0 The Netherlands: Implementation of axis 3 in practice Erik Mulleneers, Policy Coordinator Rural Development Programme, Ministry of Agriculture, Nature.

Slides:



Advertisements
Similar presentations
Terms. 1. Globalization 2. Financing 3. Inputs.
Advertisements

1 Programming period Strategy and Operational programmes DG REGIO – Unit B.3.
Chapter 1 The Study of Body Function Image PowerPoint
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
UNITED NATIONS Shipment Details Report – January 2006.
Władza Wdrażająca Programy Europejskie ul. Wspólna 2/4, Warszawa tel faks OPERATIONAL.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
Cross Country Comparison of Reforms The View of Top Executives in 11 European Countries Preliminary Results from the COCOPS Executive Survey Gerhard Hammerschmid.
European Commission - Directorate General for Agriculture EU rural development policy
GROWING REGIONS, GROWING EUROPE Fourth Report on Economic and Social Cohesion By Prof. Danuta Hübner Brussels, 30 May 2007.
Agency for Restructuring and Modernisation of Agriculture ARMA Polish Paying Agency Experiences & Accomplishments Brussels, 3-4 October 2007.
Development Priorities in Regional Operational Programmes prepared by the Polish Regions for the Programming Periode – 11 October 2007,
Rural Development Policy
DG REGIO – Unit "Thematic Development" EUROPEAN COMMISSION EN 1 Transport and Regional Policy Transport and Regional Policy Patrick.
What new period of 2007–2013 Convergence program brings to Lithuanias regions Rolandas Kriščiūnas Ministry of Finance of the Republic of Lithuania.
2 Slovenia Signed Contract of Confidence for the period Compliance assessment for one programme for the new period Experience of a Certifying.
The Implementation Structure DG AGRI, October 2005
1 7 th Progress Report: The regional and urban dimension of Europe 2020 Lewis Dijkstra Deputy Head of the Analysis Unit DG for Regional Policy European.
The Managing Authority –Keystone of the Control System
1 The role of macro- regional strategies after 2013 The Commissions view (or rather the view of one official) David Sweet, DG Regional Policy, European.
Regional Policy Changes in Common Indicators Definitions and Discussion Brussels, 14 th March
POLAND Development Management System in Poland Brussels, 2 July 2010.
“Train the trainers” seminar
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
Experiences of Energy Management in Emilia-Romagna Morena Diazzi Emilia-Romagna Regional Government General Director for Industry, Trade and Tourism Regions.
1. 2 Why are Result & Impact Indicators Needed? To better understand the positive/negative results of EC aid. The main questions are: 1.What change is.
Community Strategic Guidelines DG AGRI, July 2005 Rural Development.
HUNGARIAN EU PRESIDENCY EXPECTATIONS TOWARDS THE ESPON 2013 PROGRAMME ESPON INFO DAY HUNGARIAN PRESIDENCY IN 2011 Tamás DÖMÖTÖR, PhD – Ministry of the.
1 Welcome to this Seminar for Board Members. 2 Board Members and Staff – Sharing of Responsibilities Voluntary Organisations and Volunteers Responsibilities.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
An in-the-ballpark estimate based on hypothetical situations and their potential effects on earnings and tax revenue for the State of Nebraska. Presented.
Year 6 mental test 5 second questions
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
1 John Page Chief Economist, Africa Region World Bank INVESTING IN AFRICAS GROWTH What Role for The Diaspora? Cape Town, February 2008.
Company Name PRESENTATION NAME Compilation and Dissemination of Energy Statistics International Workshop on Energy Statistics, Beijing, Sep 2012 International.
EMS Checklist (ISO model)
Effectively applying ISO9001:2000 clauses 6 and 7.
ABC Technology Project
1 The Experience of Private Hospitals In the Republic of Yemen Success and Problems Dr. Ali K. Abbas Yemen International Health & Education Consultants.
ACCESSIBLE TOURISM IMIC 2 February 2006 Dr. Aris Ikkos, ISHC.
The CAP reform process in perspective: issues of the post-2013 debate Carina Folkeson Directorate for Economic Analysis, Perspectives and Evaluations DG.
VOORBLAD.
CHAPTER 1: UNDERSTANDING THE FINANCIAL PLANNING PROCESS.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
27th Conference of EU Paying Agency Directors Oviedo, Spain April 2010 RELATIONSHIP BETWEEN THE MANAGING AUTHORITY AND THE PAYING AGENCY IN THE IMPLEMENTATION.
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Rural Development policy
1 MINISTRY OF AGRICULTURE AND FOOD Rural Development Policy
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
Wageningen International Introduction agri environment measures Pleven Agri environment in the Netherlands Background Natura 2000 and agricultere Common.
Sivu The Finnish LEADER model and reflections on the future Budapest, 12th Dec 2012 Petri Rinne
The Dutch Approach to Local Climate Policy Robert Salomons René Schellekens.
Jela Tvrdonova, The EU priorities:  Use the Leader approach for introducing innovation in the thematic axis  better governance at the local level.
Polish National Rural Network Bureau of Technical Assistance Responsible for: -Technical Assistance in Programs of Rural Development for period.
Implementation of Leader program in Estonia Kristiina Tammets.
Rural Development experiences of Hungary
Presentation transcript:

0 The Netherlands: Implementation of axis 3 in practice Erik Mulleneers, Policy Coordinator Rural Development Programme, Ministry of Agriculture, Nature and Food Quality, The Netherlands

1 Contents 1.Basic information, facts and figures 2.Goals and content of axis 3 in the Dutch RDP 3.Implementation of axis 3

2 Basic facts and figures (1): The Netherlands: 12 provinces

3

4 Basic facts and figures (1): The Netherlands: 12 provinces Population; total 16.3 mln; average population density of 480/km2, varying per province from 183 – 1229 persons/km2; highest concentrations in the West and South. Average income is one of the highest in the EU; higher in western and central provinces; lower in northern and southern provinces.

5 Population rural areas (incl. towns up to inhabitants): about 6 mln. Peri-urban character of most rural areas in NL: need of the multifunctional use of rural areas. Economic importance of agriculture diminishes; other economic functions (e.g. tourism, recreation) become more important Basics (2): Developments in rural areas in NL

6

7 Population rural areas (incl. towns up to inhabitants): about 6 mln. Peri-urban character of most rural areas in NL: need of the multifunctional use of rural areas. Economic importance of agriculture diminishes; other economic functions (e.g. tourism, recreation) become more important Basics (2): Developments in rural areas in NL

8 The image was removed to reduce the size of the file

9

10 The image was removed to reduce the size of the file

11 The image was removed to reduce the size of the file

12 The image was removed to reduce the size of the file

13

14 Basics (3): Main concerns in rural areas 1.Urban pressure: Beauty and variety of (agricultural) landscapes Environment (soil, water, air) and biodiversity Opportunities for recreation 2.Socio-economic development: Competitiveness agricultural sector Regional/local socio-economic problems: employment, housing, basic facilities Challenge: simultaneously -stimulate economic activity (incl. agriculture), -preserve quality of the environment and landscapes, -and enhance the quality of life in rural areas.

15 Public policy making concerning rural areas is decentralised: the 12 provinces as the directors of policy in rural areas. Provincial policies for rural areas in multi-annual provincial programmes , partly based on commitments (towards central government) Financing of provincial policies in the programmes: - autonomous provincial funds; - transferred, earmarked funds from central government; - financing in the RDP (= only a very limited source of funding!). Basics (4): Public policy in rural areas in NL

16 1 Rural Development Programme (POP2); 24 measures in four axes. POP2: co-production of central government and the provinces Managing Authority (MA): Minister of Agriculture, Nature and Food Quality Paying Agency (PA): Government Service for Land and Water Management (DLG) An important role of the provinces in the RDP: Leading in drawing up the RDP for axes 3, 4 and partly 1; implementing almost 90% of the RDP-budget (axes 2, 3, 4 and partly 1). Basics (5): the NL Rural Development Programme

17 Basics (6): Breakdown total RDP-budget , incl. estimates for private investments. Total: 2.2 bln (EAFRD-contribution = mln)

18 Objectives and content axis 3 (1): Objectives Diversifying the rural economy: stimulating new economic activities Support the multifunctional use of rural areas, and by doing so: increase welfare and quality of life of rural and urban population! Strengthen and use the intrinsic value of rural areas: natural and cultural values, openness of the landscape, stillness.

19 Objectives and content axis 3 (2): context and approach Implementing axis 3 in the context of the provincial seven year programmes: Area focussed: problems of specific areas are starting point; Long term approach; Integral approach: problems and solutions in their context; In cooperation with partners: * other governments (water boards, municipalities) * Non-governmental organisations * Local action groups

20 -Most measures of axis 3 regulation 1698/2005 provides, have been chosen in the RDP. -Because of: the regional differences in NL, which ask for different measures in different parts of the country; the differences in provincial objectives and policies chosen. -Every province implements those measures which help best solve the problems in that province and attain the provincial goals. Objectives and content axis 3 (3): measures

21 Objectives and content axis 3 (4): money: breakdown budget axis 3

22 -RDP contains provisions about demarcation axis 3 and SF. Basic rule: project financing from two funds is forbidden. -Actions in RDP and Operational Programme SF differ in general quite fundamentally. In general RDP-projects in axis 3: rather small scale projects; large scale projects in SF. -For those situations where overlap is possible: detailed provisions per measure in the RDP to prevent double financing Objectives and content axis 3 (5): Demarcation with Structural Funds

23 Implementation of axis 3 (1): EU-conformity Implementation through provincial regulations based on the provincial multi-annual programmes. Provincial regulations approved by Management Authority. Provincial decisions on individual subsidies examined beforehand by Paying Agency. If not EU-conform: positive decision not possible!

24 Implementation of axis 3 (2) : Division of roles ActionActor Project initiation Applicant Project appraisal Province Check EU conformityPA Decision Province* Project executionApplicant Progress monitoringProvince Payments PA Monitoring/evaluation resultsMA/Monitoring Committee (MC) Control PA Technical Service * Approved projects are registered in the administrative system of the PA

25 Implementation of axis 3 (3) : National coordination -General Coordination: regular meetings with all parties involved in RDP (MA, central government, provinces, PA, Coordinating Body) -Working group on interpretations (representatives MA, provinces, PA) -Detailed agreements on funding (EAFRD, co-financing and top ups) per province, per measure annually monitoring and adjustments. -Judgments of MA and MC -Help Desk of the Regiebureau POP

26 Implementation of axis 3 (4) : perspective of the user/applicant:a short manual 1.Read: multi-annual programme and regulation of your province. Contact your province for more information if you are not sure. 2.Fill in application form and send it to your province. 3.Wait for decision while Province and PA check whether the application for the project plan fulfils the criteria, is EU- conform (and check if there is enough money).

27 4.If positive decision: execute the project plan in line with the decision! 5.Send in evidence of project results and correct project realisation. 6.Wait for the outcome of check by province and Paying Agency 7.If correct: you get your money from the PA! If not: give additional information. 8.Be prepared for administrative and on-the-spot checks; keep relevant information about your project and maintain the investment.

28 The image was removed to reduce the size of the file

29 The image was removed to reduce the size of the file

30 Thank you for your attention!