OATT Policy Overview 3/11/11 Ren Orans. Agenda History of the FERC pro forma Open Access Transmission Tariff (OATT) and its use in British Columbia Evolving.

Slides:



Advertisements
Similar presentations
Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
Advertisements

Reliability in British Columbia
1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Wholesale Restructuring 1.PURPA 2.Market based wholesale rates 3.Incentive rates 4.Energy Policy Act of 1992 Clarified power to order third party wheeling.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
Federal Energy Regulatory Commission Update Janice Garrison Nicholas Chief Accountant and Director, Division of Financial Regulation Federal Energy Regulatory.
ICN Merger Working Group Work Product Merger Review Workshop March 10-11, 2009 Taipei.
FERC-Lite: Implementation Issues For Public Power Susan N. Kelly VP of Policy Analysis and General Counsel American Public Power Association APPA November.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Non-Tariff Barriers in the Trade of Transport Services – Final Report TPT 02/2002T Steering Committee on More Competitive Transportation (including infrastructure)
1.  What is a Renewable Energy Credit (REC)?  What are they used for?  Who uses them?  How is REC ownership tracked?  What is the Renewable Portfolio.
Sam Pieters International Relations Unit DG COMP 12/11/2012 Break out session 1: State owned enterprises and competition neutrality.
Copyright© 2011 WeComply, Inc. All rights reserved. 5/17/2015 FERC Standards of Conduct.
Bringing about beneficial change... POLICY DIALOGUE ON CORPORATE GOVERNANCE IN CHINA Presentation by Patricia Leahy, Director, UK National Audit Office.
What’s New in Southern Companies’ OATT Southern Company Transmission 2008 Customer Forum.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
COMPETITIVE ELECTRICITY MARKETS March 15, PA Customer Choice Legislation  Distribution service remains regulated by PAPUC.  Transmission service.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Introduction to Bonneville Power Administration
Vanus J. Priestley Philip R. O’Connor. Ph.D.
September  In 1998 Queensland Electricity customers exceeding 40GWH were given the opportunity to enter the National Electricity Market (NEM).
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
Imposing access obligations under the new framework Karen Hardy.
© 2001 Utility Management Consulting, Inc. All Rights Reserved Distributed Resources Interconnection Policies: A Report to EEI Members Presentation of.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
Mountain States Transmission Intertie (MSTI) Review Group Meeting Mountain States Transmission Intertie (MSTI) Review Group Meeting Tuesday, December 18,
1 New Mexico State University Santa Fe Conference 2005 Steve Rodgers Office of Markets, Tariffs & Rates—South Federal Energy Regulatory Commission March.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
BCTC Customer Consultation Short-term Point-to-Point Rate Design March 5, 2007.
Customer Information Session OATT Requirements & Business Practices Martin Huang VP Grid Operations March 2011.
“FERC-LITE,” WHOLESALE REFUND AUTHORITY, AND RELATED PROVISIONS NOVEMBER 10, 2005 ROBERT R. NORDHAUS VAN NESS FELDMAN WASHINGTON, DC (202)
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
MICHIGAN’S RETAIL ACCESS PROGRAMS Not the last Frontier A presentation to The National Energy Marketers Association.
2015 – Standards of Conduct & Prohibition of Energy Market Manipulation Compliance Review Marion Lucas, Alcoa Power Generating, Inc. APGI Chief Compliance.
Why Should Retail Customers Care About the MISO Market? WIEG Board Meeting November 8, 2007 WIEG Board Meeting November 8, 2007 Submitted by: Kavita Maini,
Briefing on the energy market liberalisation and the current status Ulrich Bang, Director of European Affairs /
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
Department of Finance Private Sector Merger Briefing - 26 September 2013 Summary of major discussion points Merger Implementation Group Merger of Synergy.
SAFIR WORKSHOP: MARKET DEVELOPMENT AND REGULATORY PROCESSES Craig Glazer Vice President—Governmental Policy PJM Interconnection, L.L.C. Washington, D.C.
Utility owned generator Federal Power Project Distribution System Residential users Commercial users Industrial users Municipal Utility Residential users.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
Enron Government Affairs Status Report to EWS 1 September 2001.
Electric Industry Overview: Municipal Electric Utilities Municipal Utilities are not-for-profit electric systems owned and operated by the people and.
Overview of Tampa Electric’s Compliance Program APPA Reliability Standards and Compliance Program January 10, 2007.
FERC Standards of Conduct
Affiliate Rules/Code of Conduct
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010
Wholesale Electricity Marketing & Trading Fundamentals
Mandatory Reliability Standards
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Solar Energy Commercialization Utility Scale Business:
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

