CCA Workshop on SR SEVESO II The Major Accidents Hazards Bureau (MAHB) of the EC Joint Research Centre (JRC) Safety Reports: Approaches and Challenges.

Slides:



Advertisements
Similar presentations
The Microsoft IT Academy Quality Process. v3.0 June 2004 The key components of the Quality Programme A Quality relationship Self assessment Site visits.
Advertisements

JOINT DEGREES The Experience of the ENIC and NARIC Networks Dr. E. Stephen Hunt Manager, USNEI and President, ENIC Network ECA Team II Conference Joint.
Module N° 7 – SSP training programme
WTO, Trade and Environment Division
Bergen Communiqué – results and implications for quality assurance Christian Thune President, ENQA Presentation at ENQA workshop: "AFTER THE BERGEN MINISTERIAL.
Executive Director of the Danish Evaluation Institute (EVA)
THE EUROPEAN GENERAL PRODUCT SAFETY NETWORK Erik Hansson DG Health and Consumer Protection European Commission.
Module N° 7 – Introduction to SMS
[Organisation’s Title] Environmental Management System
Providing Inspection Services for Department of Education Department for Employment and Learning Department of Culture, Arts and Leisure Good Practice.
WorkSafe Victoria is a division of the Victorian WorkCover Authority Guidance Note on the Prevention of Bullying and Violence at Work Evaluation results.
Environmental Management System (EMS)
Enforcement of the Seveso II Directive Enforcement of the Seveso II Directive.
Making Aarhus work in international forums A workshop on promoting the application of the principles of the Aarhus Convention in international forums Geneva,
How ISO 9001 Fits Into The Software World? Management of Software Projects and Personnel CIS 6516 March 6, 2006 Prepared by Olgu Yilmaz Swapna Mekala.
Standards and Guidelines for Quality Assurance in the European
Preventive Controls Phase 2 Workgroup 1.
Codex Guidelines for the Application of HACCP
Seveso II in the UK Mark Maleham tel + 44 (0)
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
ACWM Winter Workshop 26 th January 2013 Get your creative practice into schools – effective selling/ relationship building.
Fourth ECA Education Conference on MISSING THE LINK – RETHINKING THE ROLE OF TECHNICAL VOCATIONAL EDUCATION IN UPPER SECONDARY EDUCATION Tirana, Albania.
Ofsted lessons Clerks’ Update Jan Ofsted Sept 2012 The key judgements: Inspectors must judge the quality of education provided in the school – its.
EuropeAid/131555/C/SER/RS Major Accident Prevention Policy Safety Management System Ernst SIMON, Styrian Regional Government, Austria Belgrade, December.
Corporate Governance: Basel II and Beyond Corporate Governance Program for Bank Directors of Indian Banks Mumbai December 14, 2005.
SEVESO II The Major Accidents Hazards Bureau of the
Opening seminar for the project “Implementation of the Seveso II Directive (96/82/EC)” Bratislava, Slovakia, April 2003 The “Seveso II” Directive.
Overview report of a series of FVO fact- finding missions and audits carried out in 2012 and 2013 in order to evaluate the systems put in place to give.
Planning for Continuing Professional Development – A Whole School Approach A step by step guide to planning CPD including a framework for Teacher Induction.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
IBT - Electronic Commerce Privacy Concerns Victor H. Bouganim WCL, American University.
Sub-regional Workshop on the Implementation of the Convention on the Transboundary Effects of Industrial Accidents Erevan, Armenia, March 2003 The.
EU Seveso II Directive Operators obligations & Competent Authorities duties 2.3 Activity workshop Angeliki Tsatsou Dritsa Chemist, TA Key Expert 2 Zagreb.
Bratislava april Preparation of an inspection plan: The Dutch approach Theo de Gelder Senior Inspector Regional Inspectorate South-West Dutch Ministry.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
Seveso II Review Stakeholder Consultation Meeting EPSC Position Richard Gowland Technical Director Manchester March
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Occupational Safety and Health Reps, their role and functions in the EU.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Ensuring the Safety of Future Developments
Purpose and objectives of the Workshop School for drafting regulations Nuclear Safety Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Capacity-building from the perspective of the ECE Industrial Accidents Convention Virginia Fusé, UNECE secretariatIspra26/03/2015.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
ITC-ILO/ACTRAV Course A Trade Union Training on Occupational Safety, Health & HIV/AIDS (26/11 – 07/12/2012, Turin) Introduction to National Occupational.
Abfallbewertung Bundesabfallwirtschaftsplan Andreas Moser t Tel: Establishment of inspection plans: The role of.
Serving society Stimulating innovation Supporting legislation Overview of Benchmarking Exercises 1 and 2 Zsuzsanna Gyenes, PhD European.
INSPECTION PROGRAMS Robert Mout DCMR – Environment Agency
Improving the Education of Teachers and Trainers
European case studies relating to the administrative approach
Union Action and Methodology of Prevention
Obstacles and lessons learnt by the SRVSOP
Module 2 Key Principles of the Peer Review Programme
Nick Bonvoisin Secretary to the Convention on the
Joint Research Centre The European Commission’s in-house science service.
Pressure Equipment Workshop September 2007 – Day 2
Seveso Implementation Road Map
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Culture Statistics: policy needs
Improving information exchange:
Market surveillance cooperation at European level
Presentation transcript:

CCA Workshop on SR SEVESO II The Major Accidents Hazards Bureau (MAHB) of the EC Joint Research Centre (JRC) Safety Reports: Approaches and Challenges Observations from the MJV Programme Maureen Wood

CCA Workshop on SR Inspections (Art. 18) Mutual Joint Visits Programme Designed to exchange best practices amongst Member State Inspectors, thereby ensuring a consistent implementation of the Seveso II Directive First round almost complete

CCA Workshop on SR Inspections (Art. 18) Mutual Joint Visit (MJV) Programme on Seveso II Inspections –Launched in 1999 with a visit to the Netherlands –Technical exchange for Seveso II inspectors –12 countries have hosted a meeting ( ) –Over 175 different inspectors from Member States, Candidate Countries and EEA/EFTA –Over 70 competent authorities (national, regional, local) –Industry - the European Process Safety Centre (EPSC)

CCA Workshop on SR MJV Links to Safety Reports In numerous MJVs, a frequent subject of discussion has been the production, use and review of safety reports.

CCA Workshop on SR MJV Links to Safety Reports The Seveso Directive makes a direct link between inspections and the safety report...Such inspections or other control measures shall be sufficient for a planned and systematic examination of the systems being employed at the establishment, whether of a technical, organizational or managerial nature, so as to ensure in particular:...that the data and information contained in the safety report, or any other report submitted, adequately reflects the conditions in the establishment, occurrence, prevention and mitigation of major accidents. Seveso II Directive, Article 18 on Inspections

CCA Workshop on SR Additional MJV Links to Safety Reports In addition to the explicit link between safety reports and inspections in the Seveso II Directive, safety reports are also discussed in MJVs because, among other reasons: –Many MJVs have featured extensive overviews of their Seveso implementation practices, including safety report review and guidance. –In some countries the inspectors also play a strong role in the review of safety reports.

CCA Workshop on SR MJV - Special Topics

CCA Workshop on SR Recurring Themes Criteria for judging adequacy of safety report How much documentation is required Limits of responsibility of the competent authorities Management of resources for reviewing/inspecting against safety reports Is the review/inspection process effective or is there a better way?

CCA Workshop on SR Safety reports and inspections Differences noted between Member States in: Influence of inspectors over safety report content (proactive vs. hands-off) Role of inspectors in safety report review (lead role vs. collaborative vs. no role) Emphasis placed on safety reports vs. inspections

CCA Workshop on SR General Implementation Issues Differences in Member States noted in: Documentation requirements (What is essential? how much is too much?) Who reviews safety reports (third parties; number of involved competent authorities;) Length of review process (turn-around time, number of steps in the review process, etc.) Final status of safety reports (dynamic vs. static, i.e., can be revised frequently vs. once every 5 years or for major changes)

CCA Workshop on SR General Implementation Issues Common challenges noted: How to define an adequate safety report What is the appropriate level of detail? Uniformity of requirements imposed on each establishment (how does the system encourage or discourage consistency?) Dealing with installations that have not submitted safety reports Co-ordinating safety report evaluations between competent authorities

CCA Workshop on SR Final Reflections The development of safety reports is still in the process of maturation. At the moment many Member States are still refining and testing their procedures and thus may be particularly receptive to feedback from other programmes. Differences in approaches to Seveso requirements, such as safety reports and inspections, are often representative of differences in safety culture and priorities in Member States but not effectiveness. Nonetheless, comparisons can offer insights necessary for identifying what makes a programme effective. Over time it should be possible to push exchanges (in MJVs and other forums) more towards focusing on key success factors and solutions to common problems.