Appendices Part (TD) includes the following sections in Electronics (defined for the WSC Helsinki: B/ Drawing/ 2 hours/ 10 points C/ Prototype/ 6 hours/ 30 points D/ Fault finding/ measurement/ 6 hours/ 30 points E/ Assembly project/ 6 hours/ 20 points

WSC Trade description in electronics The selection of the projects With the development of the branch being rapid, the projects of electronics are not selected until the start of the competition at the competition-site; projects that are tightly agreed upon too early tend to become obsolete very quickly. An appropriate number of prepared suggestions for projects are agreed on between the participating countries. The actual competition projects will then be selected from these proposals. This selection process significantly effects the contents of the final tasks.

WSC Trade description in electronics Montreal 1999, Seoul 2001, St.Gallen Assembly task, assembly according to the assembling instructions, to be completed in 6 hours (15 p) 2. Drawing, drawing, interpretation of PCB parts layout and creation of circuit diagram based on this, to be completed in 2 hours ( 10 p.) 3. Theory, 10 theoretical tasks related both to digital and analogue technology, to be completed in 2 hours (10 p.) 4. Fault finding, 3 different fault finding tasks, each of them to be completed in 2 hours, 6 hours in all (20 p.) 5. Prototype building and design, to be completed in 4 hours ( 20 p.) 6. Testing and measuring task, building an equipment and testing its performance characteristic, to be completed in 4 hours (20 p.)

What problems do the present competition projects involve?. Assembling - the projects are often similar to those of the previous years (1999 and 2001). The assembling project of St. Gallen seems to be unclear in terms of the description of the trade. - we only use old-fashioned components and the main emphasis of the assembling often lies on making of a circuit board only. Prototype and design - design projects are often too simple, because only hardware is used - the wire-wrap technique is out-of-date - In design projects is no programming, although in the application of electronics that it is daily business these days - there is no circuit board design, there is only a layout interpretation which very seldom comes up in practical work nowadays

What problems do the present competition projects involve? Theory - disconnecting theory from other work is against “the spirit of a skills competition” - the theory projects are too difficult for a “skills competition”, this is no “engineer competition” after all Measuring and testing - too much assembling is often involved into these projects and it is often difficult to carry out realistically the testing and measuring projects on a single circuit board. Common remarks - the projects do not really measure creativity, because the solutions of many of the projects are foreseeable - the projects favour “repeating

An outline for new project areas in 2003 The main focus area in the future 2.1. Prototype design In this project a competitor creates a solution defined in the assignment to meet the properties in a given environment (embedded system). He/She first designs the necessary additional connections to a printed basic circuit and creates the necessary additional programs to carry out the functions Prototype assembly Based on their designs,the competitors assemble an actual prototype. The project involves working out the layout of the elaborated circuit diagram, putting it into practice and testing the device. How to make this device? Milling a complete protoboard would take too much time (perhaps not)???!

The implementation of the new trade description/specification Our proposal in St.Gallen to Helsinki 2005, trade description Assembling, a more precise specification of the project and more major elements of mechanics! (6h) Prototype design and assembly (a programming-based embedded system) (8 h) Fault finding (4 h) Testing and measuring (4 h)

The implementation of the new trade description/specification Final TD in Helsinki 1. Assembly task of electronics, 6 hours, 20 points Projects should include assembly of PCB-boards that include conventional and surface mount components. Wiring and mechanical assembly will also be required. It is recommended that 50% of the marks for assembly should be based on components 25 % be based on wiring and 25 % based on mechanical assembly. 2. Building proto equipment, 6 hours, 30 points Prototype building, which demands design skills of a competitor. He/she gets a device building problem to be solved in a determined processor environment (PIC). He/she has to show through solving the problem his/her skills of programming (C-language) and the so-called hardware skills. 3. Fault finding and use of measuring device, 6 hours, 30 points 4. Theory, 2 hours, 10 points 5. Drawing, 2 hours, 10 points

The implementation of the new trade description/specification Our proposal in Helsinki to Sizuoka 2007, trade description Assembling, OK Prototype design and assembly, new proposal The prototype board and PIC prosessor have to be connected to standard I/O-Bus. Only the I/O interface is defined and the competitors may choose the type of prosessor. The interfaces are defined so that no so.called intelligent circuits can be used for a task board. A recommendation for the way of assessment for the programming is created Fault finding (4 h), OK Testing and measuring (4 h), OK Drawing and Theory, new proposal The task be changed completely into circuit board design to enable theory being integrated into it. The designed circuit board will be milling on the competition site and it will be made into a device immediately. In this case the task can be part of assembly or as an alternative, an independent task itself.

The implementation of the new trade description/specification Final TD in Sizuoka 1.Assembly task of electronics, 4 hours, 18 points 2. Product development and building of proto equipment, 7 hours, 31 points (the share of circuit card layout is 10 points) The second task relates to the so-called prototype building, which also demands design skills of a competitior. The task begins with a supplement of a partially designed circuit diagram. Maximum of time 3 hours. Once this is completed, he/she starts the design of a circuit card corresponding to the circuit diagram, using the CAD program (Altium Design). Time: 2 hours. For this CAD-based design a competitor gains 10 points out of the task category. These parts of the task are carried out during the first day of competition. During the competition, the circuit cards are made with the help of a proto milling machine (S62 of LPKF). On the third day of the competition, a competitor is given two hours to complete the final assembly.

The implementation of the new trade description/specification Final TD in Sizuoka 3. Proto equipment with embedded system (PIC ), 3 hours, 15 points Here a competitor is given a problem to be designed in a determined processor (PIC) environment, in the solving of which he/she has to make use of his/her command of programming skills (C-language). The programming is directed to a specific "hardware" environment that has to be activated. 4. Fault finding and repair, 4 hours, 18 points Testing and fault finding skills are assessed through two integrated tasks. In these tasks, the faults are, however, at the component level, not in the programming. The location of the fault has to be documented, too, and thus the fault finding method will be partioned. 5. Measuring and testing, 4 hours, 18 points This is a type of task in which a competitor has to focus on the creation of complex measuring problems. The task also includes rules that are necessary in implementation situations. A competitor also has to document the outcome of the measurement.

An outline for new project areas in 2009 Discussions in Japan concerning the development of the trade for Galgary There were many signs of alteration towards a good direction in Helsinki, but needs to change the description of electronics and problems involved in it still exist. Proto equipment is an example of the desire to keep the HW design as a separate task and leave the embedded systems as it is now: a pure SW task. It is necessary to combine these items to form one single task basing on embedded systems. Finland intends to propose an alteration to this for the WSC in Japan. As far as the fault finding and measuring are concerned it also seems to be quite unnecessary to keep them separated. They, too, could be combined to form one single task. An assessment of the social and communicative skills of the competitors should be incorporated in the structure of the WSC tasks. This could be facilitated by introducing pair work into the competitions.