A Protocol for the establishment and operations of LTPP sections Prepared for Gautrans by CSIR, Transportek.

Slides:



Advertisements
Similar presentations
HMA permanent deformation study: Progress report to the RPF 7 May 2008 Erik Denneman.
Advertisements

Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O BJECTIVES AND D ESCRIPTION OF THE CDM O PERATIONS P LAN.
GCSE PROJECT GUIDELINES Use this presentation to make sure you have the correct content for you project - click on.
SOUTH AFRICAN NATIONAL ROADS AGENCY LTD Pavement Research
Flooding & Drainage Committee March 30, 2010 Pavement Condition Assessments Mobile Data Collection Unit.
Detection and Measurement of Pavement Cracking Bagas Prama Ananta.
MEPDG Overview & National Perspective CRSI Expert Task Group Meeting July 29, 2008 Gary Crawford Federal Highway Administration Office of Pavement Technology.
Set Aside Treatability Guidelines Brent Means U.S. Office of Surface Mining.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
Bituminous Stabilized Materials Guideline: Inception Study Project Funded By: Gautrans Sabita.
Bituminous Stabilized Materials Guideline RPF Feedback : K Jenkins May 2006.
Bituminous Stabilized Materials Guideline Project Initiated By: Gautrans Sabita.
Asphalt Quality Assurance Program
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Bases Fenella Long Road Pavements Forum November 2001.
1 Module PLANNING AND ORGANIZING EXTERNAL QUALITY ASSESSMENT.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Roll-out and Implementation of Rapid Testing from a Field Perspective Perspectives from San Francisco Shelley Facente, MPH Rapid HIV Testing Program Coordinator.
HR Initiatives in the NHS
ISO/IEC A review of the new standard for laboratory accreditation
Police Sector Council Leadership Workshop February 1-3, 2011 Executive Selection Shelagh Morris Director – Corporate Services Guelph Police Service 1.
Technical Recommendations for Highways No 12 TRH 12
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
The TRICS Multi-Modal Survey Methodology KEVIN TRAVERS, HAMPSHIRE COUNTY COUNCIL.
1 Module OVERVIEW OF EXTERNAL QUALITY ASSESSMENT.
Evaluating a Research Report
WELNS 670: Wellness Research Design Chapter 5: Planning Your Research Design.
In Situ Stabilization of Pavement Base Courses Roads Pavement Forum Thursday, May 17, 2001.
CSIR-UCB research programme Road Pavements Forum 14 November 2001.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
G AUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS 1 GAUTRANS APT ELZBIETA SADZIK MAY 2002.
TEMPUS INFORMATION DAYS Tajikistan, 18 November 2011 Alba-Chiara Tiberi, Project Officer EACEA TEMPUS IV- FIFTH CALL FOR.
Status of the first experiment at the PaveLab Fabricio Leiva-Villacorta, PhD Jose Aguiar-Moya, PhD Luis Loria-Salazar, PhD August 31 st, 2015.
A Guidance, Parameters & Recommendations for Rubblized Pavements July 2006.
GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS APT STEERING COMMITTEE ROAD PAVEMENT FORUM 26 November 2003 Elzbieta Sadzik.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Quality control & Statistics. Definition: it is the science of gathering, analyzing, interpreting and representing data. Example: introduction a new test.
CSIR RPRAC WORKING GROUP: THIN-LAYER CONCRETE RPF, 23 November 2005.
Risk Management and the Audit Plan abc CIPFA in the Midlands Audit Training Seminar Wednesday 24th November 2004 Tina Spiers.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Program and Quality.
Most Common Deficiencies Cheryl O. Morton Managing Director, AIHA Laboratory Accreditation Programs, LLC.
CEAA 2012 EA PROCESS OPTIONS OCTOBER 15, 2012
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
By Dr Hidayathulla Shaikh. Objectives  At the end of the lecture student should be able to –  Define survey  Mention uses of survey  Discuss types.
Quality is the totality of features and characteristics of product or services that bear on its ability to satisfy the stated needs.  In simple words.
Road Investment Decision Framework
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
Director Policy & Standards International Railway Safety Conference
Construction and Performance Evaluation of Roller Compacted Concrete under Accelerated Pavement Testing TRB Paper No: Moinul Mahdi Zhong Wu, PhD.,
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Christopher R. Bennett EASTR
Inspector's Role and Responsibilities
Phase I Experiment 4 Different pavement structures, 8 sections Compare
Inspector's Role and Responsibilities
Update on the current APT Project in Texas
School Workforce Census 2017
Inspector's Role and Responsibilities
Educator Effectiveness Regional Workshop: Round 2
Project Process Leading for Impact®: Building Future Leaders
AASHTOWare Pavement-ME Design Software: Materials Library
To critically review aspects of your provision to an agreed criteria
Prime Factors for Successful Preservation Treatments
Alexander Hinz & Kasy Stinson Water Supply Division
Indicators&Criteria in External Quality Assessment
Presentation transcript:

