IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.

Slides:



Advertisements
Similar presentations
3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:
Advertisements

IBL Insertable B-Layer
IBL G. Darbo – INFN / Genova Roma, 5 September 2012 o IBL Stato e Richieste 2013 Riunione ATLAS / INFN Referee, 5 September 2012 G. Darbo – INFN.
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Status of the ATLAS MM project
Reviewer’s Mandate G. Darbo – INFN / Genova Sensor Review, 4 May 2011 o Sensor Review Slides for Jörn Talk IBL Sensor Review Kick-off Meeting CERN, May,
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Towards a TDR for the IBL G. Darbo - INFN / Genova AW, 24 February 2009 o Towards a TDR for the IBL ATLAS Upgrade Week CERN, 24 February 2009 Session:
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
IBL – Status & Plans G. Darbo - INFN / Genova ID GEN, 28 November 2008 o Insertable B-Layer Status & Plans ATLAS Inner Detector General Meeting CERN, 28.
IBL Project Status G. Darbo – INFN / Genova AW, 9 October 2009 o Insertable B-layer Project Status ATLAS Week Barcelona, October, G. Darbo - INFN.
IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February 2010 o IBL Status, TDR & MOU ATLAS Week CERN, February 26, 2010 G. Darbo - INFN.
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July 2009 o ATLAS Preparations for LHC Phase-I Upgrade ATLAS Week CERN,
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
1 H. Pernegger/CERNVertex 2011 ATLAS Insertable B-Layer Overview Vertex 2011 Rust, Austria H. Pernegger / CERN on behalf of the ATLAS IBL collaboration.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
ATLAS micromegas activities (MAMMA)
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Leonardo Rossi INFN Genova - UTOPIA #12 0 What we have learned from UTOPIA so far? Defined a set of gauge histos to compare layouts Exercised on barrel-part.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
1 Heinz Pernegger / LHCC 16/11/10 IBL TDR : Questions and Answers H. Pernegger / CERN on behalf of the IBL collaboration.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
Leonardo Rossi – EB 68 – Oct 5, Pixel status and schedule Rad-hard electronics (has always been) on the critical path for the construction of the.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
Atlas Upgrade week - November 15 th, 2011M. Raymond – CERN/PH-ADO-PO 1 Introduction Many activities are planned to be performed during the shut down
The ATLAS IBL Project – 5 th Trento Workshop G. Darbo – INFN / Genova Manchester, February 2010 o The ATLAS IBL Project The 5 th "Trento" Workshop.
The ATLAS Insertable B-Layer Detector (IBL) F. Hügging on behalf of the ATLAS IBL collaboration Pixel th International Workshop on Semiconductor.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
IBL project for DT Science-Techno Tea
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Francesco Forti University and INFN, Pisa
Status of ATLAS Resources
Communications Share Point Collaborative WS:
Update on ATLAS insertable B-layer
Presentation transcript:

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Material from Raphael/Neal The Insertable B-Layer (IBL) is a fourth layer added to the present Pixel detector between a new beam pipe and the current inner Pixel layer (B-layer). IST IBL Support Tube Alignment wires PP1 Collar IBL Detector IBL Staves Sealing service ring IBL key Specs / Params 14 staves, = mm CO 2 cooling, T < 0.2 W/cm 2 X/X 0 < 1.5 % (B-layer is 2.7 %) 50 µm x 250 µm pixels 1.8º overlap in ϕ, <2% gaps in Z 32/16 single/double FE-I4 modules per stave Radiation tolerance 5x10 15 n eq /cm 2 IBL key Specs / Params 14 staves, = mm CO 2 cooling, T < 0.2 W/cm 2 X/X 0 < 1.5 % (B-layer is 2.7 %) 50 µm x 250 µm pixels 1.8º overlap in ϕ, <2% gaps in Z 32/16 single/double FE-I4 modules per stave Radiation tolerance 5x10 15 n eq /cm 2

