Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.

Slides:



Advertisements
Similar presentations
SILVER COMET FIELD AT PAULDING NORTHWEST ATLANTA AIRPORT FIVE YEAR CAPITAL IMPROVEMENT PROGRAM.
Advertisements

Grade Separation (GS-16) Project. Project Location - Bensenville N.
Update On CTH. AP (Midway Rd.) & LP Calumet County Highway Department July 15, 2008.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Permeable Pavements Shingle Creek Watershed Management Commission May 31, 2011.
Presentation to SEC-AAAE Annual Conference Chicago Department of Aviation April 19, 2010.
6 th Street Water Main And Street Reconstruction 2013.
Consulting + Engineering + Technology + Construction Page 1 5/1/2015 Sharp Grossmont Hospital Pre-Bid Phasing of Early Utilities Sharp Grossmont Hospital.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
ISE Capstone Project by Michael Ferry University of Minnesota 2008.
SMS and Safety Risk Management in Airport Planning and Development Presented by Rusty Chapman, P.E. Delta Airport Consultants, Inc. March 3, 2011.
AIRPORT A complex of runways and buildings for the
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Talofa!! from American Samoa. American Samoa.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
2009 PACIFIC AVIATION DIRECTORS’ WORKSHOP May 4 – 6, 2009
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Runway 16L-34R Overlay RFQ Presentation. AGENDA Review of the RFQ Process Overview of the 16L/34R Overlay Overview of Section 4 - Scope of Work Review.
1 SYR NAS SURVEY 01/23/ Proposed SAR RU Locations X1ICDLS RU1ICDLS RU2EXEC AIR HANGAR RU3TERMINAL RU4GREENFIELD RU5SUMMIT ENVIRONMENTAL ASR9AIRPORT.
Site Plan Review 8 May 2013 Jeff Shaw, AIA Principal-in-charge Newton Fire Station #10.
2010 FAA Worldwide Airport Technology Conference Chicago Department of Aviation April 20, 2010.
Successfully Diverse Partnerships = Economic Impact ACEC Indiana 10 th Annual Diversity Network Fair Shannetta Griffin, P.E.
Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
White Pigeon Community Schools
ELCITA UPDATE JULY 2017.
Pervious Parking lot Matthew Cockerham.
I-15 North Phase 4 Scoping & Project Management Assistance
General Road Construction Information
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
I-15 North Phase 4 Scoping & Project Management Assistance
Interstate 15 North Phase 4 8/19/2015 Update
Earthwork operations- are those that involve the earth in its natural form, which need to be undertaken before the actual construction of the pavement.
DICKINSON AVENUE RECONSTRUCTION
Wilkes-Barre/Scranton International Airport Taxiway B Extension to the Runway 22 End By: Steve Mykulyn, PE and Rick Holes, PE September 28, 2017.
Condominiums Community
Condominiums Association
MONTHLY STATUS REPORT– May 2013
Pinole-Hercules Water Pollution Control Plant Upgrade Project
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Construction Management & Inspection
Minuteman Vocational Technical Regional High School Progress
SE 12th Street Roadway Improvements February 8, 2005.
Lafayette New Terminal Program Update
Silver Line Department of Transportation
City of Spruce Grove Capital Region Partners Presentation 2019
Lafayette New Terminal Program Update
Access Hatch Replacement Phase 4
Lafayette New Terminal Program Update
Project/program update
Presentation transcript:

Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration FUTURE Airfield Configuration

