DES Virtualization IPMA Briefing 2012. A New Opportunity - DES Legislative mandate to consolidate 5 agencies into DES Consolidate support to DES and support.

Slides:



Advertisements
Similar presentations
ARIZONA DEPARTMENT OF ADMINISTRATION INFORMATION SERVICES DIVISION - DATA CENTER.
Advertisements

The System Center Family Microsoft. Mobile Device Manager 2008.
System Center 2012 R2 Overview
What’s New: Windows Server 2012 R2 Tim Vander Kooi Systems Architect
What’s in Windows Server 2012 for SQL Server N.Raja / James Crawshaw Technology Specialists - Microsoft DBI332.
Gary Stronach Percy Gouchie Technical Service Delivery November 24, 2009 Virtually …transforming health care.
DataCore Software Proprietary Information Virtualize Your Storage! DataCore and Citrix Simple & Affordable Virtualization Unmatched Agility, Productivity.
UNS Energy Corp / Tucson Electric Power Case Study: Virtualization: Lower IT Costs and Improve Operations Speaker: Chris Rima, Supervisor, Infrastructure.
Cisco and NetApp Confidential. Distributed under non-disclosure only. Name Date FlexPod Entry-level Solution FlexPod Value, Sized Right for Smaller Workloads.
High memory instances Monthly SLA : Virtual Machines Validated & supported Microsoft workloads Price reduction: standard Windows (22%) & Linux (29%)
Leveraging Virtualization for BAR Partnership for Emergency Planning, 2010.
Virtual techdays INDIA │ 9-11 February 2011 Cross Hypervisor Management Using SCVMM 2008 R2 Vikas Madan │ Partner Consultant II, Microsoft Corporation.
TechNet and Community Tour - Dynamic IT Dynamic Desktop Deployment Level Advanced.
Virtualization for Cloud Computing
Yes, yes it does! 1.Guest Clustering is supported with SQL Server when running a guest operating system of Windows Server 2008 SP2 or newer.
1 AFCOM 2011 studyAFCOM 2011 study 2 Information Week 2011 surveyInformation Week 2011 survey 3 Worldwide Executive Council 2011 survey on 100 CIOsWorldwide.
ESX & Storage M.Theeuwes. 2 Contents l Océ l Centra storage l ESX l Virtualisation l ESX Storage l ESX backup l Testlab l demonstration.
Copyright © 2005 VMware, Inc. All rights reserved. VMware Virtualization Phil Anthony Virtual Systems Engineer
Virtualization – to cluster or not to cluster 4/17/2012.
Implementing Failover Clustering with Hyper-V
VMware vCenter Server Module 4.
Storwize V7000 IP Replication solution explained
Virtual Desktop Infrastructure Solution Stack Cam Merrett – Demonstrator User device Connection Bandwidth Virtualisation Hardware Centralised desktops.
Elad Hayun Agenda What's New in Hyper-V 2012 Storage Improvements Networking Improvements VM Mobility Improvements.
VMware vSphere 4 Introduction. Agenda VMware vSphere Virtualization Technology vMotion Storage vMotion Snapshot High Availability DRS Resource Pools Monitoring.
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Michal Kwiatek, Juraj Sucik, Rafal.
Migrating Applications to Windows Azure Virtual Machines Michael Washam Senior Technical Evangelist Microsoft Corporation.
CTS Private Cloud Status Quarterly Customer Meeting October 22, 2014.
Senior Design – Spring 2009 Richard Gory Focus: Networking & Web.
The Era of the Cloud OS: Transform the Datacentre