OATT Policy Overview 3/11/11 Ren Orans

Agenda History of the FERC pro forma Open Access Transmission Tariff (OATT) and its use in British Columbia Evolving North American Industry Standards Access to Transmission under the OATT 2

HISTORY OF OATT and Use in BC

Policy goals of FERC A primary FERC policy objective is to encourage broad, competitive generation markets The tools FERC can use to drive its policy goals arise from its jurisdiction under section 201(b)(1) of the Federal Power Act Transmission of electricity in interstate commerce; and Sale of electricity at wholesale in interstate commerce. Since mid-1990s, FERC has driven much of its policy agenda through a pro forma transmission tariff, beginning with Order 888. Subsequent orders have modified the pro forma tariff, spoken to market structures (such as RTOs), and defined flexibility both inside RTOs and in regions without RTOs. 4

FERC Order 888 (1996) Order 888 set out a detailed pro forma open access transmission tariff (OATT) Requires all public utilities to file an OATT that provides competitors the same services, on the same terms and conditions, as utilities provide to themselves and to their affiliates. Allows third parties access to the transmission system without requiring utilities to separate transmission, generation, and marketing functions – no need for restructuring & divesting Does not require direct retail access Continues to provide certain advantages to domestic load service – flexible network secondary rights, for example. Contains reciprocity provisions Both OATT and SOC were created as companion orders and have evolved over time Purpose: To open wholesale electric market competition 5

Sets standard procedure that must be followed by all interconnection customers and transmission providers. Includes cost and responsibility allocation, rights, and dispute resolution processes. RESULT: All costs associated with interconnection facilities before the point of interconnection assigned to the interconnection customer. Facilities beyond the point of interconnection are considered “network upgrades” and are paid for by the customer and refunded through transmission credits. FERC Landmark Orders – Beyond Order 888/889 Requires all utilities to file an open access transmission tariff (OATT) that provides competitors the same transmission services it provides itself. SOC was introduced here too. RESULT: Opened wholesale electricity market Order 2000 Required public utilities that own transmission to join pools and RTOs. RESULT: South/West U.S. complain and Congress sustains that utilities are not required to join RTOs. FERC is left with some pools and the rest using 888-type OATTs Order Order 2004 Revised standards of conduct for transmission providers and their associated energy affiliates. It required transmission function employees to work independently of sales/marketing employees RESULT: Required corporate functional separation Order 890 Order 717 Reforms a number of elements of Order 888 to further enforce comparability and undue discrimination. RESULT: Creates tiered imbalance charges and a conditional firm service. Also, FERC moves away from corporate separation approach 6

OATT has Tracked Evolution of FERC Policy FERC has continuously amended the OATT to follow changing policy goals, to make the tariff more practical, to track jurisdictional definition by the courts, and to follow industry evolution Flexible approach to RTOs and non-RTO regions Modified OATT to address issues that arise with undue discrimination (e.g. Order 890) FERC has also relaxed its requirement for strict adherence to the pro forma Allows for regional or circumstantial differences, e.g. allows matters such as opportunity cost to be defined on a “case-by-case” basis if needed Provides wide latitude for business practice flexibility 7

Functional Unbundling Example Generation Transmission Distribution Retail Service Customer Utility Generation Independent Power Producers Transmission Distribution Wholesale Customer Heritage Vertically Integrated Separation of Transmission System FERC Standard 888 OATT Standards of Conduct FERC Standard 888 OATT Standards of Conduct Divestiture of generation 8

