1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.

Slides:



Advertisements
Similar presentations
CEOS WGISS & Subgroup Meeting, Budapest, May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ
Advertisements

Wyn Cudlip BNSC/QinetiQ Presentation to WGISS24 DLR, October 2007 CCSDS Liaison Consultative Committee on Space Data Systems.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
November SLS RFM and RNG REPORT 18 November 2004.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 16 June 2006 Space Link Services Area report to CESG Rome, Italy, 16 June 2006 J.L. Gerner / G. Moury.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Chris Taylor TEC-EDS 1 SOIS Prototyping Activities CCSDS SOIS Berlin 2008 C. Taylor ESA- ESTEC.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
26 October2005 Reston, VA, USA 1 MOIMS AREA: STATUS REPORT, End of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC 26 October
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 23 January 2007 Space Link Services Area report to CESG/CMC Colorado Springs, USA, 24 January 2007 J.L. Gerner / G. Moury.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SLS AREA REPORT November SLS AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY TECHNICAL STATUS OF EACH.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
1 Space Link Services Area report to CESG/CMC Darmstadt, Germany, 9 October 2007 J.L. Gerner / G. Moury.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
The CCSDS Cislunar Communications Architecture Keith Scott The MITRE Corporation CCSDS Meeting January 2007.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
Dokumentname > Folie 1 > Vortrag > Autor DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington.
Navigation WG Report D. Berry NASA J. Fertig ESA.
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
SOIS Application Support Service WG and SOIS Plug-and-Play BoF Spring 2008 Report.
November SECURITY WORKING GROUP REPORT November 2004.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
April Space Link Services AREA REPORT 15 April 2005.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS
CEOS WGISS Meeting, Hanoi May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ Presentation.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
SPACE INTERNETWORKING SERVICES (SIS) AREA
Recommended CCSDS actions in response to IOAG-11
Security WG: Report of the Fall 2013 Meeting
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
Atlanta, Georgia, USA, 16 September 2005
SPACECRAFT ONBOARD INTERFACES SERVICES
CCSDS Liaison Consultative Committee on Space Data Systems
Presentation transcript:

1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton

2 26 October 2005 SIS AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY TECHNICAL STATUS OF EACH WG & BOF C.CROSS-AREA TECHNICAL ISSUES D.OTHER ISSUE AND CONCERNS

3 26 October Space Packet Protocol WG – did not meet in Atlanta 2.Unacknowledged CFDP Extensions WG – completed work 3.CFDP Interoperability Testing WG – did not meet in Atlanta 4.Cislunar Space Internetworking WG 5.Asynchronous Messaging Service WG 6.IP-over-CCSDS BOF A.LIST OF CURRENT WGs AND BOFs WITHIN AREA SIS AREA REPORT

4 26 October 2005 B.SUMMARY TECHNICAL STATUS 1.SPACE PACKET PROTOCOL WG Goal: Review and revise Space Packet Protocol as a result of restructuring. Working Group Status: Responding to ballot comments Working Group Summary Situation: Working Group Summary progress: WG to resolve comments received on GB review. On publication WG will raise a resolution to dissolve. Need SIS/SLS joint meeting to resolve comments. Problems and Issues: Conflict between AOS and Conventional TM/TC uses of Path/AP id identified in Green Book review. status:OKCAUTIONPROBLEM comment: CESG review of GB complete: many comments related to semantics of APID SIS AREA REPORT

5 26 October UNACKNOWLEDGED CFDP EXTENSIONS WG Goal: Extend CFDP to support unacknowledged operation in the presence of out of order data arrival. Working Group Status: Was moribund, dissolution approved by CESG. Working Group Summary Situation: Working Group Summary progress: SIS-R (UCE-R ) approved by CESG on 12 May CMC resolution CMC-R approved publication. CESG-R (SIS-R )(UCE-R ): motion to dissolve working group approved 3 October 2005 by CESG. Problems and Issues: None. Adios! status:OKCAUTIONPROBLEM comment: Going, going, gone. SIS AREA REPORT

