1 2012 Annual Alpha Meeting Dr. Dean Kashiwagi, PhD, MBA Performance Based Studies Research Group Del E. Webb School of Construction Program School of.

Slides:



Advertisements
Similar presentations
Performance Based Studies Research Group
Advertisements

Best Value PIPS PIPS: Perfromance Information Procurement System
Performance Based Studies Research Group
Developed By: Performance Based Studies Research Group Performance Information Procurement System.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
1 Bid And Proposal Evaluation Bill Shelton Scott Norton
Uniform Public Construction Cost Accounting (UPCCA) presented by: Kevin Cobb AIA/ARA, the Addington Partnership William Duncan IV, Taft College December.
Slide 1 Are your Buildings Managing You? 2007 IASBO Conference May 16, 2007 Mike Steffens, Ameresco Jerry Brendel, Superintendent, Woodridge SD #68 Wendy.
Weekly Risk Report & Performance Metrics
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
5/17/2015 Pre-Proposal Meeting Best Value Model. This presentation is being provided for educational purposes only Please refer to the RFP for specific.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Making Sense of the WIC EBT IAPD IAPD Session of the 2014 WIC EBT User Group Meeting July 23, :00 AM to 12:00 PM Presented by Cheryl Owens, MAXIMUS.
Project Close Out CTC-470.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
Contract Management Sub-Regional Caribbean Public Procurement Conference The Importance of Contract Management Port of Spain, Trinidad June 22, 2014 Sabine.
Providing Safe, Secure Cargo Protection and Transportation Standards American Energy Cargo Container Association
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Openings, Closings, and Mergers Tutorial I 2013 Schools and Libraries Fall Applicant Trainings 1 Openings, Closings, and Mergers Tutorial Fall 2013 Applicant.
12s-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
The Construction and Properties (CAP) and Central Purchasing (CP) divisions have been working as research partners with Arizona State University’s Performance.
Office of Project Management Metrics Report Presentation
Mastering Your Facility: The Revolutionary Facilities Model of the Future March 2008 P erformance B ased S tudies R esearch G roup PBSRG.
1 Best Value Project Model Kenneth T. Sullivan PhD, MBA Performance Based Studies Research Group School of Sustainable Engineering and the.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Breakthrough Technology: Best Value Performance Information Procurement System (PIPS) Delivery April 2008 P erformance B ased S tudies R esearch G roup.
Server Virtualization: Navy Network Operations Centers
HOW TO DO BUSINESS WITH THE STATE OF SOUTH CAROLINA John R. Stevens, CPPB State Procurement Officer Procurement Services Division S.C. Budget & Control.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
City of Rochester 2 nd Street Upgrade 9/15/2015 Dean Kashiwagi, PhD, PE Jake Smithwick Arizona State University.
Performance Based Studies Research Group Pre Award Phase.
Transformation of ASU Contracting Office April 2008 P erformance B ased S tudies R esearch G roup PBSRG GLOBAL Dean Kashiwagi, Professor,
EXAMPLE – Quality Control Plan For Consultants
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Introductions Brian Lines Arizona State University December 2013.
Best Value Model Pre-Proposal Information RFP Rebecca Cohn Theatre Seating Renewal.
Alpha Program Overview July 9, Introduction 10 contractors in the Alpha Program Contractors due for inspections this year – Insulated Roofing Contractor.
Best Value Business Model Supplemental Pre-Proposal Information Video RFP : Part A Design-Build St. Joseph’s College Residence.
Best Value Public Works Procurement September 7, 2007.
10/30/2015 New Risk/Project Management Paradigm New Paradigm: use a structure to increase value Performance Information Procurement System (PIPS) Performance.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
Introducing Project Management Update December 2011.
BV Project Management Online Jacob Kashiwagi, Ph.D.
Performance Based Studies Research Group Pre Award Phase.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CIPA (Children’s Internet Protection Act) Helping You Succeed Schools and Libraries Division Washington, DC Newark Atlanta Chicago Orlando.
Common Challenges in Project Delivery. A Note on Terminology… Owner / Client – The buyer, purchaser, receiver of services – Includes: Procurement Operations.
Overview John Savicky Arizona State University May 2013.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Strategic sourcing is a Price Based approach to supply chain management that formalizes the way information is gathered and used so that an organization.
Efficient Renovation, Repair, & Minor New Construction Job Order Contracting Best Management Practices.
Job Order Contracting 2016 & Beyond! Best Management Practices Moderator: Peter Cholakis, CJE Board Member Presenters: Charlie Bowers, LEED AP - National.
Detroit 0% Interest Home Repair Loan Program 1 CITY OF DETROIT HOUSING & REVITALIZATION DEPARTMENT Program grant sub-recipient overseeing loan capitalization.
PIPS!!! Performance Information Procurement System.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
Supplier Management Can’t live with them, Can’t live without them!
Efficient Renovation, Repair, and Minor New Construction LEAN - Job Order Contracting Best Management Practices Moderator: Peter Cholakis, CJE Board Member.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Performance-Based Contracting PIPS Performance Information Procurement System Jacob Charries Central Purchasing
Green Line Extension Project
Light Rail Transit Project
Procurement Management
Best Value Performance Information Procurement System (PIPS)
Enterprise Content Management Owners Representative Contract Approval
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Statewide Public Communications Services RFP#
Procurement & Strategic Sourcing
Presentation transcript:

Annual Alpha Meeting Dr. Dean Kashiwagi, PhD, MBA Performance Based Studies Research Group Del E. Webb School of Construction Program School of Sustainable Engineering & the Built Environment Ira A. Fulton Schools of Engineering Arizona State University

2

3

4

5

6

7

8

Inside of a building

Corroded deck

Worldwide as a leader in Best-Value Systems –Conducting research since 1994 –1000+ Projects –$4.4 Billion Services & Construction –5% Increase in Vendor profit –98% On-time, On-Budget, Customer satisfaction –PMI, NIGP, IFMA, IPMA –Tests in Netherlands, Botswana/Africa –ASU – investments of over $100M due to BV –WSCA Contract Gives Access to all states PBSRG’s Research Results (Performance Based Studies Research Group) © 2011, Arizona State University, PBSRG

International Efforts 16 Fulbright Scholarship- University of Botswana PIPS tests RMIT Teaching IMT PBSRG platform Netherlands Most successful implementation of BVP outside of United States Visionaries: Scenter, Rikswaterstaat, NEVI Largest test: $1B Brunsfield Complete Supply Chain implementation of best value PIPS University of Alberta United States- 65 clients WSCA, NASPO CIB Network PBSRG Network PMForum Network Finland BVP is being proposed as a part of risk/project management

17 Dutch Efforts Approx. 50 general presentations Approx 2000 attendees 2nd and 3rd reprint of Dutch book 4 papers published NEVI education and certification

NEVI Third largest procurement organization in the world Represents both public and private procurement groups Educate and certify PIPS practitioners

Rochester School District University of Minnesota Contract City of Rochester Rochester School District Rochester School District Superintendent Rochester School Board Rochester School Teachers/Students

Eliminating the Confusion Planning / Programming DesignerContracting Vendors / Manufacturers UsersInspectors Simplicity/Dominant Information Technical Details 30K Foot Level

W W W. P B S R G. C O M Industry Structure (Reactive vs Proactive) High I. Price Based II. Value Based IV. Unstable Market III. Negotiated-Bid Specifications, standards and qualification based Management, direction, and control Decision making Technical expertise on client’s side Best Value (Performance and price measurements) Quality control and quality assurance Perceived Competition Performance Low High Owner selects vendor Negotiates with vendor Vendor performs © 2011, Arizona State University, PBSRG

W W W. P B S R G. C O M High Low Performance Owners “The lowest possible quality that I want” High Low Performance Vendors “The highest possible value that you will get” Minimum Maximum What is causing all the confusion?