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November History of IBL Project - Time Line 1998: Pixel TDR B-layer designed to be substituted every 3 years of nominal LHC (300 fb -1 ): due to then available radiation hard sensor and electronic technologies. 2002: B-layer replacement became part of ATLAS planning and was put into the M&O budget to RRB. 2008: B-layer taskforce B-layer replacement cannot be done – Engineering changes to fulfil delayed on- detector electronics (FE-I3, MCC) made it impossible even in a long shut down. Best (only viable) solution: “make a new smaller radius B-layer insertion using technology being developed for HL-LHC prototypes”. This became the IBL. 2009: ATLAS started IBL project: February: endorsed IBL PL and TC April: IBL organization in place (Endorsed by the ATLAS EB) 2010: TDR and interim-MoU TDR is under approval in ATLAS Interim-MoU is collecting last signatures.

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November WGs, Pixel Liaison & Tasks Module WG (WG1) M. Garcia-Sciveres F. Hügging Module WG (WG1) M. Garcia-Sciveres F. Hügging Stave WG (WG2) E. Vigeolas O. Rohne Stave WG (WG2) E. Vigeolas O. Rohne Integration & Installation WG (WG3) F. Cadoux R. Vuillermet Integration & Installation WG (WG3) F. Cadoux R. Vuillermet Off-detector (WG4) T. Flick S. Débieux Off-detector (WG4) T. Flick S. Débieux IBL Management Board (MB) Membership: IBL PL + IBL TC Coordinators of WG Pixel / IBL Liaison Ex-officio IBL Management Board (MB) Membership: IBL PL + IBL TC Coordinators of WG Pixel / IBL Liaison Ex-officio PIXEL / IBL “LIAISON” Common Pixel / IBL Membership: Offline Software: A. Andreazza (untill 9/2010) DAQ: P. Morettini DCS: S. Kersten PIXEL / IBL “LIAISON” Common Pixel / IBL Membership: Offline Software: A. Andreazza (untill 9/2010) DAQ: P. Morettini DCS: S. Kersten WG Description Responsible TASK Module

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Management Board (MB) Module WG (2 cordinators) FE-I4 Sensors Bump-Bonding Modules Procurement & QC Irradiation & Test Beam Module WG (2 cordinators) FE-I4 Sensors Bump-Bonding Modules Procurement & QC Irradiation & Test Beam Stave WG (1 Phys + 1 Eng.) Staves Cooling Design & Stave TM HDI (Flex Hybrid) Internal services Loaded stave Procurement & QC Stave WG (1 Phys + 1 Eng.) Staves Cooling Design & Stave TM HDI (Flex Hybrid) Internal services Loaded stave Procurement & QC Integration & Installation WG (2 Eng.) Stave Integration Global Supports BP procurement Ext. services inst. BP extraction IBL+BP Installation Cooling Plant Integration & Installation WG (2 Eng.) Stave Integration Global Supports BP procurement Ext. services inst. BP extraction IBL+BP Installation Cooling Plant Off-detector (1 Phys + 1 E.Eng.) BOC/ROD Power chain & PP2 DCS & interlocks Opto-link Ext. serv.design/proc. Procurement & QC System Test Off-detector (1 Phys + 1 E.Eng.) BOC/ROD Power chain & PP2 DCS & interlocks Opto-link Ext. serv.design/proc. Procurement & QC System Test IBL Management Board (MB) Membership: IBL PL + IBL TC 2 cordinators from each WG Plus “extra” members IBL Management Board (MB) Membership: IBL PL + IBL TC 2 cordinators from each WG Plus “extra” members MB ad-interim membership IBL Project Leader: G. Darbo IBL Technical Coordinator: H. Pernegger “Module” WG: F. Hügging & M. Garcia-Sciveres “Stave” WG: O. Rohne + E. Vigeolas “Integration & Installation” WG: F. Cadoux + R. Vuillermet “Off-detector” WG: T. Flick + S. Débieux “Extra” members: IBL/Pixel “liaison”: Off-line SW: A. Andreazza, DAQ: P. Morettini, DCS: S. Kersten Ex officio: Upgrade Coordinator (N. Hessey), PO Chair (M. Nessi), Pixel PL (B. Di Girolamo), ID PL (P. Wells), IB Chair (C. Gößling) MB ad-interim membership IBL Project Leader: G. Darbo IBL Technical Coordinator: H. Pernegger “Module” WG: F. Hügging & M. Garcia-Sciveres “Stave” WG: O. Rohne + E. Vigeolas “Integration & Installation” WG: F. Cadoux + R. Vuillermet “Off-detector” WG: T. Flick + S. Débieux “Extra” members: IBL/Pixel “liaison”: Off-line SW: A. Andreazza, DAQ: P. Morettini, DCS: S. Kersten Ex officio: Upgrade Coordinator (N. Hessey), PO Chair (M. Nessi), Pixel PL (B. Di Girolamo), ID PL (P. Wells), IB Chair (C. Gößling)