A Protocol for the establishment and operations of LTPP sections Prepared for Gautrans by CSIR, Transportek

Background LTPP programmes developed to support the analysis of pavement performance leading to improved engineering tools for design, construction and management Current LTPP programmes focus on performance models for PMSs Needs to be a link to APT for greater confidence in interpreting APT results

Background cont.. In SA financial constraints have prevented LTPP test sections being linked to pavement performance under APT LTPP sections have been developed on an ad hoc basis or as part of calibration sections Renewed interest worldwide in linking APT to LTPP

Background cont.. For reliable models and design specs, it is imperative that data collected during LTPP programmes are reliabe and consistent with data collected during APT Protocol already exists for establishment and operations of HVS test sections Protocol required for LTPP to provide a consistent approach

Structure of Protocol Linking LTPP to HVS data collection Management and responsibilities Site location and establishment Data collection Reporting criteria

Minimum measurement requirements PropertyLTPPHVSDifference VisualsMod TMH 9/HDM calib guide Description of cracks TMH-9 standard with added info on cracks Trans profileStraight edge & wedge/electronic straight edge Laser profilometerFull lane too wide for laser prof Long profileCalibrated profiometer Straight edgeLTPP section too long for straight edge DeflectionRSD, FWDRSDFWD used routinely in Gautrans Perm defMDD Density Dual probe strata gauge M/CGrav m/c used for calibration Pvmnt TempTemp buttons TrafficW-i-MHVS Weather detailsWeather station

LTTP Staff Organisation Chart Project Director Project Manager Database manager Technician’s Assistant (s) Field Technician Road Authority/Agency In-house or service provider

Proposed layout of LTPP sections A12345B678910C 5 x 15m10 m 5 x 15m Not to scale 200 m – full lane width HDM calibration sections 500 m long covering entire road width Detail provided on instrumentation, markings and measurement points

Data collection Monitoring every 6 months in May and October or when failure occurs Sampling only from panels A, B and C or if failure occurs in other panels Recommendations on reinstatement of test pits given to ensure impermeability Monitoring standards given for:  Visual assessment  Transverse profile  Longitudinal profile  Density and M/C  DCP  Environment  Deflection  Permanent Deformation  Traffic

Laboratory testing Essential that material properties at the time of construction (or initiation of section) are fully recorded for comparison over time As built records may not give sufficient detail Testing programme initiated at the following intervals:  Pre-construction/rehabilitation  Post construction/rehabilitation  In service (approx half-way through the design life of section)  Rehabilitation/end of service Details of all recommended tests given in the document

Reporting of results All field monitoring and test data checked by field technician and then PM before sending to the Database Manager Any lab results sent with field data 1 st level analysis carried out after each monitoring 2 nd level analysis every 2 years to include:  An evaluation of the structural behaviour  The identification of any extraneous effects  The development and refinement of performance prediction models  On HVS/LTPP sections, the relationship between LTPP and HVS performance for similar traffic levels