NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October 2011 1 ANALYSIS OF THE PLC SYSTEMS FOR JEBBA-SHIRORO TRANSMISSION LINE 1 A. Abdulkarim &

Slides:



Advertisements
Similar presentations
Seminar Report On Digital Power Line Carrier Communication
Advertisements

Requirements Based Evaluation of BPL for Power System Sensing, Command and Control Applications Erich W. Gunther EnerNex Corporation
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
POWER QUALITY BACKGROUND & ELEC-SAVER TVSS
QUALITY AND TECHNOLOGY
Sistan & Balouchestan Electric Power Distribution Company
Veilux Fiber Optic Transceiver
Energy-Efficient Computing for Wildlife Tracking: Design Tradeoffs and Early Experiences with ZebraNet Presented by Eric Arnaud Makita
Applications of Wireless Sensor Networks in Smart Grid Presented by Zhongming Zheng.
Chapter Nine Information Technology and E-Commerce © 2007 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin Introduction to Business.
Definition Reliability is a general quality of an object – an ability to perform a desired function, sustaining the values of rated operational indicators.
Institute of Technology Sligo - Dept of Computing Many Roads To Home Paul Flynn.
ECE 4006 Senior Design Project Talal Mohamed Jafaar Ibrahima Bela Sow Mohammad Faisal Zaman Bringing Gigabit Ethernet to the Masses Supervisor: Dr. Martin.
VIGNAN INSTITUTE OF TECHNOLOGY AND MANAGEMENT
How to efficiently use the electrical distribution underground cables for Power Line Communications and to achieve the Smart grid’s goals. Energy Smart.
1.1 Chapter 1 Introduction Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
Many Roads To Home. LAN Roads UTP STP Coaxial Fiber Optics.
White Papers – publication: IEEE PES Transactions – note these papers are not overly technical, may not be appropriate placement. T&D World – good audience.
Chapter 1: Overview Lecturer: Alias Mohd Telecommunications Department Faculty of Electrical Engineering UTM SET 4573: Data Communication and Switching.
EMBEDDED WEB SERVER. CONTENT: 1.ABSTRACT 2.INTRODUCTION TO EMBEDDED SYSTEMS 3.INTRODUCTION TO EMBEDDED WEB SERVER 4.BLOCK DIAGRAM 5.POER SUPPLY 6.COMPONENT.
1 SOUTHERN TAIWAN UNIVERSITY ELECTRICAL ENGINEERING DEPARTMENT Gain Scheduler Middleware: A Methodology to Enable Existing Controllers for Networked Control.
A N OPTIMAL RELIABILITY ALLOCATION METHOD FOR DIGITAL SUBSTATION SYSTEMS Y UZHOU H U, P EICHAO Z HANG, Y ONGCHUN S U, Y U Z OU Adviser: Frank, Yeong-Sung.
0 Invensys Energy Management Division ZigBee. 1 Invensys Proprietary Data Energy Management Overview The Basics: Solutions and products that help customers.
Power Line Communication using an Audio Input
Instituto de Investigaciones Eléctricas
All rights reserved © 2010, Mobiserve Prepared By: RIZWAN AHMED RAFIQ Operation Support Engineer (Training & Consultancy) ALCATEL BTS.
Transition of Electric Grid of Bangladesh to the Smart Grid Presented by: Abir Chowdhury, ET S.M. Eftehar Uddin Chowdhury, ET Department of.
Mr C Johnston ICT Teacher
Completed/planned activities of AGH in VD-A Miroslaw Kantor, Marcin Niemiec Department of Telecommunications AGH University of Science and Technology VD-A.
CONTENTS 1. Introduction 2. Smart Metering System 3. How does the system work? 4. Advantage of AMR system Electric company benefits.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Power Line Carrier Communication VAIBHAV RAI EN VI-B
A PRACTICAL TRAINING SEMINAR ON PLCC
NETWORKING COMPONENTS Buddy Steele Assignment 3, Part 1 CECS-5460: Summer 2014.
Embedded Design Using ARM For Strong Room Security System
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
INTELLIGENT NETWORKS YOUR COMMUNITY OUR COMMITMENT.
Name Of The College & Dept
Realization of Home Appliances Control System based on Power Line Communication Technology.
Component 4: Introduction to Information and Computer Science Unit 7: Networks & Networking Lecture 1 This material was developed by Oregon Health & Science.
Chapter 1 The Data Communication Industry The best way to approach data communication The data communication industry Challenge & solution to business-oriented.
AIRCRAFT RELIABILITY Y.K.Sinha Rajalakshmi Engineering College AIR TRANSPORTAION AND AIRCRAFT MAINTENANCE (AE1012)
By:Shruthi Srinath 4JN03CS046 Under the guidance of Poornima K.M M.Tech., Lecturer, CS&E Dept.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Wireless Communication Project Ideas for Engineering Students.
Protection of Power Systems
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
H IGH LEVEL SECURITY SYSTEM USING M E M S TECHNOLOGY BY M.PAVANI G.KEERTHI D.SWAPNA.
BATCH MEMBERS R.ABHISHEK-08N41A0401 K.DHEERAJ REDDY-08N41A0412 S.RAJENDRA REDDY-08N41A0458 JYOTHISHMATHI COLLEGE OF ENGINEERING AND TECHNOLOGY,TURKAPALLY.
Power System Protective Relaying-Part One
6 Week industrial Training Presentation
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
GOVERNMENT ENGINEERING COLLEGE DAHOD
Beyond the Business Case: AMR Operational Experiences and Benefits
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
IG BASED WINDFARMS USING STATCOM
Architecture for security monitoring in IoT environments
SHORT CIRCUIT MONITORING BY USING PLC & SCADA
Proposed Oxygen Concentration Monitoring System of Food Packaging
Presentation on Power Line Communication
International Africa University Faculty of Engineering Eight Semester
Power System Protective Relaying-Part One
Information Technology and E-Commerce
Presentation transcript:

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October ANALYSIS OF THE PLC SYSTEMS FOR JEBBA-SHIRORO TRANSMISSION LINE 1 A. Abdulkarim & 2 Y.A. Adediran Department. Of Electrical & Electronics Engineering University of Ilorin, Ilorin 1 2

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October INTRODUCTION Power line communication (PLC): a communication network technology using pre-installed power lines which provide the electricity to the household or the building used to provide services such as Internet access, automatic meter reading (AMR) and home networking

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October INTRODUCTION PLC technology could let the power transmission companies open lucrative revenue streams, – by integrating electricity supply with broadband telecommunication access – by providing high speed and reliable communication traffic including Internet access

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October INTRODUCTION PLC’s other applications: both industrial control and home automation over power lines with economical and reliable solutions long-distance monitoring of alarms and air- conditioning systems, comfortable control of intelligent household appliances, and off-site reading of electricity meters via the power grid

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October INTRODUCTION Aim of paper: Reliability analysis of PLC systems connected to the Jebba-Shiroro transmission line. Reliability: probability that a device or system will perform its prescribed function adequately, for the period of time intended, under specified operating conditions.

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October Phase-to-Earth Coupling Circuits PHCN uses Phase-to-Earth Coupling Circuits as one of the media of communication between different parts of the grid series reliability block diagram (RBD) assumed as failure of any component in system leads to total system failure Relevant failure data obtained from NCC, Oshogbo

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October Phase-to-Earth Coupling The general reliability of the power line communication phase-to-earth coupling circuit is given by Subscripts: RT=receiver/transmitter unit, CO=coax cable unit, MX=matching transformer, CF= coupling filter, CC=coupling capacitor, PU=protection unit, LT=line trap, XL=transmission line

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October Phase-to-Earth Coupling Substituting the components` failure rates, the general reliability equation of the power line communication phase-to-earth coupling circuit is λ=failure rate, t=operating time

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October Phase-to-Earth Coupling Jebba-Shiroro 330 kV network reliability plot:

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October PLC Contribution to the Communication Network Failure PHCN uses other means of communication apart from PLC; these include: GSM, Fibre optics and VSAT But, PLC is the major means of communication with different parts in the Nigerian grid

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October PLC Contribution to the Communication Network Failure

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October PLC Contribution to the Communication Network Failure :decrease in %-age of PLC contribution to communication systems’ failures due to introduction of other communication media like GSM and NITEL : rapid increase as a result of NITEL problem which makes PLC to contribute the highest to system failure 2009: recorded highest communication network percentage failure b/c the PLC network was upgraded by removing some aged equipment such as the line trap unit that had been in operation since 1976, thus the decrease observed in year 2010.

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October COMPONENTS’ IMPORTANCE ANALYSIS (CIA) Purpose: to identify the weakness(es) in a system and to quantify the impact of component failures to identify the components that should be modified, improved, or replaced with higher quality ones indicates the improvement of the system reliability when the component under consideration has been replaced by a perfect component. results therefrom are key contributors to the system design, tuning, and maintenance activities

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October Components’ Importance Analysis (CIA) Birnbaum’s component importance used: = reliability importance of the k-th component for B-th coupling circuit. R S (t) and F S (t) are the system reliability and unreliability respectively at time t

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October Components’ Importance Analysis (CIA)

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October Components’ Importance Analysis (CIA) Observations: – protection unit has the highest reliability importance – i.e. the protection unit has the highest influence on the system reliability; – it contributes most to system failure; – transmitter/receiver unit, coaxial cable, coupling capacitor units, matching transmitter and line trap follow in that order.

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October CONCLUSION AND RECOMMENDATIONS Reliability figures for the phase-to-earth coupling connected to the Nigerian grid for the last 11 years are very low when compared to the expected reliability figures obtained using RBD model. transmission line distance has little effect on the reliability figures of the PLC system most of transmission line failures are as a result of vandalism.

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October Conclusion and Recommendations most of the PLC network failures are from the protection unit and the receiver/transmitter unit during the 11 years under investigation It is therefore recommended that these units should more often be replaced and with higher reliability components for increased availability of the overall system

NSE Industrial Division Intn'l Conf. & AGM, Lagos, 4-6 October THANK YOU ALL