Adoption of the OATT in BC BC Hydro introduced a FERC Order 888 pro forma OATT in the mid-1990s Primary motivation was to ensure access to US markets by adhering to FERC’s reciprocity requirement (Powerex received its PMA in 1997, and continues to hold it) As was common at the time, BC Hydro originally followed strict adherence to the pro forma, even though it was non-jurisdictional to FERC BC Hydro OATT exclusively regulated by BCUC BC Hydro adopted the original incarnation of FERC’s Standards of Conduct (SoC) 9

BC Electricity Policy has also Evolved 2002 BC Energy Plan added new policy motivations for the OATT Private sector opportunity joined preservation of market access Generation divestiture and competitive generation markets were not pursued BC separated transmission into a separate company, BCTC, during time of BC market structure changes Common government ownership kept tariff structure designed and suited to vertically integrated utility BC Hydro has recently modified its SOC, reflecting FERC’s Order No. 717 Clean Energy Act continues to emphasize value of wholesale electricity trade and private sector opportunity 10

EVOLVING TRANSMISSION INDUSTRY STANDARDS

OATT as Industry Standard The evolving pro-forma OATT remains the North American industry standard BC Hydro remained generally aligned with the changes of OATT over time Other non-jurisdictional entities to adopt OATT: The Bonneville Power Administration is not federally regulated, but uses the FERC 888 pro forma OATT to remain consistent with industry practice in the West Hydro Quebec TransEnergie also uses a FERC 888 pro forma tariff for similar reasons 12

13 BPA Idaho Power PacifiCorp Northwestern APSPNM NV Energy Sierra PSCo/Xcel FPL Southern Entergy TVA Duke Progress Avista Puget Portland BCH SaskPower Transenergie Hydro Quebec Newfoundland & Labrador Hydro Regions with Pools vs. FERC 888 OATT

Standards of Conduct Comparison: General Principles BC HydroBPA Treat all transmission customers, affiliated and non-affiliated, on a non- discriminatory basis Transmission function employees must function independently of marketing function employees BCH employees and affiliates are prohibited from disclosing or using a conduit to disclose non-public transmission information to BCH’s marketing function employees BCH must provide equal access to non-public transmission function information to all its transmission customers, affiliates and non- affiliates Transmission function employees must function independently of marketing function employees BPA employees and affiliates may not disclose, or use a conduit to disclose, non-public transmission function information to BPA’s marketing function employees BPA will comply with SoC in transparent manner through compliance with various posting requirements and will provide equal access to non-public transmission function information to all its transmission customers, affiliates and non-affiliates 14 Both BCH and BPA follow FERC’s SoC General Principles

OATT is Still Western Standard There is no practical alternative for BC Hydro to operate without an OATT: Trade objectives require following industry standards and regional practices, and preserving Powerex’s PMA BC public policy has explicitly and repeatedly rejected adopting a competitive energy market This places BC Hydro in the mainstream of transmission providers in the West It places BC in the mainstream of energy market structures in the West Exceptions: Alberta California 15

Comparable Access UNDER OATT

Impacts of OATT Design FERC aims to enhance transmission use in order to enhance wholesale electricity markets FERC also aims to preserve the rights of existing customers and native load OATT aims to eliminate undue discrimination so that all eligible customers have a fair and non- discriminatory opportunity to use the transmission system OATT is not designed to ensure that there is result- based equality for all eligible customers 17

Impacts of OATT Design FERC has determined that it is not discriminatory when scheduling practices have disparate impacts on various types of users FERC has not sought to use “set asides” or other tools to balance outcomes Neither the BCUC nor BC policy makers have sought to modify FERC’s approach Seeking to provide equality of opportunity Not seeking to ensure equality of result 18

Key Takeaways Key to non-discrimination is that BC Hydro’s terms and conditions of service are equal between BC Hydro’s own use of the system and third parties’ use OATT provides the standard for non-discriminatory access in the West OATT provides comparable access to transmission services but does not ensure equality of results 19