W W W. P B S R G. C O M Performance High Low Risk High Low Best Value vs. Low Bid Contractor 1 Contractor 2 Contractor 3 Contractor 4 Contractor 1 Contractor 2 Contractor 3 Contractor 4 Performance High Low Risk High Low

W W W. P B S R G. C O M Industry performance and capability Highly Trained Medium Trained Vendor X Customers Outsourcing Owner Partnering Owner Price Based Minimal Experience

W W W. P B S R G. C O M Objectives Get more business Minimize risks for Neogard, client and contractor Support Alpha contractors Provide dominant documented performance 26

W W W. P B S R G. C O M Key items Being proactive and visionary Minimizing transactions and risks during the project Customer satisfaction policy vs. Alpha program requirements Pre-planning  Pre-award meeting  Risk Management Plan  Weekly Risk Report Create “win-win” DISD efforts Neogard Risk Management Program 27

W W W. P B S R G. C O M Current Alpha Contractors Alpha Contracting Services Brazos CAW Creative Times Cook Coatings Dallas Urethane IRC Longhorn Urethane Phoenix Coatings Phoenix 1 ProCo Tillotson Washington Roofing Wattle & Daub

W W W. P B S R G. C O M Best Value Alpha Project Alpha Contractor Pre-construction Risk Meeting Alpha Contractor Notified of PA Roof Inspection Warranty signed Weekly Risk Report (On-going) Roof Inspection (Once every two years) Roof Inspection (Once every two years) Follow up Call (Yearly) Follow up Call (Yearly) Awarded Project NTPBidClose Out Repeat Process Complete

DISD Bond PM /Planning / Programming Designer Contracting General Contractors Alpha Contractor Users Inspectors

Using Common Sense 31 Bidding AwardStart of Project End of Project Inspection Whatr is in What is out Risks Risk Mitigation Track deviations Value determined by BUR/MB

Past Alpha Projects WRR creates accountability and tracks cost changes and delays 32 Criteria Kansas Marine Ft Rucker Original Project Cost1,184,515885,400 Total Close-out Cost1,209,000885,400 Total % Over Budget2%0% % over budget due to Owner0% % over budget due to Contractor0% % over budget due to Unforeseen2%0% Total % Delayed391%119% % delayed due to Owner171%119% % delayed due to Contractor0% % delayed due to Unforeseen220%0%

W W W. P B S R G. C O M Pre-construction Risk Meeting Not the same as pre-construction meeting Meet on project-site Following should attend the meeting  Alpha Contractor  Owner representative  Neogard representative  Any other critical entity involved with the project Identify all the risks and a plan to mitigate them for all parties, create a Risk Management Plan (RMP) Create milestone schedule and track percentages (from detailed schedule) Initiate Weekly Risk Report

W W W. P B S R G. C O M Pre-construction Risk Meeting Clearly identify “what is in” and “what is out” Price what is specified Any additional items that need to be added / deleted and was not included in the specifications, immediately issue a change order or ask for additional funds Get approval from the client at the meeting 34

W W W. P B S R G. C O M Risk Management Plan Identify major risks that the contractor does not control Plan to manage and minimize the risk that they do not control Living document in Weekly Risk Report

W W W. P B S R G. C O M Why Risk Management Plan? Makes everything transparent Brings accountability Protects Alpha contractor Eliminates false expectations by owner No surprises during the project Creates “win-win” situation 36

W W W. P B S R G. C O M Best Value Alpha Project Alpha Contractor Pre-construction Risk Meeting Alpha Contractor Notified of PA Roof Inspection Warranty signed Weekly Risk Report (On-going) Roof Inspection (Once every two years) Roof Inspection (Once every two years) Follow up Call (Yearly) Follow up Call (Yearly) Awarded Project NTPBidClose Out Repeat Process Complete

W W W. P B S R G. C O M Deliverables Detailed Technical Schedule

W W W. P B S R G. C O M Deliverables Detailed Technical Schedule Interface with others who vendor DNC

W W W. P B S R G. C O M Deliverables Detailed Technical Schedule Interface with others who vendor DNC RMP

W W W. P B S R G. C O M Detailed Schedule, Interfaces with DNC parties, RMP, PM Detailed Technical Schedule Interface with others who vendor DNC RMP Performance Measurements

