Work Breakdown Structure WBS

Slides:



Advertisements
Similar presentations
Project Control: Developing the As-Planned S-Curves
Advertisements

Building Codes, Zoning Ordinances
Work Breakdown Structure WBS
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Measuring Concrete Work
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
THE HIERARCHY OF SCHEDULES. DR. Nabil Dmaidi 1. Materials Need to determine – Quantities takeoff – Availability and probable delivery time – Type of materials.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
ONE-WAY SLAB. ONE-WAY SLAB Introduction A slab is structural element whose thickness is small compared to its own length and width. Slabs are usually.
تکنیک های تجزیه کار فرشاد آقابزرگی هوش تجاری.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Project Management Session 7
Time and Cost Estimation
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Project Plan Development
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Work Breakdown Structure vA hierarchical system which sub-divides larger elements of the project into smaller elements called “work packages”.
Work Breakdown Structure Workshop
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Construction Specifications
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
1 Project Planning Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 4 2 nd Semester 2008/2009 UP Copyrights 2008 Construction.
PLANNING AND SCHEDULING
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Adult Education and Literacy Budget Development and Cost Allocation.
Geog 469 GIS Workshop Project Management.
Tulkarem Multipurpose Sport Hall Prepared by: Moatasem Ghanim Abdul-Rahman Alsaabneh Malek Salatneh Supervisor: Dr. Shaker Albitar.
Formats ACT 380.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Estimating Activity Duration Time Interval –Time Interval is selected according to the nature of the activity (seconds - minutes …) –It is common practice.
Measuring Palestinian labors productivity Rates for Block, Steel and excavation works Measuring Palestinian labors productivity Rates for Block, Steel.
Estimating Project Time and Cost
W ORK B REAKDOWN S TRUCTURE (WBS). W ORK B REAKDOWN S TRUCTURE  A method to organize the project total scope of work in a hierarchical structure where.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
CVE 4070 Construction Engineering Project Budget & Cost Control Prof. Ralph V. Locurcio, PE.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
WBS Work Breakdown Structure © Unitec New Zealand.
Estimating and Scheduling CEE 492
MENG 446 : Management of Engineering Projects
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Leads Institute of Technology & Engineering
Measuring Palestinian Labors Productivity
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
SOURCES OF ESTIMATION DATA
Using project records to show delay and disruption
FORMWORK DR. Nabil Dmaidi.
Equipment Costs and Sources of EQUIPMENT COST
Welcome to My Presentation
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Awarding Criterion for late tender: the lowest bid- why?
4th Annual Construction Law Summit
Minuteman Vocational Technical Regional High School Progress
Concrete Structures DR. Nabil Dmaidi.
Building Construction I Sofia Sebastian 1
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
THE HIERARCHY OF SCHEDULES
Masonry Bearing Walls.
Basic Principles of Estimating
6th. Semester Schedule: 1st. Week
Muskat Secondary School Project
Presentation transcript:

Work Breakdown Structure WBS DR. Nabil Dmaidi

Work Breakdown Structure (WBS) A hierarchical system which sub-divides larger elements of the project into smaller elements. The smallest unit of the WBS is the work package. DR. Nabil Dmaidi DR. Nabil Dmaidi

Work Breakdown Structure Example Level Work Breakdown Structure Level Description 1 Warehouse Total Project 2 Administration Mobilization/ Demobilization Masonry Wall Steel Columns & Joints Roof System Subproject 3 Sitework Footing Floor Slab Masonry Wall Steel Columns & Joints Roof System Interior Finishes Category of Work 4 Excavate Footings Form & Reinforce Footings Place Footings Work Package 5 Labor Material Equipment Resources DR. Nabil Dmaidi

WORK BREAKDOWN STRUCTURE (cont.) The scope of work in each work package should be defined to avoid overlaps and omissions between work packages. Work packages should be defined in terms of design, construction methods, and completion requirements, with associated performance dates DR. Nabil Dmaidi

Scope of Work Packages Each work packages should be: 1. Manageable Specific authority and responsibility can be assigned. 2. Independent With minimum interfacing or dependence on other elements. 3. Measurable In terms of progress. DR. Nabil Dmaidi

The Project Cost System Objectives of Establishing Project Cost System. 1. Keep the construction costs of the project within the established budget 2. Develop labor and equipment productivity information for estimating the cost of future work. DR. Nabil Dmaidi

Cost Code Project Number Area Code Work Type Code Distribution Code 9708B 05 03157.20 3 Cost Code for stripping concrete formwork for bridge deck (Labor). DR. Nabil Dmaidi

Project Number 9708B 05 03157.20 3 Eighth project in 1997 (Bridge) DR. Nabil Dmaidi

Area Code 9708B 05 03157.20 3 Geographic location OR Associate Field Cost to Specific Supervisor or Management DR. Nabil Dmaidi

Work Type Code 9708B 05 03157.20 3 03 Concrete 0315 Concrete Formwork 03157 Wood Concrete Formwork 03157.20 Wood Concrete Formwork for Deck 03157.30 Wood Concrete Formwork for Abutment DR. Nabil Dmaidi

Distribution Code 9708B 05 03157.20 3 1. Total 2. Material 3. Labor 4. Equipment 5. Sub-Contract DR. Nabil Dmaidi

Cost Code and Cost Control All items of expense are charged to the project where they are incurred. "General" or "miscellaneous" cost accounts should not be used, are poor practice, and should be avoided. The cost code is to serve its basic purpose, it must be understood and used consistently by all company personnel. DR. Nabil Dmaidi

COST ACCOUNTING REPORTS Cost report intervals are a function of the project size, nature of the work, and type of contract involved. There must be a balance between the cost of generating the reports and the value of the management information received DR. Nabil Dmaidi

COST CODES The most widely used cost codes are Masterformat, CSI (Construction Specifications Institute) Uniformat, UCI (Uniform Construction Index). Masterformat is widely used software companies and government agencies. DR. Nabil Dmaidi

Most contractors match their cost control system to their payroll periods and to their time-monitoring system. DR. Nabil Dmaidi

COST CODES (cont.) Masterformat Uniformat Has 16 divisions Divisions were developed according to trades Uniformat Has 12 divisions Tends to follow the progress of construction DR. Nabil Dmaidi

Relationship Between UNIFORMAT & MASTEFORMAT DR. Nabil Dmaidi

UNIFORMAT Level A and B DR. Nabil Dmaidi