Network Analysis for Otter Tail Power Presented by Les Jarriel Power Software & Consulting Inc. Support by Bob Endahl (OTP) Dr.

Slides:



Advertisements
Similar presentations
LOGO Safety Through Prevention – Safe Switching Using Smart Key Technology Shuqiang Jin, Unitech, Zhuhai, China Nan Liu Youru Huang, SERCC EPRI's 14th.
Advertisements

Arsalan A Rahim EED, UET Lahore. The Edit Mode is used to create a new case or to modify existing cases. In Edit Mode: Create a new case Create a.
CC SQL Utilities.
XProtect ® Professional Efficient solutions for mid-sized installations.
LeadManager™- Internet Marketing Lead Management Solution May, 2009.
Agilent’s MX QPCR Software Tutorial Field Application Scientist
XProtect ® Express Integration made easy. With support for up to 48 cameras, XProtect Express is easy and affordable IP video surveillance software with.
Modeling Electrical Systems With EMTP-RV
Sistan & Balouchestan Electric Power Distribution Company
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
MCS-Connect Intro to Connect Connection and Setup Display Menus Graphics Uses in troubleshooting Overview.
1 Parker Factory Display – The Next Generation Next Generation:
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
CCMDB 7.2.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
PSS®E 34.0 Release Webinar 23 April 2015
Distribution Management System Implementation at Florida Power & Light
NERC Lessons Learned Summary March NERC lessons learned published in March 2015 Two NERC lessons learned (LL) were published in March2015 LL
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
NERC Lessons Learned Summary
1 Agenda Overview Review Roles Lists Libraries Columns.
Professional Informatics & Quality Assurance Software Lifecycle Manager „Tools that are more a help than a hindrance”
UCTE CIM VISUALIZATION & EDITING TOOL Jun Zhu, Power Info LLC CIM User Group Meeting, Genval 2009.
Supervisory Systems.
G650 Generator Protection & Control System
Getting Planning Tools Closer To Real-Time and Operation CIM User Group Meeting Austin, TX October 23-26, 2007 Loris Arnold (516)
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
April 3, 2001 Washington, DC 2001 EMS Users Group.
High-Speed, High Volume Document Storage, Retrieval, and Manipulation with Documentum and Snowbound March 8, 2007.
1//hw Cherniak Software Development Corporation ARM Features Presentation Alacrity Results Management (ARM) Major Feature Description.
WebFOCUS Developer Studio Update Dimitris Poulos Technical Director September 3, 2015 Copyright 2009, Information Builders. Slide 1.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Jay Britton
Denise Luther Senior IT Consultant Practical Technology Enablement with Enterprise Integrator.
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange? - Schematic.
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
For Version 6.0 and later Lattice3D Reporter Tutorial For Version 6.0 and later LATTICE TECHNOLOGY, INC.
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
This is an overview of sophisticated configuration tools for online selling processes of network solutions. The tools address a very wide range of design.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
Lyndonville Electric Department Feasibility Analysis Review December 2,
Gestionnaire du Réseau de Transport d 'Electricité 2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation Experiences and practices.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
NetNumen T31 Common Operations. Objectives Master Basic Configurations of T31 Master Common Operations of T31.
KEM_Cespedes_A1 Colombia Session 3 – Block 1 Barcelona May ACCURATE MODELING FOR LOSSES REDUCTION USING A REAL-TIME POWER FLOW AT ENELVEN.
EMARS 3.9 Familiarization November Logging In Larger Font No overlap of text and picture.
Network Model Management System (NMMS)
MCS-Connect Revision - 12/22/2015.
August 2003 At A Glance The IRC is a platform independent, extensible, and adaptive framework that provides robust, interactive, and distributed control.
NERC Lessons Learned Summary LLs Published in September 2015.
Consumers Energy Advanced Metering Infrastructure Review and Feedback Utility AMI / Open HAN Meeting August 15, 2007.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
SmartClient for Salesforce – Office 365 Excel Solution Walk-through.
© 2012 Autodesk Support Your Design Process with the AutoCAD Map3D Interface to WindMil Using MultiSpeak Frank Misurec Stephen Brockwell Brockwell IT Consulting.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Nodal Planning Go Live Austin, TX February 3, 2011
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
UCTE CIM Visualization & Editing Tool
Visibility Ramu Ramanathan 10/1/2007.
Utility Needs and Smart Grid for Major Storm Events
Web Routing Designing an Interface
DELLSOFT Technologies Pvt. Ltd.
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
Analysis models and design models
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

Network Analysis for Otter Tail Power Presented by Les Jarriel Power Software & Consulting Inc. Support by Bob Endahl (OTP) Dr. Shouming Zhang, Ken Audet, Sam Phillipson (Siemens PTI)

OTP Overview ~127,000 customers miles of transmission ~650 MW generating capacity Operational Model buses substations switches real-time measurements

PNAA (Power Network Analysis Application)PNAA (Power Network Analysis Application) Initially planned as add-on to the existing EMSInitially planned as add-on to the existing EMS Project ConcernsProject Concerns –Low voltage ( kV) network regions with limited telemetry –Costs had increased since original quotation Project Overview

