MKE4 Rearrangement -Updated Drawings -Visit to ECA4 -Visit to LSS4 -SPS Safety File -Safety during intervention MKE4 Rearrangement - TCM 25 August 20151.

Slides:



Advertisements
Similar presentations
PRMS PRMS Concepts Categorisation Tree Ticket Progression Tickets Creation Assignment Groups Notifications to the Users.
Advertisements

Safety at CERN La sécurité au CERN
SAFETY SERVICES PROVISION I. Bejar Alonso. Transition SC to Service Provider – From 1 st January Mechanical Inspections Pressure Lifting Safety valves.
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
À peu près/environ. about/approximately Cest tout pour aujourdhui.
Christoph BALLE, Safety Training CERN Induction Programme Safety at CERN La sécurité au CERN.
F 3 premier quiz de l’itinéraire Les corrections et Les renseignements pour faire un « retest. »
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 18 Feb 2015 F.Roncarolo 18 Feb
SPS Access Project PL, EMP Chamonix XV, EDMS: SPS Access Safety System Patrick Lienard, Elena Manola-Poggioli on behalf of the SPS Access.
Christoph BALLE Safety Training Safety at CERN La sécurité au CERN.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
Barriere O, Le Roux P
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
1 User’s perspectives on the management of Elements Important for Safety (EIS) AMMW - CERN Anne Funken, Marc Tavlet / BE-ASR-SU.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
YETS status report TCM Francesco castronuovo.
YETS status report TCM Francesco castronuovo.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Safety Documentation Formerly an exotic unknown, today part of the work!
TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Christoph BALLE Safety Training Safety at CERN La sécurité au CERN.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Electrial Safety LS2 days November 2016 AP
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Linac4-PSB 160 MeV connection readiness review
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
ABT-EC EYETS Activities 2nd reports
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
YETS & LS2 Works EN-El on LHC / Power distribution
Dielectric Oil Installations
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
Hot Air Balloon Workshop
Inventory for the non-radioactive waste
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
De-cabling strategy during YETS
# 56- FIRE PREVENTION (Decision Needed)
EN-HE SPS works during EYETS
EN-HE L2 – PS – PSB – TT2 works during YETS
Status with crucial LSS5 kicker transmission line cables
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
LINAC 3 Meeting ICL machines Injectors
Open Points and More… Giulia / Michael / Sebastien / Maria.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Open Days 2019 focus on underground visits sites
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

MKE4 Rearrangement -Updated Drawings -Visit to ECA4 -Visit to LSS4 -SPS Safety File -Safety during intervention MKE4 Rearrangement - TCM 25 August 20151

Drawings ECA4 – Present configuration MKE4 Rearrangement - TCM 25 August Drawings for present configuration were found ! - Drawings now up to date. - Needs to be validated and published to CDD (Drawing number problem ?)

Drawings ECA4 – Future configuration MKE4 Rearrangement - TCM 25 August Drawings up to date. - Minor corrections requested - Needs to be validated and published to CDD (Drawing number problem ?) Should we show the spare parts (PFN/ switches/DB) ?

Drawings LSS4 – Present configuration MKE4 Rearrangement - TCM 25 August Drawings up to date for present configuration. - Needs updated drawings for future configuration. -Needs to be validated and published to CDD  Required for ECR ! LSS4 Integration drawing to be updated by EN/MEF and TE/VSC

Visit to ECA4 – Water pipes MKE4 Rearrangement - TCM 25 August Two visit with people from: TE/ABT, EN/MEF, BE/ASR, DGS/SEE, etc… Water distribution for GEN1: -Remove water pipes on ground -Remove clarinette behind pillar => Done by FPS. (GEN2 is connected to another clarinette).

Visit to ECA4 – Cable support MKE4 Rearrangement - TCM 25 August Cable support for GEN1: -Remove cables -Remove cable support / pillars Copper plan to be cut and removed => Done by FPS. Cleaning of concreate after removal of copper plan (glue): => Done by external company ? (Patrick Vincent EN/MEF)

Visit to ECA4 – Barrier not on wall MKE4 Rearrangement - TCM 25 August Reduction of kicker zone: -Remove old barrier and move it to close zone. => Done by external company ? (Patrick Vincent EN/MEF) Problems: -Water pipes -Cables support -Wall not vertical => Difficult to completely close the kicker area HSE (Ana): L’idéal serait que les parois coupe-feu vont jusqu’au mur pour avoir une étanchéité maximum du local et par conséquente la meilleure protection contre un possible feu.

Visit to LSS4 / LSS6 during next TS Visit of LSS4 / LSS6 during next TS: - Impact: / 68484– Waiting for approval - With people from TE/ABT, EN/MEF, BE/ASR, DGS/SEE, etc… => Please give me the list of people to add to the Impact. MKE4 Rearrangement - TCM 25 August 20158

SPS Safety files Contact BE/ASR : Anne Funken / Lisa Kobzeva SPS safety file not yet available, in preparation. -BE/ASR will prepare the safety file. -Nothing to do from our side, just answer questions… -Needs a visit to LSS4 (planned for next TS). -Needs updated drawing Present / Future Example: PS safety files available on EDMS: CERN => Invite Lisa or Anne to explain about SPS safety file in another TCM ? MKE4 Rearrangement - TCM 25 August 20159

SPS Safety files - Questions Already answered some questions (Thanks to Francesco): -Type of oil in generators: Code SCEM : : -Quantity of oil in generators (ECA4): -1x PFN = 1200 L -2x Switch = 1000 L -1x TDR = 10 L => ~ 3210 L per generator Total present configuration: 5x generators = ~16000 L Total future configuration: 1x generator = ~ 3200 L -Type of material used for barrier = Fire resistant. -Etc.. MKE4 Rearrangement - TCM 25 August

Safety during Intervention Contact DGS/SEE: Ana Marta Formigo Da Cunha ‘Launch Safety Agreement’ to come after vacations… Already some info on ‘la manipulation, transport et stockage, d’huile’: 1 – Contacter Claudia Bruggmann du Centre de stockage de déchets chimiques bât Identifier le récipient avec l’étiquette 10 ou 11 du SCEM – Il faut tenir en compte les règles de Sécurité CERN suivantes: -SR-C - Agents chimiques -GSI-C1 - Prévention et mesures de protection -Guide de Sécurité C Stockage des agents chimiques dangereux => TE/ABT procedure for manipulation and transport of oil ? MKE4 Rearrangement - TCM 25 August