Los Angeles County eCloud Overview November 26, 2012.
Module 12: Designing High Availability in Windows Server ® 2008.
SAIGONTECH COPPERATIVE EDUCATION NETWORKING Spring 2009 Seminar #1 VIRTUALIZATION EVERYWHERE.
W-04: Experiences in Virtualization Panelists: Randy Moore, ECY 1.
Appendix B Planning a Virtualization Strategy for Exchange Server 2010.
VSolution Playbook VIRTUALIZED SAN SOLUTION FOR VMWARE SMB.
Copyright © 2011 EMC Corporation. All Rights Reserved. MODULE – 6 VIRTUALIZED DATA CENTER – DESKTOP AND APPLICATION 1.
Virtualizing and Centralizing Network Infrastructure at a Decentralized Federal Statistical Agency Elvera Gleaton Joseph.
Planning and Designing Server Virtualisation.
ITServices Virtualization Terry Black January 2013.
What’s New in Windows Server 2012 David Tesar Technical Evangelist WSV311.
Senior Design III Kurt Roberts.  Clients  Telnet  Internet Explorer  Microsoft Office  Server Virtualization  ~30 Servers, Many low utilization.
Microsoft Virtual Academy Module 8 Managing the Infrastructure with VMM.
Windows Azure Migrating Applications and Workloads Speaker Title Organization.
IT Pro Day Windows Server 2012 Hyper-V – The next chapter Michel Luescher, Senior Consultant Microsoft Thomas Roettinger, Program Manager Microsoft.
VMware vSphere Configuration and Management v6
Queensland University of Technology CRICOS No J VMware as implemented by the ITS department, QUT Scott Brewster 7 December 2006.
20409A 7: Installing and Configuring System Center 2012 R2 Virtual Machine Manager Module 7 Installing and Configuring System Center 2012 R2 Virtual.
Take Confident Steps Towards Virtualization Phil Utschig Solutions Architect September 15, 2008 Springfield, IL.
Cloud Computing Lecture 5-6 Muhammad Ahmad Jan.
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Juraj Sucik, Michal Kwiatek, Rafal.
Scalable and elastic Enterprise scale and performance for the largest workloads Shared- nothing live migration Hyper-V Network.
© 2015 VMware Inc. All rights reserved. Software-Defined Data Center Module 2.
Practical IT Research that Drives Measurable Results Mitigate Costs & Maximize Value with a Consolidated Network Storage Strategy.
Module Objectives At the end of the module, you will be able to:
Office of Administration Enterprise Server Farm September 2008 Briefing.
Extending Auto-Tiering to the Cloud For additional, on-demand, offsite storage resources 1.
IT Pro Day Windows Server 2012 Hyper-V – The next chapter Michel Luescher, Senior Consultant Microsoft Thomas Roettinger, Program Manager Microsoft.
U N C L A S S I F I E D LA-UR Leveraging VMware to implement Disaster Recovery at LANL Anil Karmel Technical Staff Member
Commvault and Nutanix October Changing IT landscape Today’s Challenges Datacenter Complexity Building for Scale Managing disparate solutions.
Azure Site Recovery For Hyper-V, VMware, and Physical Environments
vSphere 6 Foundations Beta Question Answer
Installing VMware ESX and ESXi
iSCSI Storage Area Network
Virtualization OVERVIEW
Cloud Adoption Framework
Welcome! Thank you for joining us. We’ll get started in a few minutes.
20409A 7: Installing and Configuring System Center 2012 R2 Virtual Machine Manager Module 7 Installing and Configuring System Center 2012 R2 Virtual.
Storage Trends: DoITT Enterprise Storage
Presentation transcript:

DES Virtualization IPMA Briefing 2012

A New Opportunity - DES Legislative mandate to consolidate 5 agencies into DES Consolidate support to DES and support 2 existing agencies and 1 new agency IT support responsibility includes OFM, Governor’s Office and CTS Challenges abound – disparate storage, duplicate applications, redundant infrastructure, firewall separation

DES at Inception

By the Numbers… DES as new agency October 1 st, 2011 –345 servers, 63% virtualized –VMware was primary platform –3 SAN enabled virtual farms

Virtual Objectives Consolidate hardware in single “vFarm” Extend layer 2 to virtualize existing pre- DES agency infrastructures Support “come as you are” vDC to expedite virtualization and consolidation Build new DES branded virtual data center topology for DES services eClient and eApp

Virtual Data Centers…

DES Future Services

Present Virtual Work Virtualize 93 more servers to hit 90% Migrate 3 ESX farms to 1 shared farm Scale to support anticipated Windows server growth of 7 – 10% per year Build out network to support enterprise services and desired efficiency

DES Shared Virtual Platform VMware ESX4i HP DL380 G7 rackable servers RAM (lots of it) EqualLogic iSCSI storage Licensing at the processor level More RAM! * RAM is always limiting factor

Storage iSCSI based 1GB I/F ethernet storage TB of RAID50 SAS & SATA disk 16% in near term snapshots Thin provisioned, over provisioned Replicated to TierPoint data center Fully virtualized

Layer 2 Extensions enabled… Virtualize “in place” – no change for existing applications Built-in backup / recovery –vRanger immediately picks up new guests Shared storage scalability –Growth accommodated at multi-agency level Operational mgmt by designated leads –Spread vFarm mgmt to key leads with appropriate training

Layer 2 “Extended”

Virtual Console Virtual Console roles –Resource Pool Admin –Resource Pool Server Admin Attempted “linked consoles” –End client still needs direct access to primary console Jumpbox model –RDP to console, run locally with pre-DES AD accounts set to virtual Data Centers

VMware Converter VM converter “needs” –Virtual Console enabled guest within each pre-DES network –Migration host with kernal (ip) on each client network –No affinity during transition to invidual VM host

Security pre-DES agencies had different security policies and data risks New security team and unified strategy at DES key enabler Building to support security spectrum –vLAN separation –vSwitch separation –vFirewall security & audit

Why Virtualize? Story 1 AFRS Data Warehouse –Problem: Existing DW is operating 2 Windows 2003 x64 servers with SQL Server 2005 and team wants to migrate to Windows 2008 R2 x64 with SQL Server 2008 R2 Enterprise. Migration of data and transition is expected to take in excess of a month. –Server 1: 2.85 TB of storage on 3 SAN volumes F, G, H –Server 2: 1.65 TB of storage on 2 SAN volume F, G

Why Virtualize? Story 2 ERDC P20 Data Warehouse –Problem: The new P20 Data Warehouse for the Economic Research & Development Council (ERDC) needed the ability to “recover” a full infrastructure platform (QA, DEV, Sandbox or Prod) to any given day / week in recent history.

Lessons Learned Cross train early and often Change management and disciplined approach Keep capacity for maintenance (n+1+ a little more) Script configurations wherever possible for consistency (powershell or ???) Don’t assume – validate throughput, monitor links for even load distribution, etc. (Windows perfmon, VMware esxtop, switch CLI) Don’t underestimate RAM and storage Have your customers tout your success (nothing sells your service more than a happy customer) Patience – build in quality rather than rework

Questions