6 26 October CFDP INTEROPERABILITY TESTING WG Goal: Complete CFDP SFO and Extended Procedures interoperability testing Working Group Status: Active _X_ Idle ____ Working Group Summary Situation: Working Group Summary progress: Group met at JPL for interoperability testing (in lieu of Atlanta). Extended procedures nearly fully validated. SFO 50% validated. A further JPL to complete by end CY 2005 Two pink sheet issues identified so far: Src/Dst ID in hex, not ASCII; intermediate file naming conventions in SFO. One full day of meeting room support is required for next cycle Problems and Issues: Dick Carper’s contract is up. Max Ciccone has agreed to take over the group. CESG resolution being formulated to this effect for CMC approval. ITAR status:OKCAUTIONPROBLEM comment: WG chair changing. SIS AREA REPORT

7 26 October CISLUNAR SPACE INTERNETWORKING WG Goal: Design a communications architecture for cislunar and possible Mars in-situ environments; update existing CCSDS standards to reflect recent advances in telecommunications. Working Group Status: Active _X_ Idle ____ Working Group Summary Situation: Working Group Summary progress: Met with representatives from high rate uplink BoF / space link services to discuss implications of space links and CDMA on cislunar architecture. Reviewed new and revised text for Green Book Sections. Target date December Discussed details for follow-on Red Book on IP Infrastructure. 2 meeting room days required in next meeting cycle. Probably an additional ½ day for coordination with RF/Modulation (space link / high rate uplink) and ½ day joint security. Problems and Issues: Cislunar touches on a broad range of subjects. Careful coordination is needed to try to insert cislunar concerns into other areas and to ensure that cislunar doesn’t duplicate work in other areas. Cislunar has started a liaison with data link layer representatives, and needs to coordinate with the security working group. Need IP-over-CCSDS implementation to begin testing. There are currently very limited implementations of IP-over-CCSDS to support such testing. Support will be needed to support implementations and interoperability testing. status:OKCAUTIONPROBLEM comment: Active participation from NASA and ESA, some participation from BNSC and CSA SIS AREA REPORT

8 26 October ASYNCHROUS MESSAGING SERVICE WG Goal: Review concept paper, develop consensus for White Book by 12/05 Working Group Status: Active Working Group Summary Situation: Working Group Summary progress: Cross area meeting with MOIMS/SMC – agreement that AMS is suitable, demonstrated prototype implementation of SMC messages carried by AMS Protocol enhancements agreed 4 meeting room days required in next meeting cycle. (Atlanta attendees: 6 per day, ~20 in joint MOIMS meeting) Implementation plans: NASA writing, JPL implement, MSFC test; ESA – CMC budget for 2 nd implementation Problems and Issues: None status:OKCAUTIONPROBLEM comment: WG Kicked Off SIS AREA REPORT

9 26 October IP over CCSDS Links BOF Goals : Clearly articulate the need to transfer IPv4 and IPv6 datagrams over the four underlying internationally standardized CCSDS link layer protocols Describe the standard CCSDS options for carrying IP datagrams within those CCSDS frames, including the mode where those IP datagrams are encapsulated within a specific HDLC serial bit stream for interfacing with a COTS router. BOF Status: Active X Idle ____ BOF Summary Situation: There is consensus to form a WG; NASA, BNSC and ESA will participate. Need 1 day meeting room (est. 12 participants) early in week, ½ day joint Cislunar meeting, ½ day meeting room late in week (est. 12 participants) CESG-R (SIS-R ) Approved 10/24/2005 to charter WG status:OKCAUTIONPROBLEM comment:Draft WG charter approved by CESG SIS AREA REPORT

10 26 October 2005 Cross Area Issues Need joint SIS/SOIS(TCOAS) meeting to ensure that SIS services address TCOAS requirements Participated in SOIS workshop on 24 October to discuss TCONS/OBL strategy SIS/SLS joint resolution of SPP Green Book comments SIS/SLS joint resolution of encapsulation issues