GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
A regulatory framework for gas quality treatment facilities: recap and update.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Transfer & Trades Special Transmission Workstream
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Review Group 221: Option 3 – security provided after allocation.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
September 2008 QSEC auction - Allocations Transmission Workstream
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Interactions with the implementation of RIIO-T1
Transmission Planning Code – Draft Document
Transmission Planning Code
Transmission Workstream, 2nd March 06
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
Mod 0452 (PARCA) – Further thoughts
Development of Entry Capacity Substitution
QSEC auction timetable
Entry Capacity Substitution
Baseline Re-consultation
Entry Overrun Calculation
Transmission Workstream – 6th July 2005
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Presentation transcript:

GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague

2 Life Before Long Term Auctions  “Transco” undertook centralised system planning – TBE Process – continues today  Obligation to sell entry capacity to Seasonal Normal Demand +10%  System built to deliver 1:20 peak  From this planning and scenario analysis, Investments were put to the regulator  Industry perception of “Gold Plated” system  Investments made under: Statutory (1:20), Power, Flexibility, Emissions or Other (primarily replacement) categories

3 Auctions  Long term auctions began in 2003  Auctions provided  Equal opportunity to obtain capacity  Price discovery  Simple allocation process (at least to start with)  Mechanism to manage entry capacity constraints

4 Quarterly System Entry Capacity  QSEC (Quarterly System Entry Capacity)  Held every March  Offers capacity from 18 months out for 15 years (i.e. Sept’08 offer capacity for April 2010 to March 2025).  Cleared price auction  Reserve Price (P0) and up to 20 incremental price steps – up to 150% of baseline  Potential for incremental signals (i.e. release new capacity)  To release new capacity, bids must pass an NPV test in accordance with the Incremental Entry Capacity Release Statement (IECR)

5 Quarterly System Entry Capacity  If a new system point is required then National Grid will work closely with users in the build up to QSEC to determine the viability of a new capacity point to bid upon  If the regulator agrees then it will determine the Unit Cost Allowance in conjunction with National Grid  If bids for this new point, or an existing point are above Baseline (baseline of new points will equal zero), an economic test is undertaken to determine any need for new investment in the Transmission system

6 Quarterly System Entry Capacity – The Economic Test  If bids are above Baseline capacity:  Incremental Entry Capacity Release (IECR) test undertaken  Is the Net Present Value (NPV) of bids over an 8 year period higher than 50% of capitalised Unit Cost Allowance?  If so, Baselines are permanently increased  This may involve capital investment  If not, National Grid may wish to consider releasing non obligated entry capacity  Incremental capacity release has a 42 month lead time  Incentives to reduce lead time  Opportunity to extend lead time e.g. in case of planning/construction issues

Regulatory Decision – The Story  National Grid had committed initial St Fergus capital based upon signals and market assessment in 2002 – then completed the Investment by 2005  Ofgem accused NG of placing insufficient weight on “important new information on the location of large new sources of gas supply” during their “go / no go” review in 2003  Initially, £75m of NG’s capex was excluded from the RAV

Regulatory Decision  Ofgem believed NG had not provided adequate justification for the expenditure incurred  They concluded that, since this project was initiated in the early days of the new entry regime, it would be inappropriate to exclude it from the RAV altogether  The effect of this is to allow £56 million to enter the RAV at the time at which the expenditure was incurred

– Further Regime Changes  Introduction of baseline substitution  substitute capacity from another ASEP  Introduction of trade and transfer  capacity moves to those who value it most  New form of revenue driver introduced  Old form still exists for previous releases  Automatically becomes baseline after 5 years

– Further Regime Changes  Opportunity for accelerated release  Release in 6 months prior to incremental obligated  National Grid NTS keep 100% of revenue  Permits  National Grid can “play” a permit if investment period cannot be met (42 months on entry)  Can “gain” a permit if can deliver earlier (and signal received)  Investment buyback incentive

11 Summary  Constant regime change  Regulatory intervention has led to investment processes using quantifiable and auditable methodologies  Economic test has become the “only show in town”  more cautious investment  associated pros and cons  Long Term auctions do not necessarily provide long term signals….  Users may take a commercial view not to signal  Original regulatory intentions get lost and changed  Selling so far out makes regime change more difficult/complex