RF power & FPC status 20150216 Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !

Slides:



Advertisements
Similar presentations
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Advertisements

All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
MB-IOT test bench at CERN
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
FCC week March 2015 Marriott Georgetown Hotel Superconducting RF: Novel Cavity Concepts & Cryomodules Fundamental Power Coupler (FPC) Eric Montesinos,
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Electrical & Control Power Supplies Trevor Hartnett.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Anders Sunesson RF Group ESS Accelerator Division
1.3GHz Input Coupler for ILC
Almost 40 years of operation with tetrodes in the CERN-SPS CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of RF-SPS team CWRF workshop,
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
LIU-SPS RF Power upgrade | 09 December 2015.
LHC Crab Cavity Engineering Meeting, FNAL RF Power Amplifiers (PA) & Fundamental Power Couplers (FPC) December 2012 Eric Montesinos,, CERN, BE-RF-PM.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
LCWS11 WG4 Fully featured accelerating structure engineering design
Areal RF Station A. Vardanyan
Tongming Huang (IHEP) On behalf of the power coupler working group
CERN – Zanon discussions
High Energy Proton Synchrotrons
Construction and Commissioning of Electronic Test Benches
Construction and Commissioning of Electronic Test Benches
FPC & HPRF status Couplers mounting (FPC, HOMS & FA)
on behalf of the RF group
SPS cryogenic proximity equipment and SM18 validation
SPS TWC 200 MHz Super Proton Synchrotron Travelling Wave Cavities 200 MHz 4 x 1.0 MW cw 25 years of experience.
WP4 RF equipment volume needs
Superconducting RF Crab Cavities
SNS Fundamental Power Coupler History
ACS news Circulator TCU: control tests in progress All cavity racks
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
DQW HOM Update and Recent Developments
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
V. Veshcherevich Cornell University
Presentation transcript:

RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !

RF Power system & FPC RF power systems including : SSPA Driver surface building Flexwell cable Tetrode Final (from 1996) WR2300 Waveguide Circulator & Load Fundamental Power Coupler (FPC) Two complete systems operating: 400 MHz 45 kW CW 1 MHz maximum BW 16 February 2015 Crab Cavity RF power & FPC status 2 LLRF Driver Final Cryo module FPC Flexwell cableWaveguides Load

RF Amplifiers Drivers New SSPA driver to be built 10 European companies already contacted First prototype by June 2015 Finals One old SPS amplifier ( ) has been successfully tested at 400 MHz up to 45 kW CW Five amplifiers to be modified from 352 MHz to 400 MHz Characteristics have been checked by Philippe in January, but driver (tube) was not ok Tests to be repeated in June 16 February 2015 Crab Cavity RF power & FPC status 3

Power supplies All present HVPS are out of date Will be one HVPS per two amplifiers to reduce the cost First new system by June 2015 Two additional new systems for SM18 & SPS 16 February 2015 Crab Cavity RF power & FPC status 4

WG & Coaxial Waveguides Regarding frequency only WR2300 & WR2100 WR2300 LHC standard Coaxial lines from SSPA Driver to Final Pfwd = 2.5 kW 1-5/8 EIA line Coaxial lines from Final to Circulator Pfwd = 50 kW 6-1/8 EIA line 16 February 2015 Crab Cavity RF power & FPC status 5 WR Fmin MHz Fmax MHz a inch b inch Flange mm

Circulators & Loads We decided to buy LHC circulators and Loads 330 kW power capability Re-usable with LHC main RF system Loads have already been delivered (to be modified from 4 sections to 2 sections) Circulators will be delivered by March February 2015 Crab Cavity RF power & FPC status 6

FPC 1.0 (x ) 400 MHz 50 kW CW FPC full reflection all phases Agreed coaxial line OD 62 mm - ID 27 mm Coaxial disk window Outer titanium flange Al2O3 97.6% ceramic Inner copper tube Coupler body Massive copper 316 LN Stainless Steel flanges on both sides 16 February 2015 Crab Cavity RF power & FPC status 7

FPC 1.0 (x ) Monitoring ports 1 port for vacuum gauge 1 port for e- monitoring 1 port for arc detector Coaxial to WG WR2300½H transition without doorknob DC capacitor included for DC polarization 16 February 2015 Crab Cavity RF power & FPC status 8