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Interim-MoU - Institutions 43 institutions in the IBL project Large interest for the sensor (22 Institutions) 300 people have expressed their interest to contribute to the project The list of names is in Ch.11 of IBL TDR

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Money Matrix (A.4) Unknown covers the previously assigned contribution to UK. UK cannot commit until sensor decision, The Annex 4 has been changed in the technology option with the addition of is Munich MPI (D- MPG) – 12 kCH for the IZM order.

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Institutes and Contributions to IBL Note: the numbers in the table "are not final, nor are the suggested financial contributions yet firm, but are meant for a common overall discussion.” Technology options refer to supplementary costs that are sensor technology specific and will be known before the definite MoU takes effect. 42 Institutes in the interim- MoU (few others are “observers” ). 14 Countries + CERN 9.7 MCH total project cost

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Money Matrix (A.4 ext)

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Annex 5: IBL Payment Profile Funding profile follows schedule for “ready to installation by end of 2014” 2010 Expenditures: in large fraction for prototyping of FE- I4, sensors, modules, staves… Two common contracts and several prototype costs already done in the framework of the interim-MoU.

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Institutes (A.3)

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November IBL TDR – Endorsed by CB, LHCC IBL TDR endorsed by ATLAS Collaboration Board (8/10/2010): CERN-LHCC , ATLAS TDR 19 In printing 200 copies Editorial team: M. Capeans (technical editor), G. Darbo, K. Einsweiller, M. Elsing, T. Flick, M. Garcia-Sciveres, C. Gemme, H. Pernegger, O. Rohne and R. Vuillermet. IBL TDR presented to LHCC 21/9/2010: The project has received very positive comments and TDR was considered a solid documents. We expect some feedback from the reviewers (hope towards a formal approval) by end of the year/beginning of next year

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November IBL TDR in ATLAS e-News service- enews/2010/news_10/news_Insertable%20B- layer.php service- enews/2010/news_10/news_Insertable%20B- layer.php

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Physics Performance Sound TDR section on Physics and Performance: Pixel / IBL software Group – Coordinated by Attilio Boosted in the last 3 months by the P & P TF – Chaired by Markus Need to channel again the efforts in the Pixel / IBL Offline Software! 2 jets of 500 GeV event with 2 x pile- up Same event w/o pile-up IBL

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November Physics Performance b-tagging performance crucial for: New Physics (3 rd generation !) observation of H → bb through boosted WH production Main conclusions of IBL performance Task Force: performance at 2x10 34 with IBL is equal to or better than present ATLAS without pile-up w/o IBL and 10% B-layer inefficiency: b-tagging ~ 3 times worse at 2x10 34 than today b-tagging with pile-up & inefficiencies b-tagging with pile-up 2 jets of 500 GeV event with 2 x pile-up Same event w/o pile-up IBL IBL Physics & Performance Task Force – M. Elsing et al.

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November The New Front-end Chip (FE-I4) FE-I3 (Pixel) FE-I4 (IBL) 80 columns 336 rows 19 mm 20.2 mm 60 KGD / Wafer

IBL Slides G. Darbo – INFN / Genova CSN1, 22 November FE-I4 Wafer Received! FE-I4 Production 3 wafers received 27/9 7 more expected early december 6 more held back One wafer partially diced 6 chips put on boards All works! One wafer under probed 41/60 are good! FE-I4 8” wafer - 60 KGD / Wafer FE-I4 die ~2x2 cm 2