W W W. P B S R G. C O M Weekly Risk Report 42

W W W. P B S R G. C O M Weekly Risk Report 43

W W W. P B S R G. C O M Weekly Risk Report Risks are all issues that could affect budget, schedule or owner satisfaction 44

W W W. P B S R G. C O M Weekly Risk Report Track Change Orders Risk Management Plan 45

W W W. P B S R G. C O M Weekly Risk Report All numbers calculated automatically, no need to update

W W W. P B S R G. C O M Weekly Risk Report Project Contact Information 47

W W W. P B S R G. C O M Customer Satisfaction Policy 48 Alpha Contractor Follow-up call to client* Yes Problem? (Leak, open blisters) Problem? (Leak, open blisters) Repair roof within 15 days of notice Contact the Applicator Roof Installation No Next Job *Client can change the satisfaction rating anytime putting the Alpha Contractor under the risk of elimination from the program

W W W. P B S R G. C O M Customer Satisfaction vs. Alpha Program Customer Satisfaction Alpha Program  Roof inspections once every 2 years  Annually submit to Arizona State University (PBSRG) all SPF roofs installed over 5,000 SF  Attend educational presentation given by Arizona State University (PBSRG) (1/year)  98% of roofs do not currently leak  98% of customers satisfied  Maintain “Good Financial Standing” with Neogard 49 Roof Install Client Follow-up Problem? Yes No Repeat Process Dissatisfied Client Fix roof within 15 days Eliminate from program until roof fixed / client satisfied 98% of customers satisfied

W W W. P B S R G. C O M Alpha Inspections Cook Coatings – March 2012 Phoenix Coatings – March 2012 ProCo – May 2012 Tillotson – June 2012 Washington – July 2012 Longhorn – July 2012 Brazos Industries – July

W W W. P B S R G. C O M Alpha Annual List Please submit the annual roof list, if not already done, to Dhaval Gajjar at meeting the following  All newly installed SPF roofs over 5,000 SF  Installed in 2011 Template for roof list will be sent 51

DISD Efforts 52

W W W. P B S R G. C O M DISD Risk Minimization Inspect DISD roofs every year DISD Weekly Risk Report sent every week Fix roofs that have over 1% blisters, leaking or GT 1 SF of blisters within 15 days Mike Smith can notify PBSRG anytime for dissatisfaction of not fixing the roof An Alpha contractor can be removed from the Alpha Program 53

W W W. P B S R G. C O M DISD WRR – Risky Projects JobID Job Name Contractor Street Address Job Area Original Install Date Warranty Length Insp. Date Ponding Blisters Repair Comments 1Hawthorne ESAlpha Contracting7800 Umphress45,2007/30/ /8/ Open cracks in blisters 2Spruce HSAlpha Contracting9733 Old Seagoville Rd.85,0008/26/ /9/ Blisters repaired. Some more will be repaired by Travis 3Houston ESAlpha Contracting2827 Throckmorton Street23,0007/22/ /8/ Blisters on shady side of the roof due to no sun 4Peabody ESAlpha Contracting3101 Raydell Place32,6008/1/ /9/ open blisters in 2-4 blisters 5Hillcrest HSAlpha Contracting9924 Hillcrest Rd108,0006/10/ /10/ Open Blisters - 4 6Hall ESAlpha Contracting2120 Kents Dr.68,0007/26/ /9/ Open cracks in blisters 7Seagoville HSAlpha Contracting15920 Seagoville Rd.57,3008/3/ /10/ Some open blisters Alpha Contracting Total DISD risky roofs7 Total DISD roofs repaired1 Roofs still need to be repaired 7 % of DISD risky roofs repaired 12.5% # of days since first notification 98 # of times contacted7 54 Sent to DISD h every week