Disclaimer – Any and all information contained herein is subject to change without notice 2 14L THRESHOLD DISPLACEMENT NORTH AIRPORT TRAFFIC CONTROL TOWER (NATCT) NORTH BASIN PUMP STATION DES PLAINES LAND ACQUISITION AREAS ELK GROVE LAND ACQUISITION AREAS Contract Awarded Under Construction Contract Completed AMERICAN AIRLINES PARKING LOT RELOCATION 90" JAWA WATER MAIN LINE STOP (“HOT TAP”) LLWAS EXPANSION / RELOCATION 4 North Airfield Locations NEW PERIMETER ROAD & FENCING MT. PROSPECT RD. / GUARD POST 1 RELOCATION R/W 9L-27R SITE PREPARATION 90" JAWA WATER MAIN RELOCATION R/W 9L-27R PAVEMENT & ELECTRICAL R/W 9L-27R NAVAIDS AIRFIELD VAULTS & ASSOCIATED DUCT BANKS (combined w/South) NORTH AIRFIELD ASR-9 (a) RTR – P (b) RTR – Q (c) (b) (a) (c) North Airfield Project Layout (by Contract) NORTH AIRFIELD ARFF SERVICE ROAD

Disclaimer – Any and all information contained herein is subject to change without notice 3 South Airfield Project Layout (by Contract) RAILROAD RELOCATION (4 Packages) RAILROAD METRA SOUTH (a) RAILROAD INTERSECTION SOUTH TO METRA (b) RAILROAD INTERSECTION NORTH (c) RAILROAD INTERSECTION GRADE SEPARATION (d) FUELING SYSTEM REPLACEMENT UNITED CARGO BUILDING R/W 10L PAVING & ELECTRICAL R/W 10L NAVAIDS 10C BERMS 5 AND 6 & 10L SITE PREPARATION R/W 10C-28C MASS GRADING (EAST) R/W 10C-28C PAVING & ELECTRICAL (WEST) R/W 10C-28C PAVING & ELECTRICAL (EAST) & R/W 10C-28C NAVAIDS SOUTH SERVICE ROADS R/W 10C-28C MASS GRADING & CONSTRUCTION (CENTRAL) R/W 10L MASS GRADING BENSENVILLE LAND ACQUISITION AREAS CARGO TUNNELS & TAXIWAY 45 R/W 10L TAXIWAYS FEDEX CARGO BUILDING INTERIM RAIL RELOCATION & CARGO ACCESS RD BENSENVILLE DITCH RELOCATION ALTERNATE BENSENVILLE DITCH RELOCATION SOUTH BASIN SITE PREPARATION Contract Awarded Under Construction Contract Completed AIRFIELD VAULTS & ASSOCIATED DUCT BANKS (combined w/North) (b) R/W 10C-28C CARGO TUNNEL EXTENSION (a) (b) (c) (d) (c) SOUTH RTR’S R & S and LLWAS LLWAS (a) RTR – R (b) RTR – S (c) (a) 10C-28C CARGO AREA SITE PREPARATION CARGO APRON

Disclaimer – Any and all information contained herein is subject to change without notice 4 Compacting asphalt grindings for bituminous paving of proposed service road. Irving Park Road berm facing South. Berms 5 & 6 facing North. Berms 5 and 6 facing Northeast. Work in Progress Photography: 10C Berms 5 & 6 and 10L Site Prep

Disclaimer – Any and all information contained herein is subject to change without notice 5 Work in Progress Photography: South Basin Site Prep Phase 1B - Taxiway ZJ tie in. Placement of concrete pavement for Taxiway ZJ. Replacement of 66" Stormsewer above Stormsewer System 1H. Finishing of concrete pavement for Taxiway ZJ.

Disclaimer – Any and all information contained herein is subject to change without notice 6 Excavating for CED Manholes facing South.South face of Berm 3. CED Manholes installed facing Northwest. Crane at Jacking Location 3. Work in Progress Photography: 10L Mass Grading

Disclaimer – Any and all information contained herein is subject to change without notice 7 Stripping topsoil for storm sewer installation. Preparation of construction ramps. Overall view of existing South Basin. Work in Progress Photography: 10C-28C Mass Grading Embankment of construction ramps for access to Stormsewer Systems E & F.

Disclaimer – Any and all information contained herein is subject to change without notice 8

9

10

Disclaimer – Any and all information contained herein is subject to change without notice 11

Disclaimer – Any and all information contained herein is subject to change without notice 12

Disclaimer – Any and all information contained herein is subject to change without notice 13

Disclaimer – Any and all information contained herein is subject to change without notice 14