Technical Challenges 1.Pockets of unobservable radial and loop networks 2.Includes unmetered cap banks controlled by voltage 3.Use distribution factors based on energy meters 4.Connects to high voltage network with potential meter errors

An Alternate Approach Standalone PNAA Provides: PSS/E model import (starting point)PSS/E model import (starting point) Fully-integrated one-line displaysFully-integrated one-line displays Single-substation, Map Board and Geographic OverviewSingle-substation, Map Board and Geographic Overview Graphical model editing capabilityGraphical model editing capability User-configurable tabular displaysUser-configurable tabular displays Support for Python scriptingSupport for Python scripting Close interaction between Vendor and CustomerClose interaction between Vendor and Customer

A Unique System Architecture

PNAA System Configuration

Standalone System Implications Separate displays (PNAA vs. SCADA)Separate displays (PNAA vs. SCADA) Separate databaseSeparate database ICCP mappings requiredICCP mappings required –Many going to ISO or RC anyway Separate infrastructure (no delays)Separate infrastructure (no delays) Costs – more options with standaloneCosts – more options with standalone Vendor supportVendor support

Project Steps Start with a comprehensive PSS/E modelStart with a comprehensive PSS/E model Reduce the model sizeReduce the model size –Use 3 rd party tool to equivalence Import the reduced model into PNAAImport the reduced model into PNAA Independently validate the conversionIndependently validate the conversion –Export to PSS/E and compare PF results Simultaneously build one-line displays while adding breaker detail to the modelSimultaneously build one-line displays while adding breaker detail to the model Import ICCP measurement mappings and ‘plug in’ the OPC/ICCP adaptersImport ICCP measurement mappings and ‘plug in’ the OPC/ICCP adapters SE Tuning: start small and build outSE Tuning: start small and build out

PNAA – Features Network Analysis Functions  Topology Analysis  Power Flow  State Estimator  Contingency Analysis (fully supports complex user-defined contingencies and protection schemes) User Interface  Single-substation, geographic overview and full ‘map board’ one-line diagram displays  Custom symbol support with built-in editor  Simultaneous measurements-and-results display  Color-coded and animated flow arrows  Color contouring by flow or voltage violation  Configurable spreadsheet views  1-click toggle between real-time and study modes

Geographic Displays

Map Board Displays

Color Contouring

2-Way Navigation

State Estimator Performance (< 2s for OTP model) Accurately estimates sub-transmission (low voltage) areas with limited telemetry Supports flow measurements on breakers/switches Supports ‘hybrid’ operations/planning model Supports telemetered flow limits Supports direction-dependent flow limits Bad measurement identification Automatic switch status correction Powerful diagnostic/tuning interface Configurable results publication to ICCP Highlights

SE Tuning – Topology Error Detection SCADA: 10 MW → SE: ← 13 MW SCADA: ← 10 MW SE: ← 33 MW

Overcoming the Primary Technical Challenge Unobservable Islands Conventional Approach: Pseudo- Measurement TechnologyConventional Approach: Pseudo- Measurement Technology New Approach: Virtual Real-Time Measurements TechnologyNew Approach: Virtual Real-Time Measurements Technology Automatically identify unobservable islands and corresponding feeder measurementsAutomatically identify unobservable islands and corresponding feeder measurements Apply a new algorithm to sum loads and losses which takes into account larger impedance and MW lossApply a new algorithm to sum loads and losses which takes into account larger impedance and MW loss Take into account the effects of shunts in unobservable islandsTake into account the effects of shunts in unobservable islands

Virtual Real-Time Measurements Technology

Graphical Model Editing Add equipmentAdd equipment –Intuitive connectivity –1-click breaker insert –Copy/Paste equipment Reconnect equipmentReconnect equipment Delete equipmentDelete equipment Edit equipment attributesEdit equipment attributes Synchronize with model changesSynchronize with model changes

Custom Tabular Displays Start with standard default displayStart with standard default display Filter by area, substation, voltage level, device type, etc.Filter by area, substation, voltage level, device type, etc. Hide unwanted columnsHide unwanted columns Edit visible column widthsEdit visible column widths Save view configurationSave view configuration Unlimited number of custom “views”Unlimited number of custom “views” Each saved view is a sub-tabEach saved view is a sub-tab 1-click activation1-click activation Sort by any columnSort by any column

Custom Display Example

Project Issues Robust convergence after initial tuningRobust convergence after initial tuning Customer took ownershipCustomer took ownership –Minimal continued support needed Extended project timelineExtended project timeline –Many software enhancements were included (now part of the base product) Large model footprintLarge model footprint –Bigger than expected (with MISO and Canada)

Project Notes External model updatedExternal model updated –Import large PSS/E model –Use automated Model Merge function to replace the external PNAA is now used for regional training seminarsPNAA is now used for regional training seminars –Includes joint Black Start studies Model sharing with neighborsModel sharing with neighbors –Import/export PSS/E and CIM/XML

Keys to Success Force Dependence on SE (drop other tools)Force Dependence on SE (drop other tools) Improve Operators Interface (high level)Improve Operators Interface (high level) Start Small and Expand (quality over quantity)Start Small and Expand (quality over quantity) Separate Network Apps from SCADA (system, people, process)Separate Network Apps from SCADA (system, people, process)

Questions ?