W W W. P B S R G. C O M 2011 DISD Projects 55 NoJob NameContractorJob Area 1 Thomas Jefferson HSAlpha Contracting145,850 2 Sunset High SchoolAlpha Contracting44,580 3 Stonewall Jackson Elementary SchoolAlpha Contracting22,242 4 Alamo PoolAlpha Contracting13,030 5 Pleasant Grove PoolAlpha Contracting13,030 6 Lakewood Elementary - Modular BuildingAlpha Contracting5,688 7 Harry StoneBrazos Urethane95,000 8 D.A. Hulcy MSBrazos Urethane62,050 9 Whitney M. Young Jr. ElementaryBrazos Urethane59, JW RayBrazos Urethane54, David W CarterBrazos Urethane38, James B. Bonham - BP 45ªBrazos Urethane17, B.F. Darrell Male AcademyPhoenix 155, Nancy MoseleyPhoenix 122, Seagoville Alt.Edu.buildingPhoenix 12,000 NoContractor Total Jobs Total Job Area 1 Alpha Contractor6244,420 2 Brazos Urethane6325,734 3 Phoenix1379,900

W W W. P B S R G. C O M DISD WRR – Risky Project Status 56 Job IDJob NameJob Area Original Install Date Estimated Repair date 1Hawthorne ES45,2007/30/2005End of February, Spruce HS85,0008/26/2005End of February, Houston ES23,0007/22/2005Repair in-process, open blisters fixed 4Peabody ES32,6008/1/2005Have a renovation contract, will repair at same time 5Hillcrest HS108,0006/10/2005Repair in-process, open blisters fixed 6Hall ES68,0007/26/2005Have a renovation contract, will repair at same time 7Seagoville HS57,3008/3/2005End of February, 2012

W W W. P B S R G. C O M DISD WRR - Contractor Contractor Total # of roofs Average job area (SF) Total job area (SF) Average age (Yr) Total blisters (SF) Total percent of roof area blistered Total repairs (SF) Total percent of roof area repaired Alpha Contracting4841,1651,975,91852, %2, % Dallas Urethane296,000192, %0 Longhorn Enterprises336,167108, % % Phoenix 12535,369884,215111, %6, % 57

W W W. P B S R G. C O M DISD WRR – Overall P-line 58 NoCriteriaUnit Oldest job surveyedYears 25 2Average age of jobs surveyedYears 7 3 Age sum of all projects inspected (doesn't leak, total years combined) Years 558 4Average total repairs on each roofSF 110 5% of total roof area repaired% 0.29% 6Average blister area on roofsSF 52 7% of total roof area currently blistered% 0.14% 8Total existing blistersSF 4,117 9Average job area (of jobs surveyed and inspected)SF 40,630 10Total job area (of job surveyed and inspected)SF 3,209,733 11Total number of jobs inspected# 79

W W W. P B S R G. C O M Alpha Contractors – Blisters vs Repairs 59 NoAlpha Contractors Total SF Inspected Total SF Blisters % Blisters Total SF Repairs % Repairs 1Alpha Contracting 1,662,7851, % 2, % 2Brazos Industries 1,194, % % 3CAW 2,321, % % 4Cook Coatings 3,084, % % 5Dallas Urethane 2,010, % % 6IRC 4,395, % % 7Longhorn 449, % 2, % 8Phoenix Coatings 1,272, % % 9Phoenix1 992,210 1, %6, % 10Pro Co. 281, % % 11Progressive Roofing 1,151, % % 12Tillotson 413, % % 13Washington 836, % % 14Wattle & Daub 993, % 0

Neogard Warranty Risk Management Program 60

W W W. P B S R G. C O M Neogard Warranty Program QC & Measurement of: System Performance Contractor Performance Follow up for issues Maintain Customer Satisfaction Neogard Owner PBSRG Warranty Performance Information Problems

W W W. P B S R G. C O M Neogard efforts Client satisfaction ratings for all projects (roofing, waterproofing, wall coatings, flooring)  Identify risky jobs (leaks, dissatisfied customer)  Annual checks on all projects under warranty Performance line all applicators  Differentiates low-performing and high-performing vendors  Identify risky applicators Overall performance line  Only manufacturer with documented performance  Use for marketing Neogard products 62

W W W. P B S R G. C O M Overall Neogard P-line 63

W W W. P B S R G. C O M Neogard Measurements 64 Neogard Segment P-lines Risky Applicators Risky Projects

W W W. P B S R G. C O M Example Applicator P-line 65

W W W. P B S R G. C O M 66 Comments / Questions W W W. P B S R G. C O M