FPC 2.0 (x ) Still agreed sizes on cavity side OD 62 mm - ID 27 mm Conical vacuum line to increase the diameter of the ceramic in order to avoid arcing on the air side Ceramic & Air coaxial line increased OD 100 mm – ID 43.5 mm Robust ceramic Thickness 20 mm 16 February 2015 Crab Cavity RF power & FPC status 9

FPC 2.0 Pseudo-conical air extension cooled with forced air Even if against CERN’s rules regarding joining, as no other way to do it, water cooled antenna Mandatory vacuum gauge for coupler protection No more arc detector window neither e- antenna to ease integration 16 February 2015 Crab Cavity RF power & FPC status 10

FPC 2.0 (x ) 16 February 2015 Crab Cavity RF power & FPC status 11

Antenna overheating Looking at the size of the hook, no way to design a cooling circuit which also cools down the curved part of the hook Initial design of coupling elements (BNL-ODU) shown overheating up to an unacceptable temperature New coupling element shapes have been designed allowing acceptable temperature for the three couplers 16 February 2015 Crab Cavity RF power & FPC status 12

Two versions only Pseudo-conical air extension cooled with forced air Water cooled antenna Mandatory vacuum gauge for coupler protection 16 February 2015 Crab Cavity RF power & FPC status 13 FPC 3.0 (x 2 - Fall 2014) Slightly different hook & RFD longer than DQW

FPC 3.0 (x 2 - Fall 2014) June 2015December February 2015 Crab Cavity RF power & FPC status 14

Test boxes Two test boxes will be built allowing the preparation of pair of couplers They have to be customized regarding the coupling element for each cavity design Coupling element has been defined very late (November 2014) Need 12 months to build these test boxes, ready by beginning February 2015 Crab Cavity RF power & FPC status 15

FPC 3.0 FPC 3.0 as delivered to clean room Q February 2015 Crab Cavity RF power & FPC status 16

Schedule February 2015  FPC design was missing coupling element definition until November 2014 (Test cavity impossible to be designed)  Couplers processed 40 kW SW CW all phases Q  Cavities to be installed in the SPS in December 2016 ??? 16 February 2015 Crab Cavity RF power & FPC status 17 RF processing → → →SPS → → ??? Hook definition → → → → → → FPC Construction SM18 tests

Space request Surface building 10 racks equivalent Ua (8 racks equivalent RF amplifiers) 2 racks Grids 2 racks SSPA Drivers 2 racks Controls & Monitoring Machine (Space on moveable platform) (2 amplifiers + 2 circulators + 2 loads) Water pump Blowers HV filtering box 16 February 2015 Crab Cavity RF power & FPC status 18 4 x 5 m HVPS 2.8 x 5.6 m SSA DriverControlsGrids 3 x 5 m RF Finals

Movable table 16 February 2015 Crab Cavity RF power & FPC status 19 Phoevos Kardasopoulos

Two Tetrodes Amplifiers onto the table 16 February 2015 Crab Cavity RF power & FPC status 20 Phoevos Kardasopoulos

Circulators & power Loads (with adjustable supporting system for integration of all three designs) 16 February 2015 Crab Cavity RF power & FPC status 21 Phoevos Kardasopoulos

Waveguides to FPC 16 February 2015 Crab Cavity RF power & FPC status 22 Phoevos Kardasopoulos

Cryomodule with FPC 16 February 2015 Crab Cavity RF power & FPC status 23 Phoevos Kardasopoulos

Flexible WG (allowing integration of all three designs) 16 February 2015 Crab Cavity RF power & FPC status 24 Phoevos Kardasopoulos

Flexible WG (allowing integration of all three designs) 16 February 2015 Crab Cavity RF power & FPC status 25 Phoevos Kardasopoulos

Services Electrical network Power: 250 kVA UPS: 10 kVA Cooling & Ventilation Water: 100 kW Air: 20 kW HVPS + SSPA Drivers accessible with beam Finals accessible with RF on short at the output of the circulator Control room for Controls and Monitoring & LLRF 16 February 2015 Crab Cavity RF power & FPC status 26

Thank you 16 February 2015 Crab Cavity RF power & FPC status 27