2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove.

Slides:



Advertisements
Similar presentations
Existing Arcs and 4m Dipole Preliminary Design and Safety Review Beam Transport Interface Mike Bevins February 22, GeV Upgrade - Beam Transport.
Advertisements

UCN Beamline Shielding, Target & Remote-Handling UCN CDR (Sept/2010) L.Lee.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Neutron Electric Dipole Moment Search with a Spallation Ultracold Neutron Source at TRIUMF Spokespeople: Y. Masuda (KEK), J.W. Martin (Winnipeg) Collaborators:
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
Project report. Status: MICE Muon Beam Target: –Target presently installed ‘in-operative’: Optical connections removed (why?) –Implies realignment/set-up.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Delivery Ring AIP Jerry Annala Dec 12, µ Scope Beam line aperture improvements Beam line aperture improvements Beam line power supply upgrades Beam.
UCN 2014 Installation Overview/Logistics UCN Monthly Meeting Dec.18, 2013 (L.Lee)
2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Vault-BL1A Shielding Plug Sept 26, 2012 L.Lee. N UCN Installation-1: 2014 Shutdown Shielding “Plug” will need to be reconfigured.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
UCN Facility Working Group October 3, 2012 OverviewL.Lee MCNPX and ShieldingP.Carlson Beam MonitorsC.A.Davis / A.Konaka.
BL1U at TRIUMF UCN Beamline Kicker Magnet (April 12, 2010)
UCN Facility at TRIUMF L.Lee October 3, 2012 PLACE UCN LOGO & ACRONYM HERE.
GSI-Cryoexpertmeeting; 19. & Cryoplant for series test facility Standard plants have a capacity up to A capacity of about 1,5kW is.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Collab 4/15/04 #1 EDMEDM UIUC meeting 12/3/2004 Walter Sondheim, P-25, Los Alamos for presentation to The EDM Collaboration UIUC meeting, Urbana, IL UCN.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
1 Message from Management Resources for 2014 oversubscribed Need to descope Minimal 2014 work Reschedule (Delay) some work to 2015 Groups:  Define Critical.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
BL1U at TRIUMF UCN Beamline Septum & Dipole Magnets (April 12, 2010)
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
1 BROOKHAVEN SCIENCE ASSOCIATES Injector Status Timur Shaftan, Injector Group Leader 9 th ASAC meeting for NSLS-II Project February 1-2, 2012.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ELENA installation progress F. Butin / ELENA collaboration.
UCN and SCRF/ISAC interface issues ● proposal for UCN (CFI, 2008) – 10 uA at 25% duty cycle (1 min on, 3 min off) – use BL4A (TISOL) ● duty cycle is incompatible.
LIU Wire Scanner Milestones June 2017
An Ultracold Neutron Source for TRIUMF
Uppsala Commitment to ESS and FREIA Planning
FAIR ACCELERATORS Peter Spiller EMMI workshop
ELENA Beam Transfer Workpackage
ESS RF Development at Uppsala University
ARIEL Phase I Operations
IHEP Cryomodule Status
A Cold SCU Phase-Shifter
Extraction Michael Bevins May 17, 2007
Presentation transcript:

ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) * Joint RCNP/TRIUMF/Acsion effort Remove BL1B, Core M13 block Shielding UCN APPARATUS: Spallation Target * UCN Source BEAMLINE: Kicker Septum Dipole Beamline (incl quads, PS, etc…) Design & ReviewOrder/Fabricate/Deliver Install Test Install Order/Mod Order/Fabricate Design Order/Fabricate InstallTest Install Design/Prototype/Fabricate Design/FabricateInstallUnInstall Procure shielding blocksDesign Install TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier He Liquefier System Procure UCN Source Commissioning Install/Test & RCNP Procure/Install Install

ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) * Joint RCNP/TRIUMF/Acsion effort Remove BL1B, Core M13 block Shielding UCN APPARATUS: Spallation Target * UCN Source BEAMLINE: Kicker Septum Dipole Beamline (incl quads, PS, etc…) Design & ReviewOrder/Fabricate/Deliver Install Test Install Order/Mod Order/Fabricate Design Order/Fabricate InstallTest Install Design/Prototype/Fabricate Design/FabricateInstallUnInstall Procure shielding blocksDesign Install TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier He Liquefier System Procure UCN Source Commissioning Install/Test & RCNP Procure/Install Install Kicker Ceramic Beamtube Install Design/OrderFabricate Install

ACTIVITY J A J O J A Schedule( ) UCN BL1U KICKER Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) Remove BL1B, Core M13 block KICKER: Kicker Design & ReviewOrder/Fabricate/Deliver Install Design & Out for quotes (8) Bid Time & Place Order (29) Vendor final design & Fabr. (324) Acceptance tests & Receive (60) Unpack & Test (19) Ceramic Beamtube & Stands Finalize design & Order (71) Fabricate/Assemble (136) Prepare to Install (15) Design & Review (117) Design/OrderFabricate Install

ACTIVITY J A J O J A Schedule( ) UCN BL1U SEPTUM Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) Remove BL1B, Core M13 block SEPTUM: Septum TestInstall Order/ModDesign Review & Finalize design (129) Place Order (15) Fabricate Septum Mods (80) Receive & Assemble Septum (110) Map & Test Septum (60) Vacuum Box & Stand Review & Finalize design (45) Place Order (15) Fabricate (95) Assemble (20) Prepare to Install (10) Prepare to Install (40)

ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) * Joint RCNP/TRIUMF/Acsion effort Remove BL1B, Core M13 block Shielding UCN APPARATUS: Spallation Target * UCN Source BEAMLINE: Kicker Septum Dipole Beamline (incl quads, PS, etc…) Design & ReviewOrder/Fabricate/Deliver Install Test Install Order/Mod Order/Fabricate Design Order/Fabricate InstallTest Install Design/Prototype/Fabricate Design/FabricateInstallUnInstall Procure shielding blocksDesign Install TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier He Liquefier System Procure UCN Source Commissioning Install/Test & RCNP Procure/Install Install Kicker Ceramic Beamtube Install Design/OrderFabricate Install

List of Major Milestones 2012 – DecUCN Source & Spallation Target installation at RCNP. UCN/nEDM prototyping & commissioning begins – AprKicker (or Kicker Ceramic Beamtube) Installation completed – AugUCN/nEDM RCNP phase completed. Uninstall & transport to TRIUMF – DecMeson Hall Clean-up completed – AprUCN Source & Spallation Target received at TRIUMF. Installation of Target & Source – MarUCN Beamline (BL1U) Installation completed – MarCommission UCN Facility